Michigan Avenue Sidewalk Gap Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Michigan Avenue Sidewalk Gap Improvements project in San Joaquin County, California, aims to establish a safe pedestrian walkway and improve drainage along the right side of Michigan Avenue from Kirk Avenue to 1,000 feet east. The scope of work includes installing 1,000 feet of concrete curb, gutter, and a 5-foot sidewalk, widening existing pavement, and installing an ADA ramp at the Kirk Avenue crosswalk. Additionally, the project involves paving driveways, modifying storm drainage facilities, installing two storm drain inlets, adjusting sanitary sewer laterals, and removing five trees. The project is designed to benefit the public and nearby schools by eliminating pedestrian hazards and reducing maintenance issues. Due to the residential nature of the area and the presence of large trees, the project requires environmental considerations regarding nesting migratory birds and the threatened Swainson's Hawk, particularly if construction occurs between February 15th and September 1st. The initiative is managed by San Joaquin County to address the lack of existing sidewalk connections and poor drainage conditions in the area.

General Info

San Joaquin County project installing sidewalk, curb, and drainage on Michigan Avenue, California.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Kirk Avenue, CA

Set-Aside

NONE

Documents

(1)

242501 Filed NOE (Revised Scope)

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssociate Planner

Full Description

Show more
MICHIGAN AVENUE SIDEWALK GAP IMPROVEMENTS Project Description Project Locations: Michigan Avenue: Kirk Avenue to 1,000 feet east of Kirk Avenue. See attached Vicinity Map. Project Justification: Michigan Avenue was originally constructed in 1948 and is a 22-foot-wide roadway, constructed with 2-inch bituminous surfacing over gravel. It was resurfaced in 1992 with a 0.17-foot overlay with fabric as a 44-foot-wide roadway. The curb, gutter, and sidewalk along the left-side (Kirk Avenue to Ryde Avenue), and the portion on the right-side (1,000 feet east of Kirk Avenue to Ryde Avenue), were constructed prior to the 1992 overlay with the widening, however no records are available. In 2011, the roadway was resurfaced by cold planing 0.20 feet of existing pavement and replacing it with 0.20 feet of asphalt concrete, and repairing the existing curb, gutter, and sidewalk by removing and replacing them. Michigan Avenue was last slurry sealed in 2023. Michigan Avenue currently has no safe pedestrian walkway along the right side of the roadway from Kirk Avenue to 1,000 east of Kirk Avenue to serve the public or nearby schools. There is no connection to existing sidewalk facilities. There are also no existing drainage facilities along the right side of the roadway creating poor drainage conditions. Scope of Work: The project will consist of: 1. Installing approximately 1,000 feet of concrete curb and gutter and 5.0-foot concrete sidewalk along the right side of the roadway from Kirk Avenue to 1,000 feet east of Kirk Avenue. 2. Widening the existing pavement from 0 to 3 feet to match the existing pavement depth on the right side of Michigan Avenue within the project limits. 3. Installing one (1) ADA ramp at crosswalk at Kirk Avenue and Michigan Avenue. 4. Paving all driveways with concrete or Hot Mix Asphalt (HMA) from the back of the sidewalk with a slope not exceeding 10%. 5. Modifying storm drainage facilities, including storm drain laterals and inlets, and matching the existing gutter’s flow line with the newly installed gutter flow line. 6. Installing two (2) storm drain inlets. 7. Adjusting existing Sanitary Sewer Lateral as required. 8. Removing 4 trees at 2874 Michigan Ave (3 walnut, 1 small). 9. Removing 1 tree at 2825 Bristol Ave (1 oak). Environmental Setting: In these portions of the San Joaquin County, land usage is primarily residential with single family homes. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these pedestrian and drainage improvements. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, asbestos abatement, tunneling, boring, asphalt and concrete paving, electrical work, and the installation of various piping systems and telecommunications. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters, to ensure labor harmony. Eligible bidders must possess a valid California Contractor's license and provide acceptable insurance. Small Business Enterprises and Veteran-Owned Small Business Enterprises must provide certification from the Department of General Services and the Port of Long Beach PlanetBids portal. Responsible contractors may be required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. This project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Interested firms must contact the Lead Estimator to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237310
New
SLED
Annual Pavement Replacement at Barbours Cut and Bayport Container Terminals - 2027
Solicitation # port-of-houston-authority-1254667
The Port of Houston Authority is soliciting Competitive Sealed Proposals for the 2027 Annual Pavement Replacement project at the Barbours Cut and Bayport Container Terminals. This project involves the replacement of damaged or deteriorated asphalt and concrete pavement across these terminal locations. Interested parties must submit their responses through the Port Authority’s Workday eProcurement System no later than 11:00 a.m. on October 7, 2026. A pre-proposal conference is scheduled for September 24, 2026, at 10:00 a.m. via Microsoft Teams, and registration for this meeting is mandatory. All submitted proposals and required documentation must remain valid for 120 calendar days following the response deadline. Bidders are required to provide a bid security equal to 5% of the highest bid or proposal amount. To receive Small Business Enterprise participation credit, contractors must submit an executed Statement of Intent for each proposed SBE, which must be signed by both the prime contractor and the SBE. This statement must detail the project, subcontract scope, and subcontract amount, while certifying that the SBE will perform a commercially useful function rather than acting as a pass-through entity. The Port Authority reserves the right to reject any or all responses received during this procurement process.
Port of Houston Authority

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details