Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Mooretown Tribal Landscape Cultural Fire Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mooretown Tribal Landscape Cultural Fire Project is a culturally driven land management initiative led by the Mooretown Rancheria of Maidu Indians of California, in coordination with the Butte County Resource Conservation District, to restore ecological balance and cultural traditions in an area devastated by the 2020 North Complex Fire. The project targets 38 designated subunits across Federal and potentially adjacent private lands in Butte County, where widespread even-aged brush has replaced native vegetation following near-total tree mortality. The goal is to reestablish an uneven-aged mosaic of vegetation through controlled broadcast burns conducted annually between August 16 and January 31, avoiding the bird nesting season from February 1 to August 15. To support this, crews will construct approximately 3.2 miles of permanent fireline corridors, each three feet wide, using manual and non-ground-disturbing mechanical tools to clear vegetation and scrape down to bare mineral soil, resulting in a total disturbance of 1.16 acres. These firelines are designed as long-term infrastructure to facilitate repeated burns as part of a sustainable cultural stewardship strategy. Work is restricted to avoid riparian areas with a mandatory 100-foot buffer around streams, prohibits the use of hazardous materials, and requires pre-burn nesting bird surveys, cultural resource assessments, and coordination with the Tribal Historic Preservation Officer. All burning activities follow CEQA categorical exemptions and require permits from CAL FIRE and the Butte County Air Quality Management District. Monitoring and acceptance occur on-site, with oversight shared among the Tribe, the Resource Conservation District, and regulatory agencies including the Regional Water Quality Control Board and the Bureau of Land Management. While no formal contract value, pricing structure, or federal solicitation number is provided, the project is supported by state grants and federal co-stewardship agreements, with all operations strictly adherence to environmental best practices and cultural protocols.

General Info

Mooretown Tribe leads cultural burns to restore land after wildfire, using firelines and strict ecological protections.

Agency

California → Butte County Resource Conservation

NAICS

561730 - Landscaping ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Mooretown Tribal Landscape Cultural Fire Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Butte County Resource Conservation
Contacts1 person available
OfficeN/A
Organization / Agency
California → Butte County Resource Conservation
Office AddressN/A
Contacts
Thad WalkerDistrict Manager

Full Description

Show more
The project area experienced 90-100% mortality during the 2020 North Complex Fire emergency, resulting in a vegetation community characterized by wide-scale even-aged resprouting brush. To meet ecological and cultural objectives, the Tribe desires to reburn this landscape in smaller sections, ranging from (approximately) 3 to 106 acres. This would promote an uneven-aged mosaic of vegetation, benefiting oak woodlands, culturally important shrubs and geophytes, and wildlife habitat. To this end, 38 subunits have been delineated (see map). This project would 1) create fire control features between these beneficial fire subunits (where control features don’t already exist) and then 2) apply beneficial fire under prescription to one or more subunits at a time. To create the new fire control features, crews would use manual means (e.g. metal-bladed weed whips, loppers) and non-ground-disturbing mechanical means (e.g. mowers) to remove vegetation along fireline corridors 3 feet wide. Next, these corridors would be scraped down to bare mineral soil. Firelines would be designed to be maintained as permanent features, since these units will be re-burned over and over every few years as the core of a Tribal land management strategy. A total of about 3.2 miles of new fireline would be cleared. At a 3foot width, this amounts to a total disturbance acreage of 1.16 acres. BMPs built into the project minimize water quality impacts. Subunits would be broadcast-burned in fall. Some burning of piles/invasive weeds could take place in spring, after visual bird checks. Work to be done on Federal lands would require separate NEPA clearance. Work to be done on adjacent private non-Tribal lands, if any, would require signed access/work agreements with those landowner(s). Broadcast burning would occur outside of nesting season (i.e. work would be conducted Aug 16-Jan 31) or pre-implementation nesting bird surveys would be done 1-3 days prior.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
RFQ5901 Grass Mowing Services
Solicitation # 5901
This subcontracting opportunity with Management & Training Corporation (MTC) seeks qualified small businesses to provide comprehensive grass mowing and grounds maintenance services at the San Diego Job Corps Center located at 1325 Iris Ave, Imperial Beach, CA 91932. The solicitation, identified as RFQ5901, is set aside exclusively for small business concerns including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business, with a NAICS code of 561730. The base performance period runs from August 24, 2026, through January 31, 2027, with two option years extending through January 31, 2029. Contractors must submit a completed Bid Sheet with proposed hourly rates for bi-weekly mowing services and option years, along with the full MTC Supplier Packet—including W9, Acceptance of MTC Terms and Conditions, and Self-Certification form—as well as a current Certificate of Insurance meeting minimum commercial coverage requirements: $500,000 employer’s liability, $1 million general liability per occurrence with $3 million aggregate, $1 million automotive liability, and optionally professional liability insurance. MTC and the U.S. Department of Labor must approve all contractors prior to award, and all bids must be submitted in ink or typewritten with no erasures, and any exceptions must be clearly documented. The scope of work requires full labor, equipment, materials, and supervision to maintain a clean, safe, and professional appearance across the facility, including bi-weekly mowing of designated grass areas such as the cafeteria, baseball field, Building 60, and entrance zones, with immediate removal of clippings from all paved surfaces. Additional duties include hedge trimming in the interior courtyard, weed abatement using approved herbicides like glyphosate, irrigation system maintenance and repair, seasonal fall cleanup, and debris removal with off-site disposal. Work must comply with OSHA standards, federal, state, and local safety regulations, and be performed in a professional and workmanlike manner. Contractors are bound by FAR 52.222-41 Service Contract Labor Standards under Wage Determination WD# 2015-5635 (MOD 29) dated December 3, 2025, and must pay prevailing federal contractor minimum wages. They must
San Diego Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 561730
New
SLED
Traffic Control and Signage ManagementThe contract encompasses the comprehensive management of temporary traffic control systems for construction activities, requiring the installation, maintenance, and removal of all associated signage, barriers, and control devices in strict compliance with the Manual on Uniform Traffic Control Devices. Coordination with the Texas Department of Transportation is mandatory for securing lane closures and ensuring seamless integration with ongoing highway operations. All work must adhere to established safety standards and operational protocols to minimize disruption and protect workers and the public. The scope demands proactive planning, real-time communication with agency officials, and consistent adherence to MUTCD guidelines throughout the project lifecycle. This is a subcontract opportunity under NAICS code 561730, focused on services provided to the Texas Department of Transportation, with a response deadline of September 2, 2026. The contract is open for submission through the TX SmartBuy portal, with no set-aside designation specified. Performance will occur across various locations within Texas where TxDOT-managed construction projects are active, and bidders are expected to demonstrate proven experience in traffic control systems, regulatory compliance, and coordination with state transportation authorities. The contract does not specify a fixed location, implying that work may be distributed across multiple projects statewide, requiring flexibility and scalability in operational capacity.
Texas Department of Transportation

POSTED

about 10 hours ago

DEADLINE

in 26 days
View Details