Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MEPFP Engineering (Mechanical, Electrical, Plumbing, Fire Protection)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, Maryland, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant team for the Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements project. The scope of work involves establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating and designing a shared-use path from Granite Avenue to Octoraro Park. The primary objective is the delivery of an actionable 30 percent design and basis-of-design package, with the potential for future Plans, Specifications and Estimates if funding permits. This is a qualifications-based selection process conducted in accordance with the Brooks Act and 23 U.S.C. 1122. Proposals are evaluated based on the proposed team and key staff, project understanding and approach, and related project experience, with each criterion weighted equally. Interested firms must submit a technical proposal of no more than 25 pages by November 16, 2026. Attendance at the pre-proposal meeting on October 28, 2026, at 11:30 AM is mandatory for all submitting firms. The selected consultant must maintain professional liability insurance of at least 1,000,000 dollars per occurrence and comply with federal provisions regarding civil rights, equal opportunity, and suspension and debarment eligibility. While the Disadvantaged Business Enterprise contract goal for Phase I is zero percent, all nondiscrimination and reporting obligations remain in effect. Because this is a qualifications-based selection, firms are instructed not to submit fee or price information; compensation will be negotiated with the highest-ranked firm following the evaluation process.
Town of Port Deposit

POSTED

about 15 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract entails the comprehensive engineering design of mechanical, electrical, plumbing, fire protection, and life safety systems for a project under the University System of Georgia's Board of Regents. This includes full-scope design services for HVAC, electrical power and lighting, plumbing, fire suppression, and life safety systems, with mandatory integration of energy modeling and sustainable design principles to ensure efficiency and environmental compliance. The work is classified under NAICS code 541330 as an architectural and engineering service and is structured as a subcontract opportunity with no set-aside restrictions. The solicitation was posted on May 12, 2026, and responses are due by June 2, 2026, with the place of performance located within Georgia under the oversight of the state’s university system. All technical deliverables must align with applicable codes and sustainability standards, emphasizing performance-based design and energy optimization throughout the building systems.

General Info

Design of MEPFP systems with energy modeling and sustainable principles for University System of Georgia.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-47200-RFQ-2026-000000127.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GSOU J-460-DP School of Optometry

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Full design of HVAC, electrical power and lighting, plumbing, fire suppression, and life safety systems, including energy modeling and sustainable design integration.

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

New
SLED
UGA_BR-10-2702 DP Oglethorpe House Renovation
Solicitation # PE-47200-RFQ-2027-000000162
The Board of Regents of the University System of Georgia is soliciting design professional services for the renovation and modernization of Oglethorpe House, a nine-story residential facility encompassing approximately 93,538 square feet in Athens, Georgia. The project aims to address aging building systems and facility deficiencies while ensuring compliance with current life safety, accessibility, and operational standards. Key scope requirements include modernizing mechanical, electrical, and plumbing infrastructure, installing a fire command center, an emergency generator, and stairwell pressurization systems, as well as increasing the number of ADA-compliant rooms and providing a stretcher-compliant elevator cab. The estimated construction cost is 33.5 million dollars, with a design professional base fee of approximately 2.345 million dollars. The selection process is a multi-step evaluation following the State Construction Manual. Initial qualifications are weighted based on relevant project experience (45 percent), suitability for the project (30 percent), and firm stability (25 percent). Finalists will be interviewed and evaluated on team qualifications (50 percent), design methodology (25 percent), and communication skills (25 percent). Proposers must submit a PDF package not exceeding 50 pages to the BOR Egnyte platform by November 17, 2026, at 2:00pm. Required documentation includes notarized certification forms, a contractor affidavit for the Georgia Security and Immigration Compliance Act, and a proposer's disclosure statement. All designs must adhere to the campus master plan and the Energy Efficiency and Sustainable Construction Act of 2008, with Georgia Peach certification required during commissioning.

POSTED

about 22 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS