Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Moraga Avenue Wireless Communication Facility

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Diego, CA, 92117

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Full Description

Show more
Neighborhood Use Permit (NUP) to continue the operation of an existing wireless communication facility (WCF) located on the rooftop of an existing building concealed within a monument tower and includes nine (9) existing panel antennas and three (3) existing radio remote units (RRUs). Additionally, the project includes existing ancillary equipment to support the WCF, within an at grade 190-square-foot equipment enclosure located within the building. The project is located at 4330 Moraga Avenue in the Clairemont Mesa Community Plan area in the RM-1-1 base zone in Council District 2. No changes to the WCF are proposed.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 541380
New
SLED
Midway Rising Specific PlanThe Midway Rising Specific Plan is a comprehensive redevelopment project managed by the City of San Diego to transform approximately 49.23 acres of City-owned property, including the current Sports Arena site, into a transit-oriented mixed-use community village. The project involves significant regulatory actions, including a General Plan and Community Plan Amendment, rezoning from Community Commercial-Residential to Mixed-Use Residential, and the adoption of a Specific Plan to establish development standards and architectural guidelines. The buildout is designed to accommodate approximately 4,254 housing units, including up to 2,000 affordable units, alongside 130,000 square feet of commercial space and a multi-purpose Entertainment Center. The plan also integrates approximately 8.12 acres of parks and extensive public open space, supported by critical infrastructure upgrades to water, sewer, storm drains, roadways, and transit facilities. Extensive environmental and technical assessments have been conducted to support the project's implementation and ensure compliance with the California Environmental Quality Act (CEQA). These studies address diverse factors such as geotechnical stability, including liquefaction hazards; environmental site assessments for soil and groundwater contamination; and air quality and greenhouse gas impacts. Transportation analyses, including Vehicle Miles Traveled (VMT) and local mobility studies, have been performed to mitigate impacts on the regional network, while noise, biological resource, and cultural resource reports provide frameworks for managing unavoidable environmental effects. The project is subject to various regulatory overlays, including airport land use compatibility, coastal height limitations, and transit priority zones, and requires careful management of hazardous materials and waste as part of its large-scale urban redevelopment.
Testing Laboratories and Services

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 611110
SLED
Avion PropertyThe City of San Diego has issued a Conditional Use Permit for the construction of The Cambridge School, a private Pre-K through 12th grade campus located on a 6.52-acre site at the southwest corner of Camino Del Sur and Coyote Bush Drive. The development features a 182,868 square-foot three-story classroom building, a 10,904 square-foot one-story multipurpose building, and a track and sports field. Parking is provided via a semi-subterranean two-level structure containing 345 spaces and 41 surface spaces, totaling 386 parking spots. The project is situated within the Black Mountain Ranch Community Plan Area, specifically in the CC-4-5 base zone and the Urban Village Overlay Zone. Comprehensive environmental and technical evaluations have been conducted to ensure compliance with CEQA and local standards. Key assessments include a geotechnical investigation for site preparation, a Phase I Environmental Site Assessment identifying potential agricultural pesticide residues, and a hydrology report confirming that post-development runoff will not exceed pre-development rates. The project has undergone air quality, noise, and waste management analyses, as well as a local mobility and Vehicle Miles Traveled assessment. While the VMT assessment identified significant impacts, mitigation is planned through the City of San Diego Complete Communities: Mobility Choices Program. Additionally, the project includes paleontological monitoring to mitigate impacts on high-sensitivity resources.
Elementary and Secondary Schools

POSTED

7 days ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS