Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on October 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MT FLAP DOT 236(2), Winifred North

Awarded
69056725B000010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
The Chickasaw County Board of Supervisors will receive sealed bids in the office of the County Purchase Clerk, 146 County Road 412, Houston, Mississippi 38851, until 10:00 A.M., 30, October, 2026, and thereafter publicly opened for the furnishing, haulin
Solicitation # 3170036833
The Chickasaw County Board of Supervisors is soliciting sealed bids for the furnishing, hauling, placing, and compacting of bituminous hot mix, as-needed base repairs, and the removal and replacement of roadway cross-drains within Chickasaw County, Mississippi. Under solicitation number 3170036833, the scope of work includes hot mix asphalt overlays and leveling using MDOT approved mixes, as well as minor and major base repairs and the installation of HP pipes ranging from 12 to 48 inches. Bids must be submitted by 10:00 A.M. on October 30, 2026, either electronically via Agencybidbank.com or delivered to the County Purchase Clerk in Houston, Mississippi. Physical submissions must be sealed and labeled with the specific bid title and the contractor's Certificate of Responsibility number. The contract will operate on a quantity unit pricing basis, with work assigned through individual work orders that must be completed within 45 calendar days of issuance. Accepted bid prices will remain valid for a 12-month period from November 2, 2026, to November 2, 2027. Contractors are required to coordinate with Mississippi 811 for utility location prior to any excavation and must adhere to the latest Mississippi State Highway Department Special Provisions for asphalt fuel adjustments. The Board of Supervisors reserves the right to reject any bids or waive formalities to serve the county's best interests. Primary administrative contact for this solicitation is Purchase Clerk Courtney Gann.
MPTAP

POSTED

about 1 hour ago

DEADLINE

in 2 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; pipeline and utility work involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signals and lighting. Additional requirements encompass environmental compliance through Storm Water Pollution Prevention (SWPPP), trucking, hauling, and the supply of materials such as ready mix and precast concrete. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a final bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract pertains to Project MT FLAP DOT 236(2) in Winifred North, with the primary focus on transportation infrastructure improvements in Montana. The solicitation was issued by the Western Federal Lands Division of the Department of Transportation, located in Vancouver, Washington. The contract is associated with NAICS code 237310, which covers highway, street, and bridge construction. The response deadline for bids was October 21, 2025, and the contract was publicly posted on October 22, 2025. Key documents related to the project, including QA updates and bid summaries, were released on various dates in October 2025, providing detailed requirements and bid tabulations for interested parties. The primary point of contact for inquiries is the Contracts G. Office, reachable via email at [email hidden] or by phone at [phone hidden]. The project scope and specific requirements are detailed in the attachments, which are integral to understanding the full scope of work.

General Info

Federal Highway contract for Montana bridge construction, responses due by October 21, 2025.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

MT, USA

Set-Aside

NONE

Documents

11

DOT 236(2) Winifred North Plans

PDF, High priority: read this firstspecifications
High

Final Geotechnical Report MT FLAP DOT 236(2) Winifred - North

PDF, High priority: read this firstgeotechnical-report
High

Solicitation 69056725B000010 - Winifred North (MT FLAP DOT 236(2))

PDF, High priority: read this firstifb
High

Winifred North Hydraulics Design Memorandum MT FLAP DOT 236(2)

PDF, High priority: read this firsthydraulics-memorandum
High

69056725B000010 - Bid Opening Summary: Winifred North

PDF, Low prioritybid-opening-summary
Low

69056725B000010 - Winifred North Bid Tabulations

PDF, Low prioritybid-tabulation
Low

MT FLAP DOT 236 (20) - Q&A 10/14/2025

PDF, Low priorityq-and-a
Low

MT FLAP DOT 236 (20) Question and Answer

PDF, Low priorityq-and-a
Low

MT FLAP DOT 236 (20) - Winifred North Q&A

PDF, Low priorityq-and-a
Low

MT FLAP DOT 236(2) Winifred North Survey Control Points

XLSX, Low prioritysurvey-control-sheet
Low

Winifred North Grizzly Bear Sightings Log FY 2025

DOCX, Low prioritylog
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseAwarded
Posted

Solicitation

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

Project MT FLAP DOT 236(2), Winifred North


See attachments for full requirements.


QA_10_14_2025 Posted 10/14/2025


QA_10_15_2025 Posted 10/15/2025


QA_10_17_2025 Posted 10/17/2025


Bid Summary Posted 10/21/2025


Bid Tabulations Posted 10/22/2025

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 237310
New
Federal
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Solicitation # 69056726B000010
Solicitation 69056726B000010 is an Invitation for Bids for the Hurricane Ridge Rockfall Mitigation MP 9.4 project located in Olympic National Park, Clallam County, Washington. This firm fixed-price construction project, managed by the Department of Transportation's Federal Highway Administration Western Federal Lands Division, involves the installation of a rockfall mitigation system approximately 11 miles south of Port Angeles. The scope of work includes the installation of 102 linear feet of Geobrugg RXE-8000 flexible rockfall barrier fence and the treatment of 260 square yards of galvanized steel using Natina Steel weathering agent. Additional requirements include survey and staking, quality control, testing, clearing and grubbing, excavation, and the construction of retaining walls, all adhering to FP-24 standard specifications. The estimated project value ranges between 2 million and 5 million dollars, with a tentative completion date of Fall 2027. This opportunity is a total small business set-aside, and awards will be made to the responsible bidder offering the most advantageous price. Bids must be submitted in sealed envelopes by 1400 local time on November 4, 2026, and must include a valid Standard Form 24 bid bond. Contractors are required to use the Masterworks web-based system for daily reports and measurement notes, and they must comply with specific restrictions prohibiting audio/video recording or AI note-taking during government meetings. The contractor is also responsible for securing all necessary permits for any material sites or sources they identify. Payment will be processed via Electronic Funds Transfer.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Solicitation # 69056726R000020
The project WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3, is a firm-fixed-price task order contract under a Multiple Award Task Order Contract (MATOC) for the Western Federal Lands Highway Division. Located 0.4 miles southwest of Mammoth, Wyoming, the project involves the reconstruction of a 0.7-mile roadway section and associated parking areas within Yellowstone National Park. The scope of work is comprehensive, including 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage and roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, and the installation of concrete curbs, gutters, striping, and signage. The estimated price range for the project is between 45 million and 55 million dollars, with a tentative completion date set for Fall 2028. The solicitation is structured around two primary bid schedules and one option. Schedule A focuses on mainline construction with a 22-foot typical pavement width and the reconstruction of the Norris Geyser Basin parking lot, while Schedule B specifies a 30-foot typical pavement width for the same areas. Option Z covers grading, base, pavement, major drainage, and the construction of a steel boardwalk at the Rustic Falls Boardwalk and the Osprey Pit Road Box Culvert. Only one of the two schedules will be awarded. The project is solicited to approved MATOC contractors, with the formal request for proposal anticipated in Winter 2026/2027. All work must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects for the FP-24 project area.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 237310
Federal
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Solicitation # 69056726R000019
Solicitation 69056726R000019 is a firm fixed-price task order request for proposals issued by the Federal Highway Administration Western Federal Lands Division for the Yellowstone Trail Road, Segment 1 project in Kootenai County, Idaho. Located in the Coeur d'Alene National Forest, the 0.20-mile project involves roadway realignment and reconstruction, the installation of a new single-span precast prestressed concrete structure, and rock-mass stabilization. The estimated price range for the work is between 2 million and 5 million dollars, with a tentative completion date in Fall 2027 and an assumed notice to proceed date of January 12, 2027. This is a restricted MATOC solicitation, meaning proposals will only be accepted from six specific prime contractors: ASCORP Inc (DBA Debco Construction), Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Award will be based on the best value, primarily focusing on the lowest price among responsible offerors. The project must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) and requires strict compliance with various Federal Acquisition Regulation clauses regarding labor standards, equal opportunity, and material workmanship.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads
Solicitation # 69056726B000011
The project AK NPS DENA 10(64) involves the reconstruction and paving of approximately 2.02 miles of roadway within the Riley Creek Campground in Denali National Park, Alaska. The scope of work includes the reconstruction of three campground loops to a width of 12 feet, paving of the frontage road and the USPS and mercantile parking lots, and the installation of a deep patch along the park road at mile post 14.8. Technical requirements encompass asphalt milling, roadway excavation, subgrade stabilization, the installation of Type 1 asphalt concrete pavement, and Method 2 aggregate base. The project also includes striping in accordance with the Manual on Uniform Traffic Control Devices, minor drainage improvements, and the removal and resetting of signs and trash receptacles. This full and open solicitation, numbered 69056726B000011, is managed by the Department of Transportation's Western Federal Lands Highway Division. The estimated price range is between 5 million and 10 million dollars, with a tentative solicitation date in fall 2026 or winter 2027 and a fixed completion date in fall 2027. A critical requirement for this contract is that all material sources must be certified free of noxious weeds and invasive plants by a federal, state, or local public agency, or through the North American Weed Free Forage Program. Prospective bidders are encouraged to conduct site visits during the fall before snow obstructs the area.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS