MWWTP Utility Water Piping & Valve Replacement (UN 1181)

Closed
26-039State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

Documents

7

MWWTP Utility Water Piping & Valve Replacement ITB UN 1181

PDF, High priority: read this firstitb
High

MWWTP Utility Water Tunnel Piping Bid Drawings

PDF, High priority: read this firstbid-drawings
High

MWWTP Utility Water Tunnel Piping Specifications - Contract 21-19

PDF, High priority: read this firstspecifications
High

Sample Contract - Consecutive Number of Days Specified

PDF, High priority: read this first2 pages · contract-document
High

Master Permit DSP-250001 for Utility Water Piping Upgrade

PDF, Low prioritypermit
Low

Performance and Labor Bonds for Charles County ITB

PDF, Low priority2 pages · bond
Low

Project Close Out Documents - Charles County

PDF, Low priority7 pages · closeout-documents
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → DPW - Capital Project Management
Contacts2 people available
OfficeLa Plata, MD, 20646, USA
Office AddressLa Plata, MD, 20646, USA
Contacts
David StegerProject Manager
Dawn BrakeSenior Procurement Specialist

Interested Companies (17)

Fejes ConstructionLeonardtown, MD
Reliable ContractingGambrills, MD

See All 17 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Board of Commissioners for Charles County are hereby requesting sealed bids from qualified firms to replace and install utility water yard and tunnel piping, valves, hydrants, and appurtenances as shown on the Contract Documents, including replacement of approximately 540 linear feet (LF) of exposed piping and approximately. 26 underground valves throughout the Mattawoman Wastewater Treatment Plant.

More opportunities from Maryland → DPW - Capital Project Management

Same awarding agency

NAICS: 237110
New
SLED
Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)
Solicitation # 27-010
The Board of Commissioners for Charles County, Maryland, is soliciting bids for construction services to improve the Cobb Island and Hill Road sewage pump stations. The scope of work involves the demolition of existing mechanical and electrical equipment from the 1980s and the installation of new process mechanical piping, submersible pumps, HVAC, electrical and control systems, and interior coatings for wet wells and valve vaults. Additional requirements include the installation of new odor control systems, electrical and instrumentation canopies, and civil site work encompassing temporary bypass pumping, erosion and sediment control, final grading, and paving. Specific technical mandates include the use of Type 316 stainless steel for hardware inside manholes and wet wells, and compliance with NEC Class I, Division 1, Group C and D standards for hazardous locations. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of base bid items and contingency items. Bidders must provide a five percent bid bond and demonstrate technical competency through an experience form listing three similar projects. The project is subject to Maryland state law, prevailing wage requirements, and a 9.5 percent MWBE goal. Once awarded, the contractor must submit a schedule of values within ten days of the construction schedule. Payments are issued monthly, subject to a five percent deduction. The completed work is subject to a one-year warranty from the date of final acceptance, and the contractor must provide performance and labor bonds to guarantee fulfillment of the contract.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
SLED
MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)
Solicitation # 27-002
The Mattawoman Wastewater Treatment Plant (MWWTP) in Charles County, Maryland, requires turn-key design-build services to manage transient surges in its effluent force main. Following a project that increased the effluent pump station's design peak flow to 60 mgd, the County is concerned that cyclical pump operations and trips may damage the 50-year-old, 54-inch diameter prestressed concrete cylinder pipe and the existing air release valve. The project involves the design and construction of a new 40-foot diameter welded steel standpipe with separate influent and effluent pipes, a welded steel roof cover, and associated infrastructure including foundations, safety cages, and internal ladders. The scope of work includes performing hydraulic modeling using Bentley HAMMER software to simulate various pump trip events and ensuring all work complies with local, state, and federal codes. The project timeline allows up to 270 consecutive calendar days for the design and permitting phase, with construction starting within 270 days of the Notice to Proceed and reaching substantial completion within 420 days of the construction start date. Award will be based on a combination of the offeror's experience, qualifications, and proposed price, rather than cost alone. Contractual requirements include a five percent bid bond, performance and labor and material bonds for 100 percent of the contract price, and professional liability insurance with a minimum limit of 2 million dollars per occurrence and aggregate. The selected design-builder must provide a one-year guarantee on the structure and equipment from the date of substantial completion. All labor must adhere to prevailing wage requirements, and accessible elements must meet ADA standards. Proposals are submitted electronically via the County's eProcurement Portal, with a final submission deadline of November 29, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 11 days
View Details
NAICS: 236220
SLED
Charles County VanGo Maintenance Facility Construction
Solicitation # 27-012
The Board of Commissioners for Charles County is soliciting bids for the turnkey construction of the VanGo Transit Operations and Maintenance Facility in Waldorf, Maryland. Located on a 6.72-acre site, the project involves the complete construction, testing, commissioning, and turnover of an approximately 180,000-square-foot facility designed to support 50 transit buses. The scope of work includes 20,000 square feet of administration and maintenance space, 82,000 square feet of commuter-bus parking, bus and chassis wash facilities, fueling islands, fare-collection facilities, and comprehensive site improvements including grading, drainage, and utility installation. The project is funded in part by Federal and State transit funds administered through the Maryland Transit Administration. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of base bid and contingency items. The successful contractor must complete all work within 547 consecutive calendar days from the Notice to Proceed. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America standards, and 2010 ADA Standards for Accessible Design. Bidders are required to provide a 5% bid bond and must submit all proposals electronically via the County's eProcurement Portal. Performance and labor bonds are required to ensure contract fulfillment and payment for materials and labor.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
SLED
On-Call Maintenance, Repair and Upgrade of Utilities Infrastructure
Solicitation # 27-008
The Board of Commissioners for Charles County is soliciting bids for a Task Order Contract to provide on-call construction services for the maintenance, repair, and upgrade of utilities infrastructure, primarily supporting the Department of Public Works. The scope of work includes the removal and reinstallation of various sewage pumps, maintenance of electrical and mechanical equipment, welding, fabrication, and the rehabilitation of water, sewer, and reclaimed water piping systems, including valves, vaults, and manholes. The contract also covers general excavation, site work, and water well repairs. Each contract has a maximum price of 500,000 dollars, though the County may authorize tasks exceeding this amount with prior written approval. The base period begins upon execution and ends on December 31, 2027, with four optional one-year renewals. Award will be granted to the lowest responsive and responsible bidder who has been actively engaged in the field for at least ten years and is in good standing with the State of Maryland. Bidders must submit a 25,000 dollar bid bond and comply with MWBE program requirements for applicable task orders. Performance and payment bonds of 100 percent of the job order price may be required. Contractors are expected to provide monthly invoicing, subject to a 5 percent retainage, and must adhere to prevailing wage laws and strict safety and environmental codes. Final acceptance of work is contingent upon inspection by the Contracting Officer to ensure all services are performed in a skillful and workmanlike manner.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS