Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on March 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Methacrylate Coating Material Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 325510
New
DIBBS
POLYURETHANE COATING
Solicitation # SPE8ES-27-T-0282
Solicitation SPE8ES-27-T-0282 is a request for quotations for the procurement of Polyurethane Coating for aircraft surfaces, specifically a high-solids, multi-component topcoat with extended weather ability and gloss green color. The requirement consists of three line items totaling 20 kits, with specific NSNs including 8010-01-583-4774. Each kit comprises a pigmented polyester resin and solvent (Component A) and a clear aliphatic isocyanate (Component B) totaling 2 quarts. Delivery is required within five days after order, with shipments directed to Ramstein Air Base in Germany and Edwards Air Force Base in California on an FOB Destination basis. The materials are classified as hazardous (HAZMAT) and must be stored between 60-80 degrees Fahrenheit. Suppliers must provide Safety Data Sheets (SDS) and Hazard Communication Standard labels in accordance with 29 CFR 1910.1200 prior to award. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, requiring each kit to be contained in a single box with appropriate cushioning and a detailed contents list. The contract is subject to various FAR and DFARS regulations, including the Buy American Act, safeguarding covered defense information, and the use of the Wide Area Workflow (WAWF) system for electronic invoicing and receiving reports. Inspection and acceptance will occur at the destination.
Defense Logistics Agency

POSTED

about 7 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This subcontract opportunity, issued by the California Department of Transportation, involves the supply of a methacrylate resin-based protective coating system. The required materials must include all necessary components for a complete application, specifically the primer, base, and topcoat. The solicitation was posted on March 25, 2024, with a response deadline of April 30, 2024. Classified under NAICS code 325510, this procurement focuses on the delivery of specialized chemical coating materials to support agency infrastructure projects.

General Info

Documents

This scope was carved out of 11-2N1694.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Grind bridge deck, place polyester concrete, and apply methacrylate.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of methacrylate resin-based protective coating system, including primer, base, and topcoat components.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Alameda County In Berkeley And Albany From Heinz Avenue To 0.1 Mile South Of Contra Costa County Line
Solicitation # 04-2Y3014
Solicitation 04-2Y3014 is a construction project issued by the California Department of Transportation for work on State Highway 123 in Alameda County, specifically within Berkeley and Albany from Heinz Avenue to 0.1 mile south of the Contra Costa County Line. With an estimated value of 22 million dollars, the project scope encompasses comprehensive infrastructure improvements including the construction of sidewalks, curb ramps, asphalt and concrete pavement, and the installation of electrical and drainage systems. Additional requirements include earthwork involving barium contaminated soil, landscape planting, erosion control, and the installation of site furnishings such as bus shelters, bike racks, and trash receptacles. The project also necessitates a robust traffic control system, temporary barrier systems, and the implementation of a Lead Compliance Plan and a Stormwater Pollution Prevention Plan. Bids must be submitted on a unit price basis by December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates compliance with Buy America standards, prevailing wage rates, and specific environmental product declarations for asphalt and concrete. Performance requires a Level 2 Critical Path Method schedule and the designation of a certified on-site safety representative. Contractors must coordinate with various utility owners including PG&E, AT&T, Comcast, and EBMUD, and obtain necessary encroachment permits from the cities of Berkeley and Albany. Job site activities are expected to commence within 55 days of contract approval by the Attorney General.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County At Leggett From 0.1 Mile North Of Route 1 To The Humboldt County Line Near Piercy
Solicitation # 01-0J9904
Solicitation 01-0J9904 is a construction project issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project scope covers the segment from 0.1 mile north of Route 1 at Leggett to the Humboldt County line near Piercy, specifically between Post Mile T91.3 and T106.8. Key work activities include the placement of hot mix asphalt, replacement of signs, and improvements to drainage systems. The estimated cost for the project is 24 million dollars, with a required bid range of 140 to 200 working days. Bids are set to open on December 10, 2026, and job site activities must commence within 55 days of contract approval by the Attorney General. The contract is governed by 2025 Standard Specifications and Standard Plans, with specific modifications detailed in the Special Provisions across multiple divisions, including earthwork, surfacing, structures, and electrical work. Performance is subject to strict environmental and technical constraints, such as limiting work within drainage channels to the period between June 15 and October 15. Compliance requirements include Buy America/Build America standards, prevailing wage rates as determined by the California Department of Industrial Relations, and specific certifications for small businesses and Disabled Veteran Business Enterprises. Additionally, the contractor must designate an on-site safety representative and adhere to rigorous quality assurance standards for concrete and electrical components.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS