Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Mold Remediation Building 258 Floors 2 and 3 at Makalapa Compound, Joint Base Pearl Harbor Hickam, HI

Awarded
N6274226P3625Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Mold remediation services are being procured for Building 258, Floors 2 and 3, at the Makalapa Compound on Joint Base Pearl Harbor Hickam, Hawaii, under a sole-source justification issued by Naval Facilities Engineering Systems Command Pacific. The contract, identified by solicitation number N6274226P3625, is issued under simplified acquisition procedures per FAR 13.5 and statutory authority under 41 U.S.C. § 1901, due to exigent circumstances tied to an OSHA compliance deadline. The urgency stems from the need to immediately eliminate hazardous mold contamination to protect personnel health, with the work required to be completed within a 60-day performance period after order receipt. The selection of the contractor is based uniquely on their proven, recent experience remediating mold in Building 346 at the same base, which provided them with irreplaceable facility-specific knowledge, including structural details, ventilation systems, and pre-validated containment protocols. No other contractor can meet the timeline because of the necessity of immediate base access, pre-existing security clearances, and familiarity with the building’s unique environmental challenges. The contract is anticipated to be firm fixed price, though the total value is not disclosed. No competition is permitted due to the impracticality of timing, duplication of efforts, and unacceptable technical risk associated with transitioning to a new contractor. Special requirements include mandatory pre-established access credentials to JBPHH, use of already validated engineering controls, and strict adherence to OSHA safety standards. No options are included, and future repair work related to permanent moisture control will be competitively procured. Packaging, marking, and preservation standards are not specified, and no detailed invoicing, payment, or accounting data is provided. The contracting office is located at JBPHH, Hawaii, with primary point of contact Nhung Bui and secondary contact Vanessa Cariaso. The Justification and Approval document is the sole attached file, and no offeror representations, certifications, or socioeconomic set-asides are applicable or included.

General Info

Sole-source mold remediation for Building 258 Floors 2–3 at Joint Base Pearl Harbor Hickam, 60-day deadline, due to urgent health risks and unique contractor expertise.

Agency

Department Of Defense → Navfacsyscom PacificView Agency

NAICS

562910 - Remediation Services View NAICS

Place of Performance

JBPHH, HI, 96860, USA

Set-Aside

NONE

Documents

(1)

Sole-Source+Justification+for+SAP+Procedures_Signed_Redacted.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Pacific
Contacts2 people available
OfficeJBPHH, HI, 96860-3134, USA
Organization / Agency
Department Of Defense → Navfacsyscom Pacific
View Agency Profile
Office AddressJBPHH, HI, 96860-3134, USA

Full Description

Show more

Please see attached J&A.

Similar Contracts

NAICS: 562910
New
SLED
Terminal 25 (T-25) South Habitat Restoration - GC/CM Pre-ConstructionThe Terminal 25 (T-25) South Habitat Restoration project is a comprehensive environmental remediation and habitat restoration initiative led by the Port of Seattle through its Waterfront Project Management division, with a solicitation number of MC-0322591 and a NAICS code of 562910. The project spans approximately nine to ten acres and involves CERCLA-guided removal and disposal of contaminated materials including in-water sediment, creosote-treated timber wharf remnants, and upland soils, followed by the construction of restored ecological habitats such as off-channel emergent marsh, intertidal benches, and riparian areas. Earthwork requirements are substantial, with 80,000 cubic yards of excavation and approximately 70,000 cubic yards of import and placement for upland cleanup, 65,000 cubic yards of excavation and 30,000 cubic yards of import and placement for in-water work, and 29,000 cubic yards of excavation and 10,000 cubic yards of import and placement for habitat restoration, including the planting of over 30,000 native plants under a specified planting plan. Work is strictly governed by operational windows, particularly in-water and tidal work restrictions aligned with seasonal fish protection periods. The procurement process will be conducted as a two-stage, evaluative General Contractor/Construction Manager (GC/CM) acquisition beginning with a Request for Qualifications (RFQ) to be issued on July 16, 2026, followed by a Request for Proposals (RFP) on September 18, 2026, both hosted exclusively on the VendorConnect portal. Proposals are due in November 2026, with a Notice of Intent to Award expected in December 2026. Potential offerors must register as Plan Holders on VendorConnect to receive updates and are instructed not to rely on verbal communications, directing all inquiries to Leila Gonzalez-Rigatto at the Port of Seattle. The pre-construction phase will begin with contract execution and 30% design completion by February 2027, leading to full design and permitting by Q4 2028, with construction slated from Q1 2029 through Q2 2031 and substantial completion targeted for Q2 2031. No contract value, pricing structure, or specific evaluation weights have been disclosed;
Waterfront Project Management

POSTED

about 8 hours ago

DEADLINE

N/A
View Details