This Government Contract opportunity from Department Of Defense was posted on June 3, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Contract N40442-11-C-1022 is an award for the Mid-Term Availability of the USNS PATUXENT (T-AO 201), managed by the Military Sealift Fleet Support Command Norfolk under the Department of Defense. The scope of work encompasses a comprehensive suite of voyage repairs, overhauls, and alterations categorized into various technical sections, including hull structure, machinery, electrical systems, communication and navigation, auxiliary systems, habitability, HVAC, and UNREP gear. The contract utilizes a structured bid schedule of Category A and B work items and requires strict adherence to NAVSEA and MSFSC technical manuals, with quality assurance oversight provided by ABS and MSC representatives.
Key technical requirements include the 12,000-hour overhaul of two Colt-Pielstick main propulsion diesel engines and a 40,000-hour overhaul of the Number 3 Ships Service Diesel Generator. Significant structural and maintenance tasks involve the recoating of ballast tanks using Amercoat 240 epoxy, the repair of various tanks and voids, and the overhaul of the Emergency Diesel Generator hydraulic start system and air start system valves. Additionally, the contract mandates critical electronics upgrades and maintenance, such as the renewal of the GMDSS console, preventative maintenance on the Furuno Doppler Speed Log and L3/ELAC Fathometer systems, and the replacement of interior communications and general alarm battery chargers. Specialized services, including thermographic surveys of switchboards and the provision of shore power and steam, are also required to support the vessel during its overhaul period.
HighAI Summary for 0106 Tank Repairs (Various Tanks) - Rev A: Revision A of the Statement of Work for miscellaneous repairs to various tanks and voids on a vessel. The scope includes renewing sounding tube striker plates, replacing 140 feet of 2-inch stainless steel sounding tubes, clad welding, installing manhole/vent cover studs, and reconditioning sealing surfaces. It also specifies the installation of 1.5-inch IPS threaded pipe bosses in ballast tanks and requires surface preparation and painting using Amercoat 240 epoxy. Quality assurance is overseen by ABS and MSC representatives.
DOC
DOC, High priority: read this firstsow
HighAI Summary for 0402 A GMDSS Renewal Certification - Rev A: Statement of Work for the replacement of a ship's Global Maritime Distress and Safety System (GMDSS) console. The scope includes the removal of existing Furuno equipment, installation of an IMO-approved Dual Inmarsat C console, battery replacement, and required testing (insulation, grounding, and operational). It specifies the need for as-built drawings, ABS Surveyor certification, and factory-authorized technical representative services for installation verification and crew training.
DOC
DOC, High priority: read this firstsow
HighAI Summary for 0403 Doppler Speed Log PM - Rev A: Statement of Work for preventative maintenance on the Furuno DS80 Doppler Speed Log (DSL) System. The document specifies equipment locations, cleaning, inspection, testing, and alignment requirements, and mandates the use of an OEM factory authorized representative for execution and demonstration to the MSC REP.
DOC
DOC, High priority: read this firstsow
HighAI Summary for 0410 Fathometer PM - Rev B: Statement of Work for preventative maintenance on the L3/ELAC LAZ5100 Echo Sounder (Fathometer) system. Requirements include cleaning, inspection, testing, and reporting by a manufacturer's representative, with specific focus on the chart room and ship's hull locations.
DOC
DOC, High priority: read this firstsow
HighAI Summary for 40K Hour Overhaul of No. 3 Ships Service Diesel Generator (SSDG): Statement of Work for the 40,000-hour overhaul of the Number 3 Ships Service Diesel Generator (Bergen Diesel Model KVGB-16) and repairs to No. 3 and No. 4 SSDGs. The document specifies technical requirements, a detailed list of Government Furnished Material (GFM), labor estimates (4 mechanics for 35 days), and specific maintenance tasks including cylinder head and liner replacement, crankshaft deflection readings, and coordination with ABS surveyors and Rolls-Royce technical representatives.
DOC
DOC, High priority: read this firstsow
HighAI Summary for 40K Hour Overhaul of No. 3 Ships Service Diesel Generator (SSDG): This document is a Statement of Work (SOW) for the 40,000-hour overhaul of the Number 3 Ships Service Diesel Generator (Bergen Diesel Model KVGB-16) and related repairs to No. 3 and No. 4 SSDGs. It specifies the requirement for a manufacturer's authorized representative (e.g., Rolls Royce) to provide labor, tools, and technical expertise for disassembly, inspection, and reassembly. The document includes a detailed list of Government Furnished Material (GFM), specific technical tasks such as crankshaft deflection readings and cylinder head replacement, and quality assurance requirements involving ABS and MSC representatives.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 7297714 - Material List: A material list and equipment layout for maritime communication systems, specifically detailing Furuno brand components including power supplies, transceivers, and antennas, along with their installation locations (e.g., 08 Level - Frame 60).
DOC
DOC, High priority: read this firstsow
HighAI Summary for Ballast Tank Recoating - Rev A: This document is a Statement of Work (SOW) for the surface preparation, re-coating of designated vessel ballast tanks, and replacement of zinc anodes. It specifies technical requirements including SSPC-SP 10 near-white metal blasting, the application of Amercoat 240 epoxy systems, and the replacement of approximately 300 zinc anodes. It also details requirements for reach rod assembly repair and quality assurance inspections.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 101-6580166 B - Vessel Shell Plate Framing: Technical drawing and specifications for a vessel's shell plate framing and screw mounting plate. Includes dimensional data, general notes on operating draft, and references to revisions spanning 1987-1999.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 6580294 - Antenna and Equipment Installation: Technical drawing and specifications document (TA0 198 401 6580294) for vessel antenna installations. Includes a list of antennas (e.g., AN/SR4A-49), parts lists, general installation notes regarding NFPA compliance, bonding, and grounding, and revision history dating back to 1980 and 1990.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Fathometer PM - Rev A: Statement of Work for preventative maintenance on the L3/ELAC LAZ5100 Echo Sounder (Fathometer) system. Includes cleaning, inspection, and testing of the system and transducer, requiring a Manufacturer's Representative (MFR REP) to perform the work and provide final reports.
DOC
DOC, High priority: read this firstsow
HighAI Summary for General Services for Ship T AO - Rev A: Statement of Work (Rev A) for general services provided to a vessel during an overhaul period. The document specifies technical requirements for electrical shore power (2400 Amps), shore steam (100 psig), potable water, and distilled water, including metering and pricing instructions for electrical and water consumption.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for GMDSS Arrangement Drawing - USNS Leroy Grumman: Technical arrangement drawing and material list for the installation of a GMDSS radio station on the USNS Leroy Grumman. The document includes a detailed bill of materials (items 1-31) featuring transceivers, printers, and Inmarsat C equipment, along with general installation notes and elementary wiring diagrams.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for GMDSS One Line Diag - SH02: Technical drawing and specifications for a display indicator assembly, including design notes for furniture, column dimensions, and installation requirements.
DOC
DOC, High priority: read this firstsow
HighAI Summary for IC and General Alarm Battery Chargers Replacement: Statement of Work for the removal and replacement of interior communications and general alarm battery chargers. The scope includes disconnecting existing Sens chargers, removing 40 KPL-255P batteries, installing government-furnished ECU chargers, modifying foundations, painting containments with Belzona CR-1, and performing operational testing.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Main Engine Overhaul - 2011 - Rev A: Statement of Work for the scheduled maintenance and 12,000 hour overhaul of two Colt-Pielstick PC 4.2V 570 main propulsion diesel engines. The scope includes the provision of an OEM Authorized Technical Field Service Representative, diesel machinists, and riggers to perform inspections, overhauls, and testing of cylinders, pistons, heads, bearings, and valves. It also specifies the removal and disposal of 15,000 gallons of coolant and requires NDT testing and leak tests.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for N40442-11-R-1022 Solicitation Amendment 0001: Amendment 0001 to solicitation N40442-11-R-1022 for the USNS PATUXENT. The document provides a series of ten detailed answers to contractor requests for clarification regarding technical specifications, including tank repairs, ballast tank recoating, engine overhaul support, and purifier controller upgrades. It includes specific corrections to work item paragraphs and provides technical data such as surface areas and equipment serial numbers.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for N40442-11-R-1022 Solicitation Amendment 0002: Solicitation Amendment 0002 for USNS PATUXENT (N40442-11-R-1022). This document provides a summary of changes to Section M (Evaluation Factors for Award) and incorporates multiple revisions to Work Items (including 011, 103, 106, 201, 301, 302, 402, 403, 410, 504, 507, and 509). It includes detailed answers to contractor requests for clarification (Questions 12-19) regarding technical specifications, dry-docking requirements, and manufacturer contact information.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for N40442-11-R-1022 Solicitation Amendment 0003: Amendment 0003 to solicitation N40442-11-R-1022 for the USNS PATUXENT. This document provides a summary of changes, including a revision to Work Item 504 (40K Hour Overhaul Ships Service Diesel Generator No. 3) and responses to contractor questions (22-27) regarding technical drawings, manuals, and military standards. It specifies that certain documents will be posted to fbo.gov and requires offerors to acknowledge receipt of amendments 0001, 0002, and 0003.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Overhaul and Renew Air Start System Valves - Rev A: Statement of Work for the overhaul and renewal of seventeen (17) air start system valves, including main engine, SSDG, and clutch air valves. The document specifies the renewal of seven 1/2 inch valves and the overhaul of ten larger valves, requiring hydro testing to 450 PSI and inspection by USCG and ABS surveyors.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Overhaul EDG Hydraulic Start System - Rev A: Statement of Work for the overhaul of the Emergency Diesel Generator (EDG) Hydraulic Start System. The document specifies requirements for labor, materials, and equipment to overhaul accumulators, solenoid valves, ball valves, filter elements, and hand pumps. It includes a list of Government Furnished Material (GFM), quality assurance requirements involving USCG and ABS inspectors, and detailed technical instructions for disassembly, cleaning, and operational testing.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for Patuxent Work Item Index 11-R-1022 Amendment 0002: Amendment 0002 to the Patuxent Work Item Index 11-R-1022. The document provides a detailed list of categorized work items (Category A and B) across multiple sections including General Services, Hull Structure, Machinery, Electrical, Communication/Navigation, Auxiliary Systems, Habitability, HVAC, and UNREP Gear. It serves as a technical specification/bid schedule for vessel maintenance and repair.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SG813-AW-MMA-010 Technical Manual - Electric Hydraulic Winch MK 2: Technical Manual (Revision 1, dated 1 January 1994) for the Electric Hydraulic Single Drum Winch MK 2 Mods 1-4, 6, 7, and 9. Published by NAVSEA, the document provides comprehensive instructions for description, operation, and maintenance, including a parts list, troubleshooting, and installation guides. It supersedes the 1983 version and incorporates various Engineering Change Proposals (ECPs).
DOC
DOC, High priority: read this firstamendment
HighAI Summary for Solicitation Amendment #5 - N40442-11-R-1022: Amendment 0005 to RFP N40442-11-R-1022 for USNS PATUXENT. This document updates Section M (Evaluation Factors for Award) and establishes a timeline for offeror discussions on May 16, 2011, with revised proposals due by May 18, 2011.
DOC
DOC, High priority: read this firstamendment
HighAI Summary for Solicitation N40442-11-R-1022 Amendment 0004: Amendment 0004 for solicitation N40442-11-R-1022 (USNS PATUXENT) provides clarifications to contractor questions regarding specification items 021, 302, 508, 510, and 517. Key updates include guidance on correct enclosure versions for tank cleaning and confirmation of Government Furnished Material (GFM) for batteries, valves, and pump parts. Final proposal revisions are due by 2:00 PM on May 5, 2011.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for T9426-GL-MMC-010 Maintenance Manual for Gyrocompass, MK-37 Mod E: Technical maintenance manual for the MK-37 Mod E Gyrocompass, produced by Sperry Marine Inc. under contract N00024-93-C-2216 for the Naval Sea Systems Command. The document includes installation instructions, operational procedures, scheduled maintenance, troubleshooting, and detailed repair guidelines for equipment installed on T-AKR 296 and 298 ships. Validated as of 15 May 1995.
DOC
DOC, High priority: read this firstsow
HighAI Summary for Thermo Survey of SWBDs & MCCs - Rev A: Statement of Work (Revision A) for a qualified contractor to perform initial and final thermographic surveys of a ship's Main and Emergency Switchboards and Motor Control Centers. The scope includes inspections of 18 specific equipment locations, adherence to MSFSC and NAVSEA technical manuals, and the delivery of detailed reports featuring color photos and infra-red imaging of identified problem areas.
DOC
DOC, High priority: read this firstrfp
HighAI Summary for USNS PATUXENT (T-AO 201) Mid-Term Availability Solicitation N40442-11-R-1022: Solicitation N40442-11-R-1022 for the voyage repairs, overhaul, and alterations of the USNS PATUXENT (T-AO 201). The document includes Section B (Supplies or Services and Prices) detailing CLINs for Category A and B items, labor rates, and material G&A/profit rates, as well as Section C (Descriptions and Specifications) outlining general requirements for shipyard production, management, and quality assurance.
DOC
DOC, High priority: read this firstspecifications
HighAI Summary for Work Item Index - Patuxent 2011 MTA Rev C: A detailed work item index for the Patuxent 2011 MTA (Revision C), outlining specific maintenance and repair requirements across multiple sections including General Services, Hull Structure, Machinery, Electrical, Communication/Navigation, Auxiliary Systems, Habitability, HVAC, and UNREP Gear. The document categorizes tasks into 'A' and 'B' work items and references specific VR (Variation Request) numbers for technical guidance.
PDF
PDF, Low priorityother
LowAI Summary for Electronics Model Scheme - Hassan Vsfathi (Roll No: 55/ECE/1994): This document is an academic lab report or student assignment for a B.Tech Electronics course (S5 Automation & Robotics) for the year 2021-2022. It details experiments on measuring DC resistance using an ohmmeter and the creation of an oscillating circuit using a transistor.
PDF
PDF, Low priorityother
LowAI Summary for GMDSS One Line Diag - SH01: The document appears to be a fragmented set of financial tables and risk-weighted exposure data, including asset/liability categories and growth rate calculations. Despite the filename suggesting a technical diagram (GMDSS One Line Diag), the content consists of financial risk management data.
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
5 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline added: Apr 4, 2011. The notice description changed.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Apr 4, 2011 to May 12, 2011. The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → Military Sealift Flt Supp Command Norf
The Military Fleet Support Command has a requirement for the upcoming Mid-Term Availability of the USNS PATUXENT (T-AO 201). The period of performance for this requirement is to commence 01 August 2011 for a period of Forty-two (42) days. This requirement will be solicited as a small business set-aside. Major work items include: BALLAST TANK RECOATING; 40,000 HOUR OVERHAUL OF SHIPS SERVICE DIESEL GENERATOR; MISCELLANEOUS PIPE REPAIRS; FIRE DETECTION AND ALARM SYSTM REPLACEMENT; CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES; VARIOUS TANK REPAIRS; PREP & PAINT VARIOUS DECK AREAS; MAIN ENGINE 12,000 HOUR OVERHAUL SUPPORT. The estimated issued date for this solicitation is 22 Feb 2011 with an estimated closing date of 25 Mar 2011. Upon issuance, the solicitation will be posted and can be found on FedBizOpps.