Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on September 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mountain Vista Bridge Replacement Project

Closed
10204State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signals and lighting, along with environmental support including storm water pollution prevention and waste management. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, WBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. The deadline for responses is November 18, 2025, with bid instructions and submissions managed through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
SB Minor B - Guardrail Replacement - San Diego County
Solicitation # 11A4460
The California Department of Transportation is soliciting bids for contract 11A4460, which involves guardrail replacement on I-8 in San Diego County. The project scope specifically includes the installation of the Midwest Guardrail System, featuring Type SFT-M End Anchor Assemblies and Type AGT Transition Railing at the Grossmont Center Drive/La Mesa Boulevard off-ramp (westbound) and West Willow (eastbound). This is a Small Business Minor B set-aside, requiring bidders to be certified small businesses at the time of bid opening and award. Bids must be submitted via email to Arlena Tedder by November 6, 2026, and any proposal exceeding $484,000.00 will be rejected. Award is based on a unit price-based bid, and the contractor must comply with 2025 Standard Specifications and Plans, as well as Cal/OSHA and CA RWQCB Region 9 regulations. Required submission documents include the Price Quote Proposal for Unit Items, Subcontractor List, Payee Data Record, and various certifications regarding civil rights and small business status. While DVBE goals are not established, participation is encouraged. Payment bonds are required for bids exceeding $25,000, and insurance certificates must be provided upon award. Invoicing is handled via progress payments for contracts over 20 working days, with a 25 percent withholding penalty if final utilization forms are missing.
California Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in 13 days
NAICS: 237310
New
SLED
Old Route 22 Culvert Replacement Project
Solicitation # 036-26-010
Bethel Township in Berks County, Pennsylvania, is soliciting sealed electronic proposals via the PennBid Program for the Old Route 22 Culvert Replacement Project, solicitation number 036-26-010. The project scope involves the demolition and removal of an existing culvert pipe and concrete endwalls, the installation of a new 36 inch SLCPP culvert pipe with precast concrete endwalls, minor grading, placement of riprap and scour protection, and roadway restoration. Bids are due by 10:00 a.m. on November 11, 2026. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, based on a combination of lump sum and unit price evaluations. Proposals must include a bid bond or bank cashier's check for ten percent of the bid total, along with a non-collusion affidavit, a Workmen's Compensation Act affidavit, and an Act 127 Public Works Employment Verification Form. The project is subject to Pennsylvania Department of Labor and Industry prevailing wage rates and requires compliance with Buy America certifications for steel and iron products. Successful bidders must provide performance and payment bonds and maintain employer liability insurance with limits of 500,000 dollars per accident and employee. Performance begins within 30 to 60 days of the contract effective date or notice to proceed, with all work performed at 8541 Old Route 22, Bethel, PA.
Berks County

POSTED

about 20 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Mountain Vista Bridge Replacement Project in Larimer County, Colorado, involves replacing an existing corrugated metal culvert with a cast-in-place concrete box culvert, aiming to improve infrastructure within the City of Fort Collins. The scope includes grading of ditches, removal of a 24-inch metal pipe, installation of PVC piping, shoring operations, and paving with hot mix asphalt. The project is valued between five and fifteen million dollars and is part of a solicitation issued by the City of Fort Collins, with responses due by October 1, 2025. The contract emphasizes construction activities that require careful coordination of demolition, excavation, pipe installation, and paving to ensure the structural integrity and safety of the bridge replacement. The project is managed by Adam Hill, whose contact information is provided for inquiries. The contract documents outline detailed requirements for construction, safety, and project completion timelines, ensuring compliance with local standards and specifications. Bidders are encouraged to review the full solicitation through the provided link to understand the scope, submission procedures, and evaluation criteria. Overall, this project aims to enhance transportation infrastructure in the area, with a focus on efficient execution and adherence to quality standards.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Apr 24, 2024 to Oct 1, 2025. The notice title changed. NAICS code changed from 541310 to 237310. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → City of Fort Collins
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
10204 - Mountain Vista Bridge Replacement Project. Located in Larimer County, Colorado, within the City of Fort Collins. The contract documents outline the terms for the construction project identified as Bid 10204 for the Mountain Vista Bridge Replacement. The scope of work involves dismantling an existing corrugated metal culvert and substituting it with a cast-in-place concrete box culvert. Key components of the project include grading of ditches, removal of a 24-inch metal pipe, installation of PVC piping, shoring operations, and HMA paving.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS