Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Midtown Fresno Trail: Herndon Canal Metro Trail from Shields to McKinley (Midtown Trial Segment 3)

Closed
12601826State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation, operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity for parking lot and road repairs in Illinois. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across the Dorm Parking Lot, West Side of Dorms, Kitchen/BCT, and Dumpster/Maintenance areas, as well as drainage structure repairs and pothole patching. The estimated contract value ranges from $100,000 to $250,000, with a required performance period of 90 consecutive business days following the Notice to Proceed. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms under NAICS code 237310. Bids will be awarded based on overall best value, and interested parties must complete a mandatory physical site visit and sign the attendance roster to be eligible. Required submission documents include a signed bid sheet, a detailed cost breakout on company letterhead, proof of insurance, and a completed MTC Supplier Packet. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. Compliance with the Construction Wage Rate Requirements and the provided Wage Determination is mandatory. The contract incorporates various Federal Acquisition Regulation clauses, including those regarding the utilization of small businesses, trafficking in persons, and minimum wage standards. Payment will be processed via pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful punch list inspection and the submission of operation maintenance manuals, manufacturer warranties, and certificates of release of liens.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
2026-0015
Solicitation # 49221
The City of Centerville, Ohio, is soliciting unit price bids for the Centerville Station Paving and Multi-Use Path project, with an updated engineer's estimate of $845,023.00. The scope of work involves resurfacing Centerville Station from Brainard Woods to Bill Yeck Park and replacing existing concrete sidewalks with an asphalt multi-use path. The base bid includes the resurfacing and the installation of the path from the existing asphalt to the west entrance of Bill Yeck Park, including nine curb ramp replacements. Add Alternate 1 extends the multi-use path from the west entrance of Bill Yeck Park to Park East Court and includes two additional curb ramp replacements. Additional requirements include catch basin repairs, thermoplastic pavement markings, and strict adherence to ADA compliance and storm water pollution prevention practices. The project must be completed by October 1, 2027, with work performed between 7:00 am and 7:00 pm, though lane closures are restricted to 8:30 am through 3:30 pm. Specific blackout dates are established for May 29-31 and September 5-7. Bids are submitted via Bid Express and will be awarded to the lowest and best bidder based on compliance, qualifications, and prior experience. The successful contractor must comply with Ohio Prevailing Wage laws, OSHA safety standards, and provide necessary insurance certificates and performance bonds. All field inspections and material approvals are managed by the City's Engineer, and any claims must be submitted within 21 days.
City of Centerville

POSTED

about 8 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
Federal
Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest Service
Solicitation # 127EAX26Q0102
Solicitation 127EAX26Q0102 is a Request for Quotation for RTLSA Road Maintenance on the Carson National Forest, specifically within the Tres Piedras Ranger District. This project is a Total Small Business Set-Aside under NAICS 237310 and is restricted exclusively to responsible contractors on the New Mexico Forest Engineering and Roads Maintenance Blanket Purchase Agreement in Zone 1. The scope of work involves road reconditioning, aggregate surfacing, culvert installation and replacement, drain dip construction, and curve widening to support the Venado, Lamy, and Barela timber projects. The estimated magnitude of the requirement is between 1,000,000 and 5,000,000 dollars. The contract is a Firm-Fixed Price BPA Call with a performance period requiring work to commence within 10 calendar days of the Notice to Proceed and be completed within 150 calendar days. Award will be based on best value, granted to the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable or neutral. Technical evaluations focus on quality, equipment, personnel, and timeliness on a pass/fail basis. Key requirements include a 20% bid bond, performance and payment bonds, and strict adherence to the Carson National Forest Fire Plan and Davis-Bacon Act wage determinations. Contractors must also comply with sustainable product requirements and federal anti-discrimination laws.
Forest Service

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237310
New
Federal
Y1DA--Sidewalk Replacement Throughout Lyons Campus
Solicitation # 36C24226R0131
The Department of Veterans Affairs, Network Contracting Office 02, is soliciting offers for a firm-fixed-price construction contract to replace approximately 12,180 square feet of cracked or damaged sidewalks at the Lyons Campus in New Jersey. The project scope includes the removal of existing concrete and the installation of 5-inch thick 4000 Psi concrete reinforced with number 6 wire mat and 3/4 inch gravel fill. Work is distributed across several locations, including Knollcroft Road, the 1st Circle, and buildings 53, 54, 57, and 143. The contractor is responsible for providing all labor, materials, and equipment, including dumpsters and safety fencing, and must install ADA warning pads to replace those removed. The estimated contract value is between $250,000 and $500,000, with a required completion time of 45 calendar days from the Notice to Proceed. This procurement is strictly set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Evaluation will be based on a comparative process considering technical experience in a healthcare setting, the qualifications of the assigned Competent Project Supervisor, product description, and past performance. Mandatory submission requirements include a cost proposal, a Buy American Certificate, and a VA Notice of Limitations on Subcontracting Certificate of Compliance. All work must adhere to Davis-Bacon wage determinations for Somerset County, New Jersey, and OSHA safety standards, requiring all workers and supervisors to hold current 30-hour OSHA safety training. Additionally, the contractor must utilize the Autodesk Build Construction management platform for all official project correspondence, including RFIs, submittals, and safety inspections.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 8 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The project involves the construction of a 1.35-mile pedestrian and cycling trail along the Herndon Canal within the City of Fresno, extending from Shields Avenue and First Street to McKinley Avenue and Millbrook Avenue. This segment is part of the broader 7.1-mile Metropolitan Trails System, designed to connect four existing trail sections and form a central trail loop that enhances community connectivity and active transportation options. Work includes the installation of a prefabricated pedestrian bridge, ADA-compliant ramps, trail lighting, benches, drinking fountains, bicycle racks, dog waste stations, signage, striping, landscaping, and irrigation systems. Minor improvements to roadways and crossings are also required to ensure seamless integration with surrounding infrastructure. The project demands close coordination with multiple agencies including the City of Fresno, Fresno Irrigation District, County of Fresno, San Joaquin Valley Air Pollution Control District, and PG&E to address regulatory, environmental, and utility concerns. The solicitation for this project is identified by number 12601826, titled Midtown Fresno Trail: Herndon Canal Metro Trail from Shields to McKinley (Midtown Trial Segment 3), and was posted on June 19, 2026, with a bid submission deadline of July 21, 2026, at 10:00 PM. A bid bond of 10 percent is required for all submissions. The contracting authority is the Capital Projects Department of the City of Fresno, under the state of California, with procurement handled through the Fresno purchasing office. Point of contact for inquiries is Adrian Ontiveros, reachable via email at purchasing@fresno.gov or phone at 559-621-1165. The project falls under a SLED-type organization and is intended to support long-term municipal mobility and public health goals through improved non-motorized transportation infrastructure.

General Info

Construct 1.35-mile pedestrian/cycling trail along Herndon Canal with bridge, ADA ramps, lighting, benches, and utilities in Fresno.

Place of Performance

747 R Street 2nd Floor Fresno, California 93721, CA, USA

Set-Aside

NONE

Documents

6

12601826 Midtown Fresno Trail Segment 3 Notice Inviting Bids

PDF, High priority: read this firstifb
High

12601826 Midtown Fresno Trail Segment 3 Specifications

PDF, High priority: read this firstspecifications
High

City of Fresno Statement of Qualifications for Construction Bids

PDF, High priority: read this first4 pages · statement-of-qualifications
High

Midtown Fresno Trail Segment 3 Bid Questions Form

PDF, High priority: read this firstq-and-a
High

PW00762 Fresno Mid Town Trail Segment 3 At-Risk Plans

PDF, High priority: read this firstplans
High

12601826 Pre-Bid Attendance List for Midtown Fresno Trail Project

PDF, Low prioritypre-bid-attendance-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Contract opportunity posted

Deadline changed

Response deadline changed from Jul 21, 2026 to Aug 4, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects Department of City of Fresno
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts

Full Description

Show more
Scope: The scope of work includes but is not limited to; installation of a 1.35-mile pedestrian and cycling trail along the Herndon Canal as part of a 7.1-mile network of trails known as the Metropolitan Trails System or Metro Trails. This trail will be constructed along the Herndon Canal from Shields Avenue and First Street to McKinley Avenue and Millbrook Avenue and will ultimately connect four additional trail segments. This will create a major trail loop in the central part of our community. This project will include minor roadway and crossing improvements, installation of a City-furnished prefabricated pedestrian bridge, ADA ramp upgrades, installation of amenities such as benches, trail lighting, drinking fountains, bicycle racks, dog waste station, signage, striping, landscaping, and irrigation. Coordination with the City of Fresno, the Fresno Irrigation District, County of Fresno, the San Joaquin Valley Air Pollution Control District, and PG&E will be required.
Bid Bond: 10.00%

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS