Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Kansas was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MS9-L25001 - 15th/Learnard Sanitary Sewer Extension

Closed
CIFB-2600021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, involves a comprehensive series of facility repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical infrastructure improvements, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and structural repairs for 11 buildings. Additionally, the contract requires significant plumbing repairs in Multipurpose Building 3 and critical upgrades to the wastewater treatment plant, specifically replacing worn valves, installing a sewage grinder on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order for 8(a) MACC IDIQ offerors. Contractors must adhere to the TX20260236 wage determination for Cameron County and meet strict requirements regarding key personnel qualifications, quality control, and safety standards. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Proposals are subject to technical evaluations focusing on the approach to safety and quality assurance, with a response deadline of September 10, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 14 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. Managed by Garney Pacific, Inc. for the Jurupa Community Services District, the scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, the construction of flow control facility components, and the overall disinfection, startup, and commissioning of the pipeline system. This solicitation seeks subcontractor and supplier quotes for various trade scopes, including steel pipe welding, electrical and instrumentation, trenchless construction, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes and any exceptions to the Garney Standard PO and Subcontract Forms must be submitted to Alyssa Callaway by September 18, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the modification of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage and tie-in work. Additionally, the project requires the planting of six native trees and approximately 345 native plants, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. The primary objective of the project is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, with an encouragement for these entities to form consortiums for larger bid items. Bids must be submitted by September 17, 2026, at 4:00 P.M. The primary point of contact for this effort is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional deliverables include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. All negotiations must be finalized 24 hours prior to the bid opening. Technical plans and specifications are available through the James W. Fowler website.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The City of Lawrence, Kansas, through its Municipal Services & Operations Department under MSO - CMED, is soliciting bids for the MS9-L25001 – 15th/Learnard Sanitary Sewer Extension project, with a solicitation number of CIFB-2600021 and a response deadline of July 21, 2026. The project involves the construction of approximately 150 linear feet of 8-inch sanitary sewer main, installation of three manholes and three service connections, and the removal and replacement of a 4-inch sanitary service pipe, along with all ancillary work necessary to complete the system. All work must comply with applicable industry standards including ASTM, AASHTO, KDOT, AWWA, and ANSI specifications, with specific requirements for pipeline integrity, grout strength, compaction per ASTM D6938 or D8167, and air testing at 4 psi with a minimum 3.5 psi hold over two minutes. Flow testing must ensure no standing water exceeding 1/8 inch over three feet in length, and landscaping must achieve at least 90% seeded coverage with no bare spots larger than 6x6 inches, all conforming to American Standards for Nursery Stock. Performance, statutory, and maintenance bonds are required, with payment terms specifying 30 days from acceptance of work and a 5% retainage. Invoicing must be submitted exclusively through the City’s Capital Project Management Software (CPMS), and inspections and final acceptance are conducted at the project site by City representatives, with the contractor responsible for correcting all deficiencies. The contract is executed as a fixed-price construction agreement without a clearly defined total value or itemized pricing details in the provided documentation. The place of performance is in Lawrence, Kansas, with no FOB terms specified and all work to be performed on-site. Bidders are required to submit complete proposals electronically via the City’s procurement portal, using official forms, along with financial statements, qualified subcontractor disclosures, a bid bond validated through Surety2000, and a statement of qualifications. No FAR clauses were adopted; instead, internal general conditions and special provisions govern the contract. Offerors must provide a Federal Employer Identification Number and Kansas Business Identity Number but are not required to hold a UEI, CAGE code, or declare socioeconomic status, indicating this is a local, non-federal procurement without small business set-asides. Bidders must disclose any history

General Info

City of Lawrence seeks bids for 150-foot sewer extension with manholes, connections, and strict compliance standards.

Agency

Kansas → MSO - CMEDView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

KS, USA

Set-Aside

NONE

Documents

(2)

MS9-L25001 15th/Learnard SS Extension Project Manual

PDFrfb

MS9-L25001 15th Learnard Plans Approved - City of Lawrence

PDFapproved-plans

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → MSO - CMED
Contacts2 people available
OfficeLawrence, KS, 66044, USA
Organization / Agency
Kansas → MSO - CMED
View Agency Profile
Office AddressLawrence, KS, 66044, USA
Contacts
Kevin BrownEngineering Program Manager

Interested Companies (8)

Show more
Kissick Construction
Kansas City, MO
Price Excavating
Baldwin City, KS
JE Dunn Construction
Kansas City, MO

See All 8 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project includes, but is not limited to, construction of approximately 150 LF of 8-inch sanitary sewer main, three manholes, three service connections; removal and replacement of 4-inch sanitary service pipe; and all other work necessary to complete the project.

More opportunities from Kansas → MSO - CMED

Same awarding agency

NAICS: 237110
SLED
MS-220015C Pump Stations 44 & 45 Abandonment
Solicitation # 2600028
Project MS-220015C, issued by the City of Lawrence, Kansas, under solicitation CIFB-2600028, involves the abandonment of Pump Stations 44 and 45 and the implementation of comprehensive sanitary sewer improvements. The scope of work includes the installation of approximately 3,054 linear feet of PVC piping in various diameters, the installation of 11 four-foot diameter manholes and 3 five-foot diameter inside drop manholes, and the epoxy rehabilitation of existing manholes. Additional requirements include temporary pumping, dam evaluation and restoration, and five stream crossing restorations. The abandonment phase requires the removal and salvage of equipment, piping, valves, and structures, as well as the abandonment of six air release valve vaults and various pipes. The project is governed by the City of Lawrence Construction Contract, with a bid deadline of September 22, 2026. Awarding is based on the lowest and best bid, evaluating the bidder's business presence, financial status, technical experience, and equipment. Key performance milestones require the completion of sanitary sewer work downstream of MH A6 and various restoration and planting tasks by May 15, 2027, with overall substantial completion due by June 18, 2027. Contractors must provide a 5% bid bond, a 100% performance bond, and a statutory bond, while adhering to Kansas Act Against Discrimination requirements and City of Lawrence Technical Specifications.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS