Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Mirabel Transit Priority Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mirabel Transit Priority Project, managed by the City of Los Angeles Department of City Planning, involves the construction of a 42-story mixed-use tower located on a 1.32-acre lot at 5401–5425 Wilshire Boulevard. The development will feature 348 dwelling units, including 29 units reserved for very low-income households, and 12,821 square feet of ground-floor commercial space. The project encompasses a total floor area of 476,777 square feet with a floor area ratio of 8.31:1. Parking will be provided across three above-ground and three subterranean levels. The scope of work includes the demolition of 38,545 square feet of existing commercial buildings, though the east and south facades of the historic building at 5401 Wilshire Boulevard, a contributor to the Miracle Mile Historic District, will be preserved and integrated into the new structure. The project is subject to CEQA and NEPA environmental guidelines and requires coordination with Metro regarding the D Line Extension and bus facilities. Key requirements include ADA compliance for all sidewalk and bus stop modifications, a pre-construction meeting with Metro two months prior to start, and adherence to parking restrictions under AB 2712. The project is estimated for completion in 2027.

General Info

42-story mixed-use tower in Los Angeles with 348 units, preserved historic façades, and commercial space.

Agency

California → City of Los Angeles

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Wilshire Blvd between Cloverdale Ave and Cochran Ave, Los Angeles, CA, 90036

Set-Aside

NONE

Documents

(4)

SCH 2023080791 Mirabel Transit Priority Project Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

Appendices - FEIR Mirabel Transit

PDF

Final Environmental Impact Report for Mirabel Transit Priority Project ENV-2019-3937-EIR

PDFfinal-eir

Vesting Tentative Tract Map and Environmental Impact Report for Wilshire Boulevard Project

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts

Interested Companies (1)

Show more
CAJA Environmental Services
Chatsworth, CA

Full Description

Show more
The Project involves the construction of a 42-story mixed-use tower, comprised of 348 dwelling units, including 29 units set aside for Very Low-Income households, and 12,821 square feet of ground floor commercial uses. The Project would demolish 38,545 square-foot of existing commercial buildings on-site, including the historic building located at 5401 Wilshire Boulevard, which is a designated contributor to the Miracle Mile Historic District. However, the east and south façades of the existing historic commercial building would be preserved in place, rehabilitated, and incorporated into the Project. Parking would be provided in three above-ground and three subterranean levels. The Project would include a total floor area of 476,777 square feet on an 57,374 square foot lot (1.32 acres) for a FAR of 8.31:1.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 380 calendar days from the date of award. The contract will be awarded based on the lowest price. Key requirements include adherence to the Buy American Act and the Davis-Bacon Act, as well as the provision of paid sick leave for employees. Depending on the proposal value, bid, payment, and performance bonds may be required. The contractor is responsible for implementing a Quality Control Plan and providing deliverables such as a facility operating plan, testing and performance data, and manufacturer-provided training information. Invoices must be submitted via Wide Area WorkFlow, and the final invoice requires a Contractor's Final Release and specific sea transportation certifications. Proposals are due by September 24, 2026, at 3:00 PM local time.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS