Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kentucky was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MITC 109 - Student Wellness Center Renovation | Design-Build

Closed
university-of-louisville-1207919State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 16 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 16 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 16 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The University of Louisville is seeking a qualified Design-Build Contractor for the renovation of Suite 109 in the Miller Information Technology Center on the Belknap Campus. The project involves an approximately 20,000-square-foot renovation to create a centralized Student Wellness Center, co-locating Campus Health, the Counseling Center, Campus Recreation, and other health services to provide holistic, whole-person care. The scope includes the creation of exam rooms, procedure rooms, laboratory space, and specialized lactation and sensory rooms, alongside comprehensive updates to HVAC, LED lighting, security access, and fire protection systems. The total project budget is 10,000,000 dollars, with preliminary design and construction estimates around 6,100,000 dollars. The project is governed by a Best Value Award process, with a heavy emphasis on project understanding, team qualifications, and experience with medical or psychological facilities. Substantial completion is targeted for January 2028, with final completion by February 2028. The selected contractor must adhere to strict quality and safety standards, including the 2018 Kentucky State Building Code and various NFPA standards. Key requirements include providing 100 percent performance and payment bonds, maintaining comprehensive liability insurance, and ensuring compliance with Kentucky living wage and prevailing wage laws. Final acceptance requires a certificate of occupancy from the Kentucky Department of Building and Housing and a comprehensive closeout package including as-built drawings and warranties.

General Info

University of Louisville seeks design-build contractor to consolidate student wellness services into Suite 109 at MITC by September 4, 2026.

Documents

15

Design-Build Contractor Agreement - University of Louisville RFP #1207919

PDF, High priority: read this firstcontract-document
High

Exhibit H_UL Custodial Provisions - Accessories O.F.C.I.

PDF, High priority: read this firstsow
High

Exhibit I_UofL Interior Signage Manual_20200304

PDF, High priority: read this firstspecifications
High

Exhibit M Proposer Qualifications Form

PDF, High priority: read this firstproposer-qualifications
High

RFP-1207919 MITC 109 Student Wellness Center Renovation Design-Build

PDF, High priority: read this firstrfp
High

University of Louisville Cleaning Specifications

PDF, High priority: read this firstspecifications
High

University of Louisville Hardware and Keying Guideline

PDF, High priority: read this firstspecifications
High

University of Louisville Physical Plant Closeout and Elevator Specifications

PDF, High priority: read this firstspecifications
High

University of Louisville Student Wellness Center Owner's Project Requirements

PDF, High priority: read this firstowners-project-requirements
High

UofL Physical Plant Project Closeout Requirements 09/2023

PDF, High priority: read this firstcloseout-requirements
High

UofL Tunnel Top Load Rating Structural Design

PDF, High priority: read this firstspecifications
High

Exhibit C Existing Layout

PDF, Low priorityother
Low

Exhibit E Belknap Campus 2016 Contour Map

PDF, Low priorityexhibit
Low

event-1207919-attachments.zip

ZIP

Exhibit B_Proposed Layout.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → University of Louisville
ContactsNo contacts available
OfficeKY
Office AddressKY
ContactsNo contact information available

Full Description

Show more
MANDATORY PRE-BID: 8/19/2026 at 2:00 pm EST; MITC IT201 The Miller Information Technology Center (MITC) 2315 S 1st St UNIT IT201, Louisville, KY 40208. Introduction: The University of Louisville is seeking a qualified Design-Build Contractor (DBC) for the renovation of the James G. & Jesse Miller Information Technology Center (MITC) – Suite 109 with a goal of creating a Student Wellness Center on the University of Louisville’s Belknap Campus. Currently, Campus Health and the Counseling Center are housed in separate facilities on opposite ends of campus, which limits collaboration between providers, creates barriers to access for students, and prevents delivering seamless, whole-person care for students. The vision for the renovated MITC Suite 109 is to co-locate Campus Health, the Counseling Center, a Campus Recreation Wellness Hub, the PEACC Office, Health Services and Alcohol and Drug Education into one single location to create a Student Wellness Center that is an accessible environment that will enhance the health and wellness of Cardinals who live, work, and study on campus each day. This renovation will enhance the student experience by providing collaborative health and wellness resources and by fostering a more holistic model of care. The selected DBC will become a responsible member of UofL’s professional team for programming, design, bidding, and construction, helping to assure the project is completed within budget, on schedule, and compliant with project program, university standards, accreditation and licensure requirements for Counseling and Campus Health, mutually agreed upon sustainability goals, and applicable building codes. DBC’s submitting qualifications shall demonstrate compatible experiences in programming, planning, designing, and overseeing projects of similar building type and project scale, especially with psychological counseling and medical facilities. DBC shall demonstrate their ability to integrate with the owner. DBC shall also show their capability to collaborate and guide a broad range of project stakeholders that will engage the team throughout all phases of the project’s development.

More opportunities from Kentucky → University of Louisville

Same awarding agency

NAICS: 236220
SLED
Fresh Tissue Lab Renovation | CM/GC
Solicitation # 1208636
The University of Louisville is seeking a Construction Manager and General Contractor (CM/GC) to renovate approximately 7,000 gross square feet of the existing fresh tissue lab and morgue located in the lower level of the School of Medicine on the downtown Health Science Campus. The project aims to create a state-of-the-art surgical education facility featuring a high-fidelity laboratory with operable partition walls, expanded cadaver storage, a dedicated temporal bone laboratory, and updated faculty and staff offices. The total project budget is estimated at 4,600,000 dollars, with anticipated construction costs totaling 3,200,000 dollars. Key milestones include the completion of programming in July 2026, design completion by March 31, 2027, and final renovation completion by December 31, 2027. The selected CM/GC will be responsible for comprehensive pre-construction and construction services, including detailed cost estimating at multiple design stages to establish a Guaranteed Maximum Price (GMP) and performing value engineering if budget constraints are exceeded. Because the work occurs within a fully occupied building with limited lay-down space, the contractor must implement strict site logistics, noise and dust mitigation, and safety protocols, including a mandatory Hot Work Permit System. Compliance requirements include adhering to the Davis Bacon Act for prevailing wages, ADA standards, and specific University guidelines for the management of building demolition debris and hazardous waste. Proposals are evaluated based on firm and personnel experience, work plan methodology, and the ability to execute the project within the identified schedule and budget.
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS