Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Florida was posted on February 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mowry Road Culvert Replacement

Awarded
Florida-FY26-ITB-018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The University of Florida is soliciting competitive bids for the Mowry Road Culvert Replacement project located at the intersection of Mowry Road and Hull Road in Gainesville, Florida. The scope of work includes the installation of a new culvert and the replacement of an existing one, with the base bid requiring pricing for cleaning an adjacent culvert and an optional bid for adding an apron to that same culvert. The awarded contractor is responsible for obtaining all necessary permits, developing a Maintenance of Traffic plan, and submitting a Stormwater Pollution Prevention Plan within 15 days of the award. All work must adhere to UF Design and Construction Standards, with specific requirements for regrading to ensure positive drainage, sodding slopes of 4:1 or greater, and restoring grassed areas with perennial peanut groundcover. Project performance requires strict adherence to a timeline with substantial completion due by May 29, 2026. Failure to meet this deadline will result in liquidated damages calculated at 7% of the project cost per calendar day. The contractor must provide dated video documentation at the start, during significant phases, and upon completion of the work, and must notify the university 24 hours prior to all inspections. Bidders must submit their electronic proposals by March 25, 2026, and must have attended the mandatory pre-bid meeting. Required certifications include an attestation of the principal place of business in Florida and a certification that the entity is not owned or controlled by a foreign country of concern.

General Info

UF seeks bids for Mowry Road culvert replacement, due March 25, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1

FY26-ITB-018.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of Florida
Contacts1 person available
OfficeFL
Organization / AgencyUniversity of Florida
Office AddressFL
Contacts
Rejoy Varghese

Full Description

Show more
Scope of work The purpose of this Invitation to Bid (ITB) is to solicit competitive bids to provide and install a new culvert and replace the existing culvert at the intersection Mowry road and Hull road in front of the Wallace Building 2390 Mowry Road Gainesville, FL 32611 as described in the technical specifications and Site drawing found in the Buyer Attachment. Permits required to complete the culvert replacement must be obtained prior to commencement of work. The topographic survey referenced in the Mowry Road Culvert Technical Specifications within the Buyer Attachments depicts the landscape of the site and the utility information needed for installation. Upon award, Contractor shall obtain all required permits required to complete the project. UF Permits Website can be found at - https://www.ehs.ufl.edu/howto___trashed/apply-for-a-building-permit/ All work shall be completed in compliance as per current codes and UF Design & Construction Standards. UF Standards can be found at - https://facilities.ufl.edu/projects/forms-standards/design-construction-standards/ All inspections required to meet code and UF Standards shall be coordinated by Contractors and/or Subcontractors. UF needs to be notified 24 hours in advance of all inspections. Inspections information can be found at https://www.ehs.ufl.edu/departments/facility-support-services/building-codesenforcement/inspections/ Contractors shall attend the mandatory pre-bid meetings, and any other required meetings during bid and award process. The mandatory Pre-bid meeting will be February 24th at 10:00AM in front of the Wallace building at 2390 Mowry Rd Gainesville, FL 32611. Upon award, contractor is responsible for removal and disposal of all debris and materials in accordance with local and environmental regulations and responsible for cleanup of site daily. Upon award of the contract, the Contractor shall be responsible for preparing and submitting a Stormwater Pollution Prevention Plan (SWPPP) to the University of Florida (UF) project team for review and approval. The SWPPP must be provided within 15 days of contract award and shall not be implemented until written approval is received from the UF team. The Contractor shall ensure that all work is performed in compliance with the approved SWPPP and all applicable federal, state, and local regulations. The awarded contractor will be responsible for regrading all culverts and swales that flow to this area to provide positive drainage. All disturbed areas 4:1 or greater shall be sodded to prevent erosion. Additional sod may be used as needed. The Engineer of record (EOR) is to be alerted of any complications or deviations from the plan. (area shown in figure 4 in Mowry Road Culvert Technical Specifications in buyer attachment) The Contractor shall be responsible for verifying that all finished grades conform to the approved plans, profiles, and specifications. Verification MUST be performed using appropriate surveying or positioning tools and equipment. Contractor is responsible for locating all existing utilities within the work limits of all improvements. The contractor is also responsible for protecting all existing utilities during construction. In the event that a utility conflict occurs, contractor shall notify the project manager, engineer, and utility to coordinate remedial action. Contractor must restore all disturbed areas to pre-construction condition or better. This includes, but is not limited to, roads, driveways, ditches, landscaping, and any other affected features. All restored grassed areas must be replanted with perennial peanut groundcover as shown in Figure 3 within the Mowry Road Culvert Technical specifications found in the Buyer Attachments. The Contractor shall be solely responsible for the maintenance of traffic within and around the project limits throughout the duration of the work. This includes the development, implementation, and ongoing management of a Maintenance of Traffic (MOT) plan in accordance with all applicable local, state, and federal regulations and guidelines. Provide, install, maintain, and remove all necessary traffic control devices (signs, cones, barricades, flaggers, etc.) to ensure the safety of the public and work crews. Contractor needs to include this in their technical proposal submission (reference question 1.4). Upon award, Contractor shall provide video documentation of the work area at three key stages: (1) prior to commencement of work, (2) during significant phases of the work, and (3) upon completion. Videos shall be dated and submitted to ACC within 24 hours of recording (link provided after award) and uploaded to the photos section. The purpose of this requirement is to ensure proper recordkeeping and job site monitoring. Work is expected to be done during regular working hours. Substantial Completion of this project should be done before May 29th, 2026. The vendor shall notify UF Facilities Project Manager in writing within two (2) business days of any event likely to delay the completion of the project. In asmuch as failure to Substantially Complete the Work within the date mentioned here will result in injury to the Owner, and as damages arising from such failure cannot be calculated with any degree of certainty, it is agreed that if the Work is not Substantially Completed within the time provided or within such further time, if any, as shall be allowed for time extensions in accordance with the provisions of this contract, the contractor shall pay to the Owner as liquidated damages for such delay, and not as a penalty, the amount based on 7% of the project cost, prorated for each calendar day elapsing between the date fixed for Substantial Completion and the date such Substantial Completion is fully accomplished. The parties agree that said liquidated damages are reasonable given existing circumstances, including, without limitation, the range of harm that is foreseeable and the anticipation that proof of damages would be costly and impractical. Please include pricing for cleaning out the adjacent culvert in the Base bid. Please Add Optional pricing for adding an apron to the adjacent culvert in your bid.

More opportunities from University of Florida

Same awarding agency

NAICS: 531120
New
SLED
University of Florida - GradHaus
Solicitation # ITN2026-104
The University of Florida Office of Real Estate has issued Invitation to Negotiate ITN2026-104 to secure a leased facility for the College of the Arts GradHaus, dedicated to graduate research in art development. The university seeks a space between 6,500 and 8,500 usable square feet, preferably within two miles of the main campus in Gainesville, with a desired occupancy date of May 1, 2028. The facility must support diverse artistic practices including ceramics, sculpture, and art technology, requiring specific infrastructure such as industrial-level ventilation, an eye wash station, an industrial sink, and the capacity to store flammable materials in safety cabinets. The layout should accommodate 25 partitioned design studios, two administrative offices, a graduate lecture area for 10 students, a break room, and a storage room, along with a roll-up loading door and at least 15 to 25 parking spaces. Proposals are due by November 19, 2026, and must be submitted in sealed envelopes to the Office of Real Estate. Evaluation will be based on the best interest of the university, considering landlord capability, management expertise, financial terms, lease flexibility, past performance, and willingness to accept the University of Florida's standard lease terms. The landlord is responsible for all leasehold improvements, ensuring work meets university design standards and complies with all local health, building, and safety codes. Final award and payment obligations are contingent upon annual appropriations by the Florida Legislature or grant funding. All respondents must certify non-collusion and compliance with federal debarment regulations.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

5 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS