Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on April 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Multi-Family Window Replacement

Closed
RFP FY26-0861-13State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238150
New
SLED
Hillcrest Medical Center Renewal (HMCR) Hospital & CUP Wave 3 Subcontractor Bid Packages
Solicitation # 5551
The University of California, San Diego, through CM/Contractor DPR Construction, is soliciting bids for subcontractor packages for the Hillcrest Medical Center Renewal (HMCR) and Central Utility Plant (CUP) project in San Diego, California. The overall project scope involves the construction of a 700,000 to 850,000 square foot medical center featuring 300 licensed beds, a Level One Trauma Center, and surgical and imaging departments, as well as an approximately 20,000 square foot all-electric Central Utility Plant. The total estimated construction cost for the project ranges from 1.5 billion to 2 billion dollars, with specific Phase 2 subcontractor packages including unitized curtainwall estimated at 37 million dollars, structural steel at 65 million dollars, and elevators at 16 million dollars. The period of performance is scheduled from May 2026 through September 2028. This is a prevailing wage project with skilled and trained workforce requirements. All contractors and subcontractors must be registered with the Department of Industrial Relations (DIR) at the time of the bid and utilize the electronic certified payroll reporting system. There is a strong commitment to increasing the participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs), and bidders may be required to provide evidence of equal employment opportunity policies. Technical proposals are due by November 20, 2026, while the bid form, bid bond, and schedule of values must be submitted via Building Connected by December 9, 2026. Work must adhere to CSI Divisions 084400, 051200, and 140000.
University of California, San Diego

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 238150
New
SLED
CC-624-230-001 BCCC Exterior Window and Storefront Replacement at South Pavilion
Solicitation # BPM059062
Solicitation BPM059062, project number CC-624-230-001, is an Invitation for Bids issued by the Maryland Department of General Services for the exterior window and storefront replacement at the Baltimore City Community College South Pavilion. This firm fixed price construction project has a duration of 210 calendar days and is estimated to be valued between 1,000,000 and 2,500,000 dollars. The scope of work involves the installation of YKK systems across a 15,000 square foot building area, requiring strict adherence to AAMA 501.2 watertightness standards and ADA accessibility guidelines. Award will be based on the lowest total bid price, which includes the base bid, unit prices, allowances, and alternatives. The contract mandates several compliance and financial requirements, including a 10 percent Minority Business Enterprise goal and a 1 percent Veteran-Owned Small Business Enterprise goal. Bidders must provide bid bonds for projects exceeding 200,000 dollars, and the successful contractor will be required to furnish performance and payment bonds. Additionally, the contractor must comply with Maryland prevailing wage laws, certify the use of American-manufactured goods, and remit a 1 percent electronic transaction fee on all approved invoices. Performance is monitored through a series of field tests at 5, 50, and 90 percent completion milestones, with final acceptance contingent upon a successful punch list and final cleaning.
Department Of General Services

POSTED

1 day ago

DEADLINE

in 27 days

AI Contract Overview

Show more

This contract involves the comprehensive removal and replacement of windows in multi-family housing units within Arizona, with particular attention to historic preservation requirements. The contractor is responsible for providing all necessary labor, supervision, tools, materials, transportation, permit acquisition, disposal fees, and associated services to ensure completion in line with the project's detailed scope of work and specifications. Work must meet stringent performance criteria, including compliance with the 2021 IECC Climate Zone 2 standards for energy efficiency (e.g., U-factor ≤ 0.40 and SHGC ≤ 0.25), ASTM testing for air and water integrity and structural performance, and strict adherence to EPA Renovation, Repair, and Painting lead-safe rules. Furthermore, all installations require approval from the City's Historic Preservation Office, meeting the Secretary of the Interior’s Standards for Rehabilitation, ensuring that historic aspects are maintained throughout the project. The procurement is managed by the City of Phoenix Housing Department through a Request for Proposal (RFP FY26-0861-13) issued on April 16, 2026, with proposal submissions due by May 11, 2026. The award process follows a best-value trade-off basis, emphasizing a weighted evaluation where the contractor’s method of approach is most critical (accounting for 40% of the score), alongside qualifications, experience, and price. The contract expects continual performance during disputes unless legally prohibited and requires compliance with various statutory provisions including nondiscrimination, lawful presence verification, no participation in Israel boycotts, and prohibition of forced labor associated with Uyghurs. Shipping terms denote FOB destination with risk transfer upon City acceptance at delivery. Inspection and acceptance criteria are rigorous, with the City retaining oversight and rejection rights for nonconforming materials. Documentation and submittal requirements specify clear and concise proposals, uploaded electronically via the City’s procurement portal. While detailed contract clauses or FAR-style standardized clauses are not explicitly structured, relevant legal and ethical compliance is mandated along with strict packaging, labeling, and preservation protocols aligned with OSHA and local regulations.

General Info

Window replacement in Arizona multifamily units meeting historic, energy, and safety standards, City-managed contract.

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

8

Addendum to Solicitation - Extension of Offer Due Date

DOCX, High priority: read this first1 page · amendment
High

Final Park Lee - Roof and Carpentry Repair Keynotes

PDF, High priority: read this firstspecifications
High

FTA Federal Certifications March 2025

PDF, High priority: read this first10 pages · certifications
High

SAP Open Catalog Interface (OCI) Release 5.0 Documentation

PDF, High priority: read this first50 pages · specifications
High

Supplemental Terms and Conditions to All Airport Contracts REV. 9.2.25

PDF, High priority: read this first12 pages · contract-document
High

Acceptance of Offer Form 2026 - City of Phoenix

PDF, Low priority1 page · contract-document
Low

Sensitive Security Information Acknowledgement Form - City of Phoenix Aviation Department

DOCX, Low priority1 page · acknowledgement-form
Low

Multi-Family Window Replacement.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Housing
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA
Organization / AgencyArizona → Housing
Office AddressPHOENIX, AZ, 85003, USA
Contacts
Tonja LepurContract Specialist II

Full Description

Show more
The Contractor shall provide all supervision, labor, tools, equipment, materials, landfill/disposal fees, permits, transportation, and any associated services necessary to perform the work described in this document. This includes, but is not limited to, multi‑family window replacement, historic preservation activities, and any additional specified services. All work shall be completed in accordance with the terms, conditions, and specifications contained herein. Work frequency will be determined based on project needs and may include emergency or project‑related requirements

More opportunities from Arizona → Housing

Same awarding agency

NAICS: 561621
SLED
Emergency Call Systems Monitoring and Maintenance (TAL)
Solicitation # IFB FY27-086-08
The City of Phoenix Housing Department is soliciting offers under IFB FY27-086-08 for comprehensive monitoring and maintenance of emergency electronic call systems within senior housing units. The selected contractor will provide all labor, materials, and equipment necessary to ensure the continuous operational readiness of pull-cord emergency systems, maintaining compliance with ANSI/UL 1637 standards and ensuring a minimum four-hour standby battery capacity. The contract is awarded to responsive and responsible offerors based on technical capability, resource availability, safety records, performance history, and the proximity of their place of business to minimize transportation costs. The agreement begins on the commencement date for a specified term of X years with no options to extend. Key administrative requirements include obtaining police department security clearance for all personnel, adhering to strict OSHA and NFPA labeling for hazardous materials, and maintaining a written heat safety plan for outdoor work. Payments are generally processed within thirty to forty-five calendar days of a correct invoice, with a one-year limit on claims. Offerors must submit their responses via the OpenGov portal by November 13, 2026, including mandatory certifications regarding debarment, heat safety, and conflict of interest to avoid being deemed non-responsive.
Security Systems Services (except Locksmiths)

POSTED

11 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS