Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Municipal District of Taber - Request for Proposal - RFP EX202606 - 2026 Hays Sanitary Replacement

Closed
AB-2026-01755Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Municipal District of Taber is soliciting proposals from engineering professionals for the design, tender, and construction oversight of the Hays Sanitary Replacement project, which entails replacing approximately 715 meters of an aging 250mm vitrified clay sewer line. The existing pipeline runs beneath Highway 875 north of the Hamlet of Hays and continues parallel to the highway on a sewer right-of-way, partially crossing land owned by the Bow River Irrigation District (BRID). The project involves comprehensive preliminary engineering evaluations including trenchless replacement options, hydraulic modeling, geotechnical investigations, detailed surveys, and subsurface utility engineering to confirm utility locations and site conditions. Key design tasks include preparing plan and profile drawings, structural calculations for pipe loading under highway traffic, casing design if required, and developing a sewage management strategy that maintains live flow during construction. The scope also covers regulatory and stakeholder management, including obtaining necessary provincial permits, Alberta Transportation approvals, environmental compliance, and coordination for right-of-way agreements. Procurement support involves developing technical specifications for trenchless and open trench methods, plus evaluating contractor qualifications with a focus on experience handling vitrified clay pipe replacements and highway crossings. During construction, engineering oversight will include settlement monitoring to protect the highway surface, reviewing shop drawings, and producing detailed as-built records. The proponent is also encouraged to propose value engineering options that enhance project value without sacrificing functionality. Previous land access arrangements and seasonal scheduling considerations aim to minimize disruption to local agricultural operations. The response deadline for proposals is March 26, 2026, with the contracting authority listed as Craig Ambler.

General Info

Engineering design and oversight for 715m sanitary sewer replacement under Highway 875, including permits.

Agency

Government of Canada → Municipal District of Taber

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Municipal District of Taber
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Municipal District of Taber
Office AddressN/A
Contacts
Craig AmblerContracting Authority

Full Description

Show more
General Information The Municipal District of Taber (MD) is seeking competitive proposals from engineering professionals for the design, tender and construction of the Hays Sanitary Replacement project. The project involves the removal and replacement of approximately 715m of existing sewer line. The existing vitrified clay line crosses beneath ATEC HWY 875 north of the Hamlet of Hays then continues north parallel to the highway in a sewer ROW adjacent to the highway ROW. A section of the existing line east of the highway is located on Bow River Irrigation District Land (BRID). The anticipated scope of services is as follows but not limited to: 1. Preliminary Engineering & Feasibility • Alternative Analysis: Evaluate trenchless options specifically for replacement (e.g., Pipe Bursting vs. Slip-lining vs. Casing Bored/Jacked). • Hydraulic Modeling: A report and survey data from MPE, a division of Englobe can be provided for pipe sizing and hydraulic modeling purposes. • Geotechnical Investigation: An investigation was conducted on a portion of the site and will be provided which includes trenchless excavation methods for the highway crossing. Further investigation will be required for the remainder of the site. 2. Survey & Subsurface Utility Engineering • Topographic Survey: Survey of the highway surface at the crossing and drainage ditches, existing manholes and rim elevation data is to be provided. Confirmation of this data is recommended • High-intensity locating. Highway corridors in Alberta often contain "pushed" utilities that aren't always where the records say they are. 3. Design & Construction Documentation • Plan and Profile Drawings: Create detailed profiles showing the separation between the new sewer main and highway sub-grade/other utilities. • Casing Design: If required by Alberta Transportation, design a steel casing pipe including carrier pipe spacers and end seals. • Structural Calculations: Perform "Pipe Loading" calculations to ensure the new pipe material can withstand the CL-800 (or standard Alberta Highway) live loading. • Sewage management plan: Create a plan to ensure the adequate drainage of the sewer system. The sewer system must remain live as there is currently no bypass available. 4. Regulatory & Stakeholder Management • The successful proponent will be responsible for all provincial proximity permits and environmental compliance. • Alberta Transportation (AT) Approvals: * Submit the Utility Placement Permit application. o Ensure the design meets the Highway Guide Roadside Design Guide. • Environmental Protection: Draft the ECO Plan (Environmental Construction Operations) for provincial submission, focusing on spill prevention (for drill mud) and erosion control. • Right-of-Way (ROW) Agreements: Coordinate with Alberta Infrastructure or private landowners for temporary workspace (TWS) for the drill rig/bursting pits. The MD had previous agreements with BRID as well, these agreements can be renewed by the MD to ensure access is granted. 5. Procurement & Tender Support • Technical Specifications: Write specifications for the specific trenchless and trenched methods. • Bid Evaluation: Review contractor qualifications—specifically their experience with VCP fragmentation and highway crossings. 6. Construction Engineering & Inspection • Settlement Monitoring Plan: Design a monitoring program according to ATEC requirements to ensure the highway surface does not "heave" (from drilling pressure) or "settle" (from the bursting void). • Shop Drawing Review: Review submittals for the pipe, fusion logs, and shoring designs. • Record Drawings: Finalize "As-Built" drawings based on GPS data collected during the pull. 7. Value Engineering (deletable) • The successful proponent should provide additional information or services that may increase the value of the project without compromising the functional requirements of the project. Current Environment The pipe that is being proposed to replace is a 250mm vitrified clay pipe (VCP). This pipe has been observed to have cracks/fractures throughout with an inconsistent grade. The approximately 715 m replacement will be located on the existing pipeline between manholes 1K to 1P indicated on the map provided. The southernmost portion of the proposed project is on BRID land and travels through a fenced grassy area, and across a secondary highway (HWY 875). Then continues north parallel to the highway ROW and a BRID irrigation line. Land access was previously provided by BRID and private landowner to the west of the project. Considerations were previously made for fall construction to accommodate harvest and allow landowners pivot to be unobstructed by construction.