Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 23, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Missile Tube and Integrated Tube and Hull Shape Long Lead Time Material and spare material for COLUMBIA Class Submarines

Closed
N00024-22-R-2101Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
IFB 26-07 Ranger Shipyard Repairs
Solicitation # BD-27-1070-MMA01-PURCH-134561
Massachusetts Maritime Academy is soliciting bids under solicitation number BD-27-1070-MMA01-PURCH-134561 for the dry docking, related inspections, and repairs of the Training Vessel Ranger, a U.S.C.G. inspected school ship. The contractor is responsible for providing all necessary equipment, labor, parts, and materials. The project timeline requires the vessel to be available on December 11, 2026, with the haul-out occurring no later than December 18, 2026, and final completion by February 19, 2027. Core requirements include hauling, blocking, shoring, and relaunching the vessel, with the contractor maintaining the ship out of the water until all dry-dock items and the U.S. Coast Guard hull inspection are complete. Specific tasks include hull zinc replacement, painting of ground tackle and cleats, and rudder shaft packing inspection, with optional services available for cooling system coolant replacement, gunnel repairs, and main deck coating using International Interthane 990 deck red. The contract will be awarded to the responsive and responsible bidder providing the greatest overall value based on cost and evaluation criteria. To be considered responsive, bidders must submit a complete package including bidder information, tax compliance, non-collusion certification, debarment and suspension certification, a price proposal, and three institutional references. The vendor must comply with non-discrimination laws, conduct criminal background and sexual offender registry checks on all personnel, and indemnify the Academy against patent infringement and other damages. Records must be maintained for seven years following final payment. The Academy reserves the right to amend or terminate the contract with or without cause, and the vessel shall not be launched until authorized by an Academy representative.
MMA01 - Massachusetts Maritime Academy

POSTED

1 day ago

DEADLINE

in 14 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Groton, CT, 06340, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA

Full Description

Show more
The Naval Sea Systems Command (NAVSEA) intends to award a sole source contract to Electric Boat Corporation (EBC), 75 Eastern Point Road, Groton, CT 06340. The contract will be for procurement of Continuous Production Round II Missile Tube and Integrated Tube and Hull (ITH) Shape Long Lead Time Material (LLTM) and spare material in support of construction of COLUMBIA Fleet Ballistic Missile Submarines. The contemplated contract will be awarded pursuant to 10 U.S.C. 2304(c)(1) as implemented by FAR 6.302-1 (a)(2)(iii). Parties interested in subcontracting opportunities should contact EBC directly. This notice is for informational purposes only. Solicitation documents are not available. This pre-solicitation synopsis shall not be construed as a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept, proposals as a result of this synopsis. This is not a request for proposals, a promise to issue a request for proposals, or a promise by the Government to pay for information received in response to this synopsis or any subsequent synopsis. The information contained herein is subject to modification and in no way binds the Government to award a contract. The Government will not pay for any effort expended or any material provided in response to this announcement, nor will the Government return any data provided. Interested parties may identify their interest and capability to respond to the requirement in response to this notice through a capability statement. This synopsis notice is not a request for competitive proposals. However, all expressions of interest received within fifteen (15) days after date of publication of this synopsis will be considered by the Government. Any submissions will not be reimbursed by the Government - the entire cost of any submission will be at the sole expense of the source submitting the information. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. No telephone inquiries will be accepted. The Government does not commit to providing a response to any comment or questions. No basis for a claim against the Government shall arise as a result of this announcement. Responses should be received no later than the response date listed in this announcement.

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 334511
New
Federal
AN/BYG-1 Applications Re-Architecture
Solicitation # N0002426R6222
Solicitation N0002426R6222, issued by the Naval Sea Systems Command (Navsea HQ), seeks a contractor for the AN/BYG-1 Applications Re-Architecture. This effort involves the re-architecting of applications associated with the AN/BYG-1 system. The solicitation was posted on October 7, 2026, with a response deadline of November 5, 2026. The primary point of contact for the effort is Michael Ravnitzky, with Matthew C. Hedrick serving as the Contracting Officer. Due to the sensitive nature of the work, strict security and data handling requirements are in place. Offerors must possess a SECRET security clearance and provide a verified DD Form 2345 Military Critical Technical Data Agreement and a signed Terms of Use Agreement to access Government Furnished Information, source code, and technical documents. All data must be handled in accordance with NISPOM standards, and the transmission of information to foreign nationals or outside the United States is prohibited without a valid export license. Furthermore, the use of public cloud repositories or external AI tools for processing technical data is strictly forbidden. Contractors are required to destroy all provided data within 180 days of the RFP closing and maintain destruction records for five years.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 334511
New
Federal
Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
Solicitation # N00025-26-R-5246
The U.S. Navy, through the Portfolio Acquisition Executive Mission Systems and Program Manager Warfighting / Applications (PMW/A 520), is soliciting proposals for the development, production, integration, testing, fielding, and lifecycle sustainment of the Electronic Chart Display and Information System (ECDIS) hardware and software. This full and open competition supports both surface and subsurface platforms, specifically focusing on the manufacture and assembly of AN/SYN-1 and Scalable IBS (S-IBS) hardware, alongside the maintenance and modification of software using Government Furnished Information. The contract is structured with one base year and four one-year option periods beginning in FY27, with award anticipated in Q4 FY27. The procurement utilizes a best-value tradeoff process, prioritizing technical approach and management approach over total evaluated cost and price, while past performance is rated on an acceptable or unacceptable basis. Hardware deliverables are priced via a stepladder structure, while software and hardware engineering support are provided as cost-plus-fixed-fee level-of-effort tasks. Key requirements include a Secret facility and personnel clearance, compliance with ANSI/ASQ/ISO9001:2015 quality standards, and strict adherence to cybersecurity and CUI protection frameworks. Deliveries are generally FOB Destination, with specific timelines ranging from 60 days to 18 months after award or option exercise.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier and dry-dock. The scope of work is extensive, with estimated man-days of approximately 284,631 for maintenance and 38,416 for modernization, covering areas such as hull structure, propulsion and electric plants, auxiliary systems, and structural welding. The government anticipates making a single Firm Fixed-Price award in or before March 2027, with performance beginning in November 2027 and an expected completion date of October 30, 2029. The procurement is not set aside for small businesses due to the complexity and magnitude of the requirements. Proposals will be evaluated based on Best Value using trade-off procedures, focusing on technical eligibility, physical resource capacity, past performance, manpower, small business participation, and the proposed schedule and execution approach. Key deliverables include an integrated production schedule and an initial duration analysis due 60 days post-award. The contract includes specific provisions for growth work, including an estimated 211,989 direct labor hours and over 9.5 million dollars in materials, as well as a Small Dollar Value Growth incentive program. Offerors must be registered in the System for Award Management and submit proposals via the PIEE Solicitation Module by November 9, 2026.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research under solicitation N0002427R4452 to identify capable sources for the Shipboard Air Conditioning Plant System Sustainment Plan (SSP). This initiative aims to standardize and scale the sustainment of centrifugal, reciprocating, and rotary air conditioning plants for U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract or multiple-source arrangements, to improve materiel condition and operational availability across diverse ship classes and geographic locations. The contemplated scope of work encompasses six primary capability areas: executing Major AC Plant Pit Stops and overseeing Minor Pit Stops, both of which must be completed within a mandatory six-week window; providing embedded AC&R technical expertise at Shore Intermediate Maintenance Activities (SIMAs) for Sailor training and oversight; supplying OEM AC plant materiel and repair parts; managing a global warehouse and rotable pool for Overhaul Parts Packages (OPPs); providing configuration-specific engineering, technical data, and integrated product support; and delivering global unplanned and emergent field services. Interested respondents must submit a response by October 28, 2026, including a completed Capability Certification Matrix and supporting evidence of their ability to perform these requirements organically or through teaming arrangements.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS