Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Museum of the Everglades Hurricane Ian Repairs

Closed
QQ-2026-077State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 712110
Grant
FY 2027 Teams Engaging Affiliated Museums and Informal Institutions (TEAM II) STEM Innovator
Solicitation # NNH27ZHA002C
The FY 2027 Teams Engaging Affiliated Museums and Informal Institutions (TEAM II) STEM Innovator program, solicitation NNH27ZHA002C, is a Notice of Funding Opportunity issued by NASA's Office of STEM Engagement. The program aims to establish informal education institutions, such as museums, libraries, and science centers, as regional hubs that connect youth in grades 5 through 12 to NASA missions and aerospace careers. With a total appropriated funding of 4,000,000 dollars, the program offers cooperative agreements lasting two to three years, with individual awards up to 250,000 dollars. Eligible lead organizations must be U.S.-based nonprofits registered in the System for Award Management with a Unique Entity Identifier. Proposals are evaluated based on intrinsic merit, relevance to NASA, and budget and cost, with no bonus points awarded for voluntary cost sharing. Key requirements include partnering with at least one regional or national STEM network and implementing at least two engagements aligned with NASA's technical work in areas such as space exploration, aeronautics, or Earth science. Applicants are strongly encouraged to partner with a NASA Center or facility. Submissions must be made electronically via NSPIRES by February 1, 2027, and must adhere to specific formatting guidelines, including a 4,000-character proposal summary. Notably, any proposals involving collaboration with China or Chinese-owned companies are ineligible for award.
Office Of Stem Engagement

POSTED

16 days ago

DEADLINE

in 3 months
NAICS: 712110
SLED
Oliver RanchDemae Rubins and Oliver Ranch, LLC have proposed a new Use Permit for the Oliver Ranch project located in Healdsburg, California. The proposal seeks authorization for various activities including daily invite-only tours of existing art installations for up to 50 visitors seven days a week from May through October, educational uses for up to 95 visitors five days a week, and up to 36 annual events for up to 150 people. Operational hours are set between 8:00 am and 9:00 pm for tours and educational activities, and between 11:00 am and 9:00 pm for larger events. To support these activities, the project will employ between 4 and 15 staff members depending on the scale of the use. Physical developments include the construction of new ADA-compliant pathways to access art installations, ADA-compliant parking, and a new 165-square-foot ADA-compliant restroom building. The project is being processed by Sonoma County under Permit Sonoma File No. UPE23-0014, with a proposed Mitigated Negative Declaration and Initial Study evaluating environmental impacts under CEQA. The study specifically addresses potential impacts on air quality and biological resources, while also noting potential fire evacuation concerns. Required authorizations from agencies such as the State Water Resources Control Board and the California Department of Fish and Wildlife are necessary for the project's progression. A public review period for the environmental documents is scheduled from late September through late October 2026, with a tentative public hearing set for November 5, 2026.
Sonoma County

POSTED

about 2 months ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract involves comprehensive storm damage repairs to the electrical system and insulation of the Museum of the Everglades, following Hurricane Ian. The work includes replacing approximately 250 linear feet of electrical conduit and wiring damaged by storm surge, both in the crawl space and within the building up to the next junction box above the water’s impact line. All damaged electrical components, including fixtures, outlets, and switches, are to be safely removed and replaced with new, code-compliant materials, ensuring secure and watertight installations. The contractor must verify measurements, perform all work to match existing systems, and test circuits for proper functionality, grounding, and safety standards. Additionally, the removal of storm-damaged foam insulation from parts of the building’s underside is required, with proper disposal and repair of any incidental damages. Throughout the project, the building must remain operational, necessitating careful coordination with the owner and museum staff. Temporary power solutions, including generators if needed, must be provided to support ongoing HVAC operations and critical equipment, especially during power shut-downs exceeding two hours. Noise mitigation measures should be implemented to minimize disturbance to neighboring properties. The contractor is responsible for obtaining all necessary permits, ensuring compliance with current codes, and managing the disposal of debris and damaged materials. This all-inclusive scope aims to restore the electrical infrastructure and insulation while maintaining the building’s functionality and safety standards during the repair process.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Cultural Heritage SpecialistOpen now, due in 28 days
  • Intent to Sole Source USCG Museum Fabrication Final OptionOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Collier County
Contacts1 person available
OfficeN/A

Full Description

Show more
Replace Building Electrical Replace approximately 250 LF of electrical system conduit and wiring in the crawl space under building and in the building up to the next junction box that was above the water’s impact line (storm surge). Replace in-kind all electrical wiring, conduit, hangers, and components that were damaged by storm surge underneath and inside the building up to the next junction box that was above the water’s impact line. Safely remove the damaged or deteriorated electrical system conduit and wiring from the crawl space, taking care to avoid damage to other building components or utilities. Disconnect and remove any electrical fixtures, outlets, switches, or devices connected to the existing conduit and wiring as necessary. Install approximately 250 LF of new conduit as PVC per CCVS, hangers, and wiring in the crawl space, and all components, routing them along designated pathways and securing them to structural elements or supports as needed per CCVS. Contractor is responsible to verify measurements/quantities and perform all work to match existing, meeting the latest codes and standards. Use appropriate fittings, connectors, and fasteners to ensure a secure and watertight installation of the conduit and wiring. Reconnect electrical fixtures, outlets, switches, and devices to the new conduit and wiring, ensuring proper alignment and secure attachment. Test each electrical circuit to verify proper functionality and continuity, addressing any issues or deficiencies as needed to ensure compliance with safety standards. Verify proper grounding, insulation, and circuit protection measures are in place to mitigate the risk of electrical hazards or malfunctions. Properly dispose of all removed materials and cleanup and dispose of any electrical materials under the building not needed that are remaining from the temporary repairs.Prepare application documents, submit for and obtain all permits as necessary.The existing building is to remain in operation during construction. This Contractor shall coordinate all work that will interfere with the present operation of the facility with the owner. Contractor shall provide temporary power to all equipment that must remain in operation during the work. If any work will impact the operation of the HVAC equipment serving the areas of the building for more than 2 hours, this Contractor must provide temporary power, supporting the facility with a generator, to those areas of the building to run the HVAC units properly and ensure that historical artifacts remain at the proper temperature. Contractor must coordinate any power shut downs closely with the County Project Manager and Museum staff. Temporary power shall be sized to handle all HVAC equipment serving the affected areas. Due to neighboring properties and the sensitive surrounding area, Contractor shall position generator (if required) and shield noise as best as possible not to cause noise disturbance. Contractor shall review the decibel limit and shield noise as required to meet code. ·       Remove Foam Insulation  Remove the existing foam insulation on the underside of the building. Fully remove all of the existing insulation which was damaged by storm surge, taking care to avoid damage to other building components, the building underside, or any utilities. Note that foam insulation to be removed does not cover the entire area of the building’s underside and only exists on part of the building’s underside. Restore/repair any damages if caused by removal of existing foam insulation. Properly dispose of all removed materials.The work is all inclusive

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS