Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Miramar Rail Replacement Construction

Closed
35527State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The North County Transit District (NCTD) is seeking a qualified contractor to replace the existing rail on the Miramar Hill section of the San Diego Subdivision, in compliance with Federal Railroad Administration regulations outlined in 49 CFR 213. The project involves replacing rail at six specific locations between mileposts 251.0 and 252.5, where the current rail infrastructure has reached the end of its service life and requires renewal to ensure safety and operational efficiency. The contract aims to address these critical maintenance needs by engaging an experienced firm capable of executing the work within a budget estimated between five and ten million dollars. The solicitation, titled "Miramar Rail Replacement Construction," was posted on June 13, 2025, with a response deadline of July 14, 2025. The project is managed by the North County Transit District in California, and interested contractors can contact Suzie Tovar via email or phone for further details. The contract emphasizes adherence to federal safety standards and aims to enhance the reliability of rail operations in the Miramar area, ensuring ongoing compliance and safety for rail users.

General Info

Documents

6
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstcontract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → North County Transit District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
North County Transit District (NCTD) seeks to engage with an experienced and qualified Contractor to replace the existing rail on the Miramar Hill located on the San Diego Subdivision to meet Federal Railroad Administration (FRA) requirements of 49 CFR 213. The work will be to replace the rail at six (6) locations between MP 251.0 and 252.5. The rail at the six (6) locations specified below is nearing the end of its useful life and is in need of replacement.

More opportunities from California → North County Transit District

Same awarding agency

NAICS: 238990
SLED
On Call Bus Stop Bench Replacement
Solicitation # 37923
The North County Transit District (NCTD) is soliciting bids under IFB No. 37923 for an on-call contract to furnish, install, and replace bus stop furniture, specifically hot-dipped galvanized metal benches and trash receptacles, throughout North San Diego County. The agreement features a three-year base term with a two-year option term. The scope of work includes the removal and disposal of existing furniture, repair of ground surfaces, and the installation of new units securely anchored to the ground. NCTD anticipates an average of 40 replacements annually, with the potential for one-time replacements of up to 74 units. The contract is awarded to the lowest responsible bidder who complies with all solicitation requirements. Bidders must submit their proposals electronically via PlanetBids by the November 10, 2026, deadline. Required documentation includes bid bonds at the time of submission, with performance and payment bonds totaling 100 percent of the bid amount required upon execution. The contractor must adhere to California prevailing wage laws, FTA Circular 4220.1G, and various federal and state non-discrimination and civil rights regulations. Payment is processed monthly within 30 days of invoice confirmation. Performance is monitored through field inspections and a final punch walk conducted by the NCTD Project Manager to ensure all installations meet quality and safety standards.
All Other Specialty Trade Contractors

POSTED

25 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS