Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MH-139 Rotor Brake

Closed
MH139-CR05Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336413
New
DIBBS
INDICATOR, BYPASS
Solicitation # SPE4A7-26-R-0755
Solicitation SPE4A7-26-R-0755 is a sealed bid for a Firm Fixed Price, Indefinite Quantity Contract (IQC) issued by DLA Aviation for the procurement of Bypass Indicators (NSN 2915-01-313-4615). The contract encompasses a five-year base period with a guaranteed minimum quantity of 20 units and an estimated annual requirement of 80 units. This item is designated as an Air Force Critical Safety Item (CSI) and is source-controlled, requiring manufacture and testing in accordance with specific limited rights data and basic drawing 99167 5907808. Due to the proprietary nature of the technical data package, only vendors with existing access to the data or traceability to approved sources are eligible to quote. The contract mandates strict quality and security compliance, including SAE AS9100 higher-level quality requirements and Cybersecurity Maturity Model Certification (CMMC) Level 2. Inspection and acceptance are conducted at the origin, with sampling performed according to MIL-STD-1916 or ASQ H1331, requiring zero non-conformances for acceptance. Packaging must adhere to MIL-STD-2073-1E and RP001, while marking must comply with MIL-STD-129, including the contractor and manufacturer CAGE codes and part numbers. Delivery is specified as FOB Destination with a lead time of 308 days after receipt of order. Award determination will be based on a comparative assessment of price, past performance, and other evaluation factors, with SPRS assessments weighted most heavily within the past performance category.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Air Force, through the Air Force Life Cycle Management Center’s MH-139A Program Office, is seeking market information to identify qualified vendors capable of designing, integrating, and testing a rotor brake system for the MH-139A helicopter. The goal is to enhance ground safety and operational efficiency by adding a rotor brake to suppress rotor movement during high-wind conditions, reduce wear on the rotor system, and accelerate ground turn-around times. The Government intends to leverage the commercial baseline rotor brake system from the Leonardo AW139, with a specific part number identified for procurement and installation across the entire MH-139A fleet. The system must integrate seamlessly with existing aircraft avionics, hydraulic, and engine control systems, including critical software interlocks within the Operational Flight Program, Crew Alerting System, and Full Authority Digital Engine Control to prevent unsafe engagement during flight. The vendor must ensure compliance with FAA and military airworthiness standards, address structural impacts on the transmission and gearbox, and deliver a complete engineering data package to obtain both a Supplemental Type Certificate and support an Engineering Change Proposal. Respondents are required to provide detailed technical and business information, including company certifications, experience with similar vertical lift aircraft modifications, and a clear approach to system integration, certification, and training updates. Proposals must include a Rough Order of Magnitude cost estimate broken down into non-recurring engineering and per-aircraft modification kit installation, along with a timeline from contract award to initial operational capability. Vendors must demonstrate ownership of required technical data, proficiency in obtaining FAA STCs and military ECPs, and risk mitigation strategies for integration challenges such as FADEC compatibility and dynamic load management. All responses must be submitted electronically before the deadline, not exceed 15 pages, and properly mark proprietary information. Interested parties must be registered in SAM and respond as either prime contractors or subcontractors, with small businesses expected to address subcontracting limitations if the requirement is later set aside. All submissions will be used for market research only, with no reimbursement for response costs, and unmarked information will be deemed publicly releasable.

General Info

U.S. Air Force seeks vendor to integrate FAA-certified Leonardo rotor brake on MH-139A fleet, ensuring safe system integration and compliance with military and aviation standards.

Agency

Department Of Defense → FA8692 Helicopter Pgm Aflcmc WihView Agency

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

Wright Patterson AFB, OH, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8692 Helicopter Pgm Aflcmc Wih
Contacts2 people available
OfficeWRIGHT PATTERSON AFB, OH, 45433-7104, USA
Organization / Agency
Department Of Defense → FA8692 Helicopter Pgm Aflcmc Wih
View Agency Profile
Office AddressWRIGHT PATTERSON AFB, OH, 45433-7104, USA
Contacts

Full Description

Show more

This Request for Information (RFI) is issued for informational and market research purposes only in accordance with Federal Acquisition Regulation (FAR) Part 10. It does not constitute a solicitation, a Request for Proposal (RFP), or a promise to issue an RFP in the future. The Government will not reimburse any company or individual for expenses associated with preparing or submitting information in response to this RFI. The information provided may be used by the U.S. Air Force in developing its acquisition strategy, Statement of Work (SOW), and performance specifications. Interested parties are responsible for adequately marking proprietary or competition-sensitive information.


BACKGROUND AND SCOPE


The Air Force Life Cycle Management Center (AFLCMC), MH-139A Program Office (AFLCMC/WIH), is conducting market research to identify sources capable of designing, integrating, and testing a rotor brake for the MH-139A.


The objective of this effort is to integrate a rotor brake system on the MH-139A to support safe and efficient ground operations, particularly in high-wind environments. The addition of a rotor brake capability will optimize ground turn-around times, facilitate rapid refueling operations, reduce rotor system wear, and enhance overall ground safety for aircrew and support personnel.


To meet this requirement, the Government intends to leverage the commercial baseline rotor brake system developed for the Leonardo AW139 (the commercial variant of the MH-139A).


Technical support is expected during the initial implementation and testing of the new configuration. Subject matter expert support is expected for a period after initial implementation and testing.


Key requirements for the modified system include:


  • Procurement & Installation: The objective is to procure and install the commercial baseline Rotor Brake (e.g., P/N 3G6351F00113 per AW139 RFM Rev 27 Sup 1).
  • Standardization: Installation must be standardized across all configurations of the MH-139A fleet.
  • Systems & Software Integration: The installation must safely interface with the aircraft's existing avionics, hydraulic systems, and engine controls. This includes all necessary software interlocks (e.g., within the Operational Flight Program [OFP], Crew Alerting System [CAS], and Full Authority Digital Engine Control [FADEC]) to prevent inadvertent engagement during flight or high-power ground operations.
  • Airworthiness & Structural Integrity: Follow all applicable Federal Aviation Administration (FAA) and MIL-HDBK-516C guidelines. The vendor must account for the added weight and vibration characteristics of the rotor brake assembly to ensure it does not negatively impact the fatigue life or structural limits of the transmission/main gearbox deck.
  • Support & Fit-Testing: Provide technical support during initial installation and testing. The Government will provide scheduled access at a Government-designated facility for fit-checks. The contractor must provide all hardware required for fit-checks. The Government will not provide any Furnished Equipment (GFE).
  • Certification & Airworthiness Pathway: Ability to deliver the complete engineering data package necessary to obtain an FAA-approved Supplemental Type Certificate (STC) and support a military Engineering Change Proposal (ECP).
  • Certification Experience: Describe your company's process, timeline, and prior experience in executing ECPs and obtaining FAA STCs for dynamic/drive system modifications on vertical lift aircraft.
  • Risk Mitigation: Identify potential engineering challenges (e.g., FADEC integration, dynamic load limits, hydraulic routing) associated with obtaining an FAA-approved STC and supporting a military ECP for this project, and provide recommended strategies to mitigate these risks.

INSTRUCTION TO POTENTIAL RESPONDENTS 


Respondents are encouraged to provide comprehensive responses that demonstrate existing technology, qualifications, and experience. Please structure your response to address the following sections: 


A. Company Information:


  • Company Name, Address, CAGE Code, and Website URL. 
  • Point of Contact (Name, Title, Phone, Email). 
  • Business Size Status under NAICS Code 336413 (Aircraft Manufacturing), with a size standard of 1,500 employees. Please self-certify for all applicable categories: 
  • Small Business (Yes/No) 
  • Woman-Owned Small Business (WOSB) (Yes/No) 
  • HUBZone Certified (Yes/No) 
  • Service-Disabled Veteran-Owned Small Business (SDVOSB) (Yes/No) 
  • Company Ownership (Domestic or Foreign-owned). 
  • Interest as Prime Contractor or Subcontractor. 

B. Technical Capability: 


  1. Provide a detailed description of your proposed solution(s). Include concept diagrams, illustrations, and preliminary specifications. 
  2. Describe the process for procuring, installing, and testing the rotor brake. Include estimated timelines for these phases, as well as expected lifecycle maintenance actions (repair intervals, consumables, life expectancy).
  3. State whether your company possesses the necessary technical data and proprietary rights for the MH-139A (based on the Leonardo AW139 platform) to perform this dynamic modification.
  4. Detail your company's experience with similar drive system/transmission modifications on vertical lift aircraft.
  5. Outline your approach to system integration. Explicitly detail how your solution addresses the required electrical, hydraulic, and software interlocks (OFP/CAS/FADEC) to ensure flight safety.
  6. Provide an impact analysis on how aircrew/maintenance training and training systems (e.g., flight simulators, maintenance trainers) will need to be updated to reflect the new rotor brake configuration, including a proposed timeline and associated risks.

C. Cost and Schedule:


  1. Provide a Rough Order of Magnitude (ROM) cost estimate broken down into two parts:
    • Non-Recurring Engineering (NRE): Design, systems integration (including software updates), fit-testing, and ECP/STC certification data package support, to include the engineering source data required for TCTO generation and Technical Order (TO) updates.
    • Modification Kit/Installation: The per-aircraft cost for the physical Modification Kit and field installation.
  2. Provide an estimated timeline from contract award to the development, testing, and initial operational capability of the first retrofitted aircraft.

Small Business Utilization:


  • For Small Businesses: Describe how you will comply with FAR 52.219-14, Limitations on Subcontracting, if the requirement is set-aside. 
  • For Large Businesses: Provide a realistic small business utilization target as a percentage of total contract value and explain your rationale. 

RESPONSES AND COMMUNICATIONS 


  • Responses shall not exceed 15 pages (single-sided, 12-point font). 
  • Submit responses electronically by 
  • Mark all proprietary information clearly. Unmarked information will be considered publicly releasable. Be advised that government-contracted support personnel may handle submissions under non-disclosure agreements. 
  • Prospective contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS