Michigan Avenue Sidewalk Gap Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Michigan Avenue Sidewalk Gap Improvements project in San Joaquin County, California, aims to establish a safe pedestrian walkway and improve drainage along the right side of Michigan Avenue from Kirk Avenue to 1,000 feet east. The scope of work includes installing 1,000 feet of concrete curb, gutter, and a 5-foot sidewalk, widening existing pavement, and installing an ADA ramp at the Kirk Avenue crosswalk. Additionally, the project involves paving driveways, modifying storm drainage facilities, installing two storm drain inlets, adjusting sanitary sewer laterals, and removing five trees. The project is designed to benefit the public and nearby schools by eliminating pedestrian hazards and reducing maintenance issues. Due to the residential nature of the area and the presence of large trees, the project requires environmental considerations regarding nesting migratory birds and the threatened Swainson's Hawk, particularly if construction occurs between February 15th and September 1st. The initiative is managed by San Joaquin County to address the lack of existing sidewalk connections and poor drainage conditions in the area.
General Info
Agency
NAICS
Place of Performance
Kirk Avenue, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
