Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Modular Steel Bridge Superstructure Supply and Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the supply and installation of modular steel bridge superstructures for the Government of Ontario's Ministry of Natural Resources. The scope of work specifically focuses on the delivery and installation of engineered steel bridge components for the Morrow Lake and Doorley Creek bridges, ensuring all work adheres to the provided design drawings and technical specifications. The project is categorized under NAICS code 237310 for highway, street, and bridge construction. Interested parties must submit their responses by the deadline of October 19, 2026, to provide fully installed superstructures for the prime contractors managing these public service bridge projects.

General Info

Supply and installation of modular steel bridge superstructures for Ontario by October 19, 2026.

Agency

Government of Ontario → Natural ResourcesView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

ON, CAN

Set-Aside

NONE

Documents

This scope was carved out of Tender_22023.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Morrow Lake and Doorely Creek Bridge Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Ontario → Natural Resources
ContactsNo contacts available
OfficeN/A
Organization / Agency
Government of Ontario → Natural Resources
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs modular steel bridge superstructures for prime contractors on Ministry of Natural Resources (Ontario Public Service) bridge projects. Installs engineered steel bridge components for the Morrow Lake and Doorley Creek bridges according to design drawings and specifications. Delivers fully installed steel bridge superstructures.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Asphaltic Concrete Pavement Preservation- 2026
Solicitation # PE-63850-NONST-2026-000000033
The City of Newnan is soliciting sealed bids for the Asphaltic Concrete Pavement Preservation- 2026 project, which involves comprehensive roadwork including variable depth milling, deep patching, and overlay of approximately 2.703 centerline miles across nine streets, as well as full depth reclamation of approximately 19,680 square yards on three streets. The scope also includes the application of thermoplastic traffic stripes, pavement markings, and the adjustment of utility valves and manholes. All work must be performed in accordance with Georgia DOT standards and the Manual on Uniform Traffic Control Devices. The project must be completed within 180 calendar days from the issuance of the Notice to Proceed, and the contractor is required to provide a minimum one-year warranty from the date of final acceptance. To be eligible, contractors must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. The contract will be awarded to the responsive bidder offering the lowest base bid price. Bids are due by 2:00 P.M. on Tuesday, October 13, 2026, and must include a bid bond of at least 5% of the total bid. Successful bidders must provide performance and payment bonds for 100% of the contract price and evidence of liability insurance. Additionally, contractors must comply with the Georgia Security and Immigration Compliance Act by registering with the E-Verify program. The contractor is responsible for all quality control and quality assurance, including the retention of a Georgia DOT approved testing firm for mix designs and material testing.
City of Newnan

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Government of Ontario → Natural Resources

Same awarding agency

NAICS: 237310
New
International
Morrow Lake and Doorely Creek Bridge Replacement
Solicitation # Tender_22023
The Government of Ontario, through the Ministry of Natural Resources, is seeking a vendor for the removal and replacement of the Doorley Creek and Morrow Lake bridges located on Doorley Creek Road in Greater Madawaska, Ontario. The project aims to resolve load-posting issues that currently hinder forestry and recreational access to the crown road. The scope of work includes the removal and disposal of existing culverts, earth excavation, rock removal, and the installation of modular steel bridge superstructures, timber deck components, and steel beam guard rails, all performed according to engineered specifications and designs. The contract is being awarded based on a Best Price strategy, with bids submitted via the Ontario Tenders Portal. Key deadlines include a response deadline of October 19, 2026, and an anticipated contract start date of November 15, 2026. All in-water work must be completed by September 24, 2027, with final project completion required by October 1, 2027. Mandatory requirements for eligibility include attendance at a site meeting, the provision of an agreement to bond from a surety, and verification of good standing regarding Ontario tax obligations. The successful bidder must also provide performance securities within 15 days of selection and maintain insurance coverage as specified in the agreement.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS