MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP Rehabilitation of Two Medicine Road

Active
69056726B000005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Department of Transportation, Federal Highway Administration Western Federal Lands Division, is soliciting sealed bids for the rehabilitation of Two Medicine Road under solicitation number 69056726B000005, with a response deadline of July 31, 2026. This construction project, designated MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), involves the reconstruction of a 7.22-mile asphalt roadway located four miles northwest of East Glacier Park, Montana, along with replacement of existing culverts, milled and overlaid parking areas, and other ancillary work. The project adheres to Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, and utilizes the Masterworks web-based system for documentation, CDRs, and submittals. All bids must comply with the Invitation for Bids, accompanying plans, physical data, and Construction Contract Administration Document, and must be submitted as sealed envelopes or through authorized electronic means, manually signed and properly labeled with the solicitation number, bidder information, and receipt deadline. The evaluation is based solely on price, with a 10% price preference applied to offers from HUBZone small business concerns, while HUBZone joint ventures must ensure that at least 40% of the aggregate work is performed by the HUBZone small business parties. The contract requires compliance with FAR clauses covering definitions, assignment of claims, defective pricing, contractor quality control, labor standards, and system for award management. The contractor must begin work within 10 days of receiving the notice to proceed and complete all work, including final cleanup, by October 15, 2027, assuming timely issuance of the notice by September 14, 2026. A detailed Critical Path Method schedule must be submitted within five days of work commencement, incorporating all activities from award to completion, tied to contract pay items and including submittal, fabrication, and delivery timelines. Quality control demands a dedicated Quality Control Manager with no operational duties and an approved alternate, along with linear control charts posted onsite and in the project lab. Environmental requirements include an approved Stormwater Pollution Prevention Plan, adherence to ASTM F2019 for culvert liner handling and storage, and wetland mitigation of 1,100 square yards. Bidders must register in the System for Award Management with a current UEI and TIN, and provide CAGE

General Info

Rehabilitation of 7.22 miles Two Medicine Road, Montana including pavement, culverts, and environmental mitigation, completion Fall 2027.

Agency

Department Of Transportation → 690567 Western Federal Lands DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

East Glacier Park, MT, USA

Set-Aside

NONE

Documents

(8)

Physical+Data_3_MT+FLAP+BLACKF+12%281%29+.zip

ZIP

MT FLAP BLACKF 12(1) FLAP Rehabilitation Two Medicine Road Project Description

PDFsow

Amendment A001 to Solicitation 69056726B000005 for FLAP & FLTP Rehabilitation of Two Medicine Road

PDFamendment

Physical+Data_2_MT+FLAP+BLACKF+12%281%29+.zip

ZIP

Physical+Data_1_MT+FLAP+BLACKF+12%281%29+.zip

ZIP

IFB for Glacier National Park Roadway Reconstruction and Improvements MT FLAP BLACKF 12(1) & GLAC 12(2)

PDFifb

QandA 07-02-2026 for MT FLAP BLACKF 12(1) & MT NP GLAC 12(2) Project

PDFq-and-a

IFB 69056726B000005 FLAP & FLTP Rehabilitation of Two Medicine Road

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Organization / Agency
Department Of Transportation → 690567 Western Federal Lands Division
View Agency Profile
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

Update 07/10/2026: Amendment A001.pdf Posted to attachements.


Update 07/02/2026: QandA_07-02-2026.pdf posted to attachments.


Solicitation for contruction project, MT FLAP BLACKF 12(1) & MT NP GLAC 12(2), FLAP & FLTP Rehabilitation of Two Medicine Road


The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026This contract encompasses a wide range of pavement and infrastructure work to be performed across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. The scope includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping of existing pavement markings, surface preparation for new striping, various paint markings, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road water drainage systems, some of which may require permits. All work must comply with applicable standards and be executed at various port-wide sites as needed. The contract is titled Asphalt Paving & Striping Portwide Unit Price 2026 and is forecasted for issuance under NAICS code 237310. It is managed by the Port of Seattle through its Port Construction Services division, with Heather Bowden as the primary point of contact and Lesley Miles serving as Project Manager. The solicitation is posted on the Port’s online portal and is intended to establish unit pricing for ongoing and future work at the port’s facilities, enabling efficient task order execution without a formal bidding process at the time of individual job requests. Work is expected to begin in 2026 and will be performed on an as-needed basis across the port’s extensive property network.
Port Construction Services

POSTED

about 3 hours ago

DEADLINE

N/A
View Details