Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on May 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MI-65 Transfer Piping

Closed
ISD-366397-ROFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

332996 - Fabricated Pipe and Pipe Fitting Manufacturing

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

SBA

Documents

26

Amendment 01 - ISD-366397-RO - MI-65 Transfer Piping

PDF, High priority: read this firstamendment
High

Amendment 02 - ISD-366397-RO (MI-65 Transfer Piping)

PDF, High priority: read this first2 pages · amendment
High

Construction Environmental, Safety & Health Certification (CESHC)

PDF, High priority: read this first3 pages · specifications
High

Exhibit A - Price Proposal Form Construction (ISD-366397-RO)

PDF, High priority: read this first1 page · rfp
High

Exhibit C - 010010 General Requirements: MI-65 Transfer Piping

PDF, High priority: read this first19 pages · specifications
High

Exhibit D - 013100 Environment, Safety, and Health Requirements

PDF, High priority: read this first72 pages · specifications
High

Fermi WPS SS-9-002 Welding Procedure Specification

PDF, High priority: read this firstspecifications
High

FFDG General Terms and Conditions for Construction (01.2025)

PDF, High priority: read this first25 pages · contract-document
High

General Decision Number IL20250008 - Wage Determination

PDF, High priority: read this firstwage-determination
High

MI-65 Transfer Piping - Addendum 1

PDF, High priority: read this first5 pages · amendment
High

MI-65 Transfer Piping - Exhibit B2 Drawings

PDF, High priority: read this first5 pages · specifications
High

MI-65 Transfer Piping Statement of Work

PDF, High priority: read this firstsow
High

Proposal Certifications Form PUR-466

PDF, High priority: read this first9 pages · proposal-certifications
High

RFP ISD-366397-RO: MI-65 Transfer Piping

PDF, High priority: read this first10 pages · rfp
High

Sample Subcontract - Fermi Forward Discovery Group, LLC

PDF, High priority: read this first5 pages · contract-document
High

Section 013300 - Submittals

PDF, High priority: read this first6 pages · specifications
High

Section 014100 - Quality Requirements (January 2024)

PDF, High priority: read this firstspecifications
High

Summary of Required RFP Submittal Documents

PDF, High priority: read this first3 pages · specifications
High

Exhibit H - 2025 Construction Insurance Requirements

PDF, Low priority3 pages · other
Low

Exhibit S - Sitemap Map

PDF, Low priority1 page · other
Low

Fermi Forward Discovery Group - Subcontractor Annual Representations & Certifications (SARC) Rev 4

PDF, Low priorityreps-certs
Low

Fermilab Subcontractor Injury & Illness Data Questionnaire Rev.07/2018

PDF, Low priority2 pages · other
Low

Payment Bond Standard Form 25A for Fermi Forward Discovery Group, LLC

PDF, Low priority3 pages · contract-document
Low

Performance Bond Standard Form 25 for Fermi Forward Discovery Group, LLC

PDF, Low priority4 pages · contract-document
Low

Standard Form 24 Bid Bond FL-41

PDF, Low priority4 pages · other
Low

Statement of Acknowledgment SF-1413

PDF, Low priority2 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from May 22, 2025 to Jun 10, 2025.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA

Full Description

Show more
You are invited to submit a proposal for the items specified in this Request for Proposal (RFP), by the provisions contained herein, and the terms and conditions of the proposed firm fixed price subcontract entered into as a result of this solicitation. This is a small business set-aside. The North American Industry Classification System (NAICS) code for this solicitation is 332996, Fabricated Pipe and Pipe Fitting Manufacturing. The small business size standard for this NAICS code is $45.0 Million A Pre-Proposal Meeting and Site Visit is scheduled for 10:00 A.M, Central Time, May 01, 2025, at Wilson Hall West Entrance Lobby. The meeting provides an opportunity to discuss and clarify the RFP. However, nothing said or represented in the meeting shall be deemed to modify RFP requirements unless followed by a written amendment. Offerors are requested to submit questions relative to the RFP in advance of the meeting so the Procurement Specialist may prepare responses. Offerors participation at this meeting is strongly recommended. Except for those already having a Fermilab Access badge, anyone attending the Pre-Proposal Meeting and Site Visit must fill out an Access Request form (see link below) at least seven (7) days before the scheduled date and preferably be a U.S. Citizen. Onsite access approvals are dependent on citizenship status and the location(s) being visited. In addition, please review the Business Visitor Registration Instruction Instructions and Directions provided as part of the RFP. https://fermi.servicenowservices.com/expert_shell.do?sysparm_sys_id=63f9f6a8dbd148104e65ff621f 961975. Upon request approval, the individual will receive an informal invitation letter with a QR code, which is required to be presented at the security gate, otherwise, access to Fermilab will be denied. When checking in at the Security Gate House, the individual will be required to present a Valid Driver's License (Real ID) and the informal invitation letter with the QR code, and the Visitor and Business Visitor Attestation Form. If the Driver's License is not Real ID compliant, one of the appropriate REAL Page 3 of 9 ID documents (https://www.tsa.gov/travel/security-screening/identification) is required. Masks are required to be worn when the Community Covid Level of - high exists. Individuals are then required to wear a KN-95 or N-95 mask. Unfiltered cloth masks are not permitted to be worn alone but can be worn over a Level 2 medical mask (double mask). Please note that when entering Fermilab: - No weapons, firearms, or ammunition (regardless of concealed and carry permit) are allowed on-site. - No explosives or any other apparatus or material hazardous to the public or property are allowed on-site. - Illinois Rules of the Road are to be followed while driving on Fermilab's premises. 1.1 Description The MI-65 transfer piping project shall demolish and rebuild piping that connects two tanks within the MI-65 service building. The existing piping system consists of double wall PVC piping, bulk head fittings, valves, and fittings. The new replacement piping system consists of welded stainless steel piping and flanged valves, constructed to the requirements of ASME B31.3 and FESHM 5031.1. 1.2 Scope The subcontractor shall perform the following scope of work to provide FermiForward with a fully functioning piping system at MI-65. 1.2.1 CONSTRUCTION WORK The subcontractor shall perform the following work: 1. Demolition of existing double wall PVC Piping connecting the two tanks within MI-65 in accordance with FermiForward disposal of materials. FermiForward shall inspect demolished piping prior to disposal. 2. Submission of Welder Qualification Record complying with specification section SS-9- 002, or alternate qualification record meeting or exceeding specification section SS-9- 002. 3. Welding a coupon weld in the presence of FermiForward's authorized representative. 4. Welding the new piping system with at least 10% of the welds examined by FermiForward's authorized representative. 5. Hydrostatically testing the system upon completion of assembly. 1.3 Activities and Timeline 1.3.1 TIMELINE The subcontractor shall comply with the following timeline: 1. Milestone 0 - 0 Calendar Days - Notice to Proceed (NTP). This milestone marks the point where construction work may begin; 2. Milestone 1 - 14 Calendar Days - All material submittals; 3. Milestone 2 - 90 Calendar Days - Complete with punch-list items remaining, piping installed and tested and placed into operations. 4. Milestone 3 - 105 Calendar Days - Project Complete

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC is soliciting firm-fixed price proposals under RFP 388000kmb for the fabrication and delivery of hot-dipped galvanized carbon steel bar grating and associated saddle clips. These materials are required for the VD Cryostat Roof Decking as part of the LBNF/DUNE project. The scope includes various sizes of bar grating with bearing bars measuring 1.5 inches tall by 3/16 inches thick and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical requirements specify a minimum live load of 100 PSF, a minimum concentrated load of 1000 LB, and a maximum deflection of 0.25 inches. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 6, 2026. A complete submission package requires a proposal including lead times, a completed first page of the RFP, the Subcontractor Annual Representations and Certifications (SARC), and the PROC-FRM-466 Proposal Certifications. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process, with a strong emphasis on strict adherence to technical specifications and FFDG terms and conditions to avoid disqualification. Delivery is required FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. All items must be bundled and packaged to comply with the Ross Shaft Load Envelopes and Shipping Expectation guidelines to ensure compatibility with warehouse handling capabilities. Post-award deliverables include a detailed logistics and shipping plan and all applicable operator manuals. The contract is subject to various federal regulations, including Buy American requirements and FAR anti-discrimination laws.
Ornamental and Architectural Metal Work Manufacturing

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 332911
New
Federal
PIP-II CM 2K Pressure Safety Device - Rupture Disks
Solicitation # 387878-DSF
Fermi Forward Discovery Group, LLC, operating the Fermi National Accelerator Laboratory (Fermilab), is soliciting firm-fixed price proposals under solicitation 387878-DSF for the procurement of thirty-three cryogenic non-reclosable rupture disk cartridges. These components are required for the Proton Improvement Plan II (PIP-II) Cryomodule relief system and must be designed for sub-atmospheric cryogenic conditions of approximately 2 K and 30 mbar absolute pressure. The requirement includes disks with set pressures of 3.1 barg and 1.75 barg, constructed from Inconel, and equipped with normally closed burst alert sensors on the outlet. All disks must be ASME Section VIII Code NB/UD stamped and meet a helium leak rate specification of 10^-8 atm-cc/sec. Proposals must be submitted via email to Seth Fryar by October 30, 2026, at 2:00 PM Central Time. Submissions must include a technical proposal demonstrating merit and five years of relevant experience, a delivery schedule, and a price proposal using the provided Exhibit F pricing sheet. Award will be granted to the lowest evaluated proposal that meets all technical and past performance acceptability standards. The contract requires strict adherence to various federal regulations, including the Buy American Act, FAR anti-discrimination laws, and DOE site access and safety requirements. Delivery is FOB Destination to Batavia, Illinois, where Fermilab will conduct visual, mechanical, and certification inspections within two weeks of receipt.
Industrial Valve Manufacturing

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 331491
Federal
PIP-II Niobium Sheets, Rings, and Disks
Solicitation # 385634-DSF
Fermi National Accelerator Laboratory (FNAL), through the Fermi Forward Discovery Group, LLC, is soliciting firm-fixed price proposals for the manufacturing, testing, certification, and delivery of high-purity Niobium and Niobium-Alloy components. These materials, which include RRR300 Niobium sheets, Nb55Ti rings and disks, and forged Niobium rings, are critical for superconducting radio-frequency cavities used in the Proton Improvement Plan II (PIP-II) project. All deliverables must adhere to strict technical specifications, including a Residual Resistivity Ratio (RRR) value greater than 300 and compliance with ASTM B-391, B-393, and E-8/E-384 standards. Materials must be delivered FOB Destination to Batavia, Illinois, with specific requirements for non-abrasive packaging and permanent product inscription for traceability. Proposals are due by November 10, 2026, and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Evaluation is based on a best-value trade-off where technical merit, quality assurance plans, and past experience are significantly more important than price. Offerors must provide a minimum of three relevant examples of similar work from the past five years and a detailed project schedule. Mandatory submissions include the SARC (PROC-FRM-100) and Proposal Certifications (PROC-FRM-466) forms. The contract incorporates various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) clauses, including strict prohibitions against racially discriminatory DEI activities under FAR 52.222-90 and compliance with the Buy American Act.
Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding

POSTED

10 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS