This Solicitation opportunity from Department Of Homeland Security was posted on April 5, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nationwide Tower/Antenna Multiple Award Construction IDIQ Contract (TMACC)

Closed
70Z08822RESDV0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
City of Piqua

POSTED

about 22 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
Refurbishment Of Existing On Load Tap Changer At Adobe Creek Substation - AC21
Solicitation # RFQ199445
The City of Palo Alto Utilities Department is soliciting quotes under RFQ199445 for the refurbishment of an existing on-load tap changer (OLTC) at the Adobe Creek Electric Substation (AC-21). The project specifically requires the replacement of the TLH-21 LTC on an Allis Chalmers 15MVA transformer with a certified re-manufactured component. The scope of work includes draining and processing transformer oil, filling the LTC tank with 760 gallons of new oil, re-sealing the barrier board and pass-through studs, and replacing valves and gaskets on six radiators along with the 60KV SMD fuse holder. Comprehensive preliminary and post-work testing, including Power Factor, TTR, and DGA/oil quality testing, is mandatory. The City has standardized its requirements for the Allis Chalmers TLH-21 and will not accept alternate materials or equivalent products. Eligible bidders must hold a valid California Class A license and be registered with the DIR. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. As a public works project, it is subject to California prevailing wage laws and requires the contractor to provide performance and payment surety bonds totaling at least 100 percent of the contract value. Additionally, contractors must meet strict insurance requirements, including general liability and worker's compensation, and comply with the City's Environmental Purchasing Policy. Bids must be submitted electronically via the OpenGov portal by November 3, 2026.
Utilities

POSTED

1 day ago

DEADLINE

in 14 days

General Info

Contract Value

$1

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

CA, USA

Set-Aside

SBA

Award Issued Date

Documents

41

15261 CAMS Tower Final Report / Material Approval Submittal

PDF, High priority: read this first24 pages · sow
High

70Z08822RESDV0001 - Request for Proposal

PDF, High priority: read this first105 pages · rfp
High

70Z08822RESDV0001 Scope of Services – Tower Inspection/Maintenance

PDF, High priority: read this first23 pages · sow
High

Amendment 0001 – 70Z08822RESDV0001 Nationwide Tower/Antenna TMACC

PDF, High priority: read this first5 pages · amendment
High

Amendment 0002 – RFP 70Z08822RESDV0001

PDF, High priority: read this first3 pages · amendment
High

Amendment 0003 - 70Z08822RESDV0001

PDF, High priority: read this first3 pages · amendment
High

Amendment 0004 - RFP 70Z08822RESDV0001

PDF, High priority: read this first2 pages · amendment
High

Appendix A Seed Project - USCG District 11 Towers

PDF, High priority: read this first5 pages · sow
High

Appendix A - Seed Project USCG District 13 Towers

PDF, High priority: read this first4 pages · sow
High

Attachment J.1 Experience Overview Sheet

DOCX, High priority: read this first2 pages · sow
High

Commandant Notice 6260 - CH-1 to Asbestos Exposure Control Manual

PDF, High priority: read this first43 pages · amendment
High

Eastern Indigo Snake Standard Protection Measures (Aug 12, 2013)

PDF, High priority: read this first3 pages · sow
High

HSCG88-17-D-PMV090 016R2 Material Approval Submittal and Tower Report

PDF, High priority: read this first25 pages · material-approval-submittal
High

Sea Turtle and Smalltooth Sawfish Construction Conditions

PDF, High priority: read this first1 page · specifications
High

Solicitation 70Z08822RESDV0001 - Contractor's Request for Clarification

PDF, High priority: read this first1 page · q-and-a
High

Standard Manatee Conditions for In-Water Work (2011)

PDF, High priority: read this first2 pages · specifications
High

HSCG88-17-D-PMV090 015R2 Material Approval Submittal / Tower 55' Final Report

PDF, Medium priority26 pages · submittal
Medium

44217 CAMS Tower Fort Stevens Final Report / Material Approval Submittal

PDF, Low priority27 pages · other
Low

70118 CAMS Tower (TX #25) Final Report and Material Approval Submittal

PDF, Low priority19 pages · other
Low

70118 CAMS Tower (TX #25) Final Report / Material Approval Submittal

PDF, Low priority19 pages · other
Low

A001 12 847597 TOWER 65 SST Multiple Raised Platforms

PDF, Low priorityother
Low

Attachment J.2 Experience Information Form

DOCX, Low priority3 pages · other
Low

CAMS Tower Fort Stevens Final Report / Material Approval Submittal

PDF, Low priority27 pages · other
Low

CAMS Tower (TCI VOBA #3) Material Approval Submittal / Maintenance Report

PDF, Low priority20 pages · other
Low

COMDTINST M11000.4A Tower Manual

PDF, Low prioritymanual
Low

COMDTINST M5100.47A Safety and Environmental Health Manual

PDF, Low priority311 pages · manual
Low

Gopher Tortoise Permitting Guidelines (Revised April 2013)

PDF, Low priority133 pages · guidelines
Low

HSCG88-17-D-PMV090 / 009R3 Material Approval Submittal

PDF, Low priority21 pages · other
Low

HSCG88-17-D-PMV090 010R3 Material Approval Submittal

PDF, Low priority22 pages · other
Low

HSCG88-17-D-PMV090 013R1 Material Approval Submittal

PDF, Low priority36 pages · other
Low

HSCG88-17-D-PMV090 014R2 Material Approval Submittal

PDF, Low priority22 pages · other
Low

HSCG88-17-D-PMV090 019R2 Material Approval Submittal / Tower Report

PDF, Low priority34 pages · contract-document
Low

HSCG88-17-D-PMV090 Material Approval Submittal / Tower Maintenance Report

PDF, Low priority23 pages · other
Low

J.3 Past Performance Questionnaire (PPQ)

DOCX, Low priority5 pages · past-performance
Low

MT. Diablo 65-ft Self-Supporting Tower Structural Analysis Report

PDF, Low priority37 pages · other
Low

R21 Cambria Tower Inspection Report, July 28, 2016

PDF, Low priority18 pages · other
Low

R21 Mt Jenner Tower Inspection Report FY16

PDF, Low priority18 pages · other
Low

R21 Tower San Onofre Peak Maintenance Report

PDF, Low priority7 pages · other
Low

TOWER 65 SST Multiple Raised Platforms

PDF, Low priorityother
Low

1.10.1_DBA_Wage+Determination_Seed+Project.zip

ZIP

J.5_USCG+District+Map.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

12 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 21, 2022 to Jun 30, 2022.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Ceu OAKLAND(00088)
Contacts2 people available
OfficeOAKLAND, CA, 94612, USA
Office AddressOAKLAND, CA, 94612, USA

Full Description

Show more
This announcement constitutes the only solicitation. The solicitation number is 70Z08822RESDV0001. The solicitation is issued as a Request for Proposal (RFP) and the solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2022-04. The North American Industry Classification System (NAICS) for this acquisition is 237130 Power and Communication Line and Related Structures. The size standard is $39.5 million. The purpose of this contract solicitation is to solicit a Tower/Antenna Multiple-Award Construction Contract (TMACC). The TMACC contracts will meet a majority of the USCG tower and antenna construction, maintenance, rehabilitation, demolition, inspection, and repairs with a value below $3M within the 50 United States and its territories. Initial contracts will be competitively solicited and awarded nationally. Task orders will range from a minimum task order value of $3,500 dollars to a maximum task order value of $3 million dollars. Orders will be solicited on a competitive basis among the TMACC firms unless an authorized exception applies. The contracts offer a streamlined approach to construction contracting and ongoing competition between qualified contractors. Awards will be restricted to small business set-aside firms. All qualified small business firms can compete. The U.S. Coast Guard intends to award up to seven (7) Indefinite Delivery Indefinite Quantity (IDIQ) Nationwide Tower/Antenna Multiple Award Construction Contracts (TMACCs). The terms and ordering procedures of each contract will be uniform among the IDIQ contracts and consistent with ordering procedures in FAR 16.505. Each of the IDIQ contracts will include a base year plus four one-year options (five-year total). Task order limits will range from $3,500 to a maximum task order value of $3 million. The minimum guarantee for each individual contract will be $1,000. The anticipated aggregate capacity for the seven new national TMACC contracts is $24.9 million dollars. Contract awardees will be eligible to compete for TMACC task orders at various USCG Districts in locations nationwide. A map of the Coast Guard Districts has been provided below. Ordering authority will be available to any United States Coast Guard component with appropriate warrant authority. However, task orders will primarily be awarded and administered by the Coast Guard's Civil Engineering Units (CEUs). The contract awardees under this procurement shall be able to provide all necessary personnel, facilities, equipment, and materials for multiple and concurrent task orders across the United States and its territories. Firms shall ensure that all activities performed by its personnel, subcontractors and suppliers are executed as required in compliance with all applicable environmental and safety laws and regulations and will meet all relevant, appropriate, and applicable standards. Specific requirements will be detailed in each task order general requirements, specifications, and drawings. The description of these requirements will vary for each Task Order dependent upon the needs of the requiring entity. In order to be selected for award, offerors will be required to submit an electronic proposal consistent with the requirements of Section L of the solicitation. It is the offerors responsibility to insure their proposal meets all of the requirements stated in Section L of the solicitation. Failure to provide all necessary information may result in a proposal being rejected or not receiving full consideration since the Government reserves the right to award a contract based upon initial proposals and without negotiations. As stated in Section M of this solicitation, the Government intends to award a maximum of seven contracts, but reserves the right to adjust the number of contract awards or make no award at all. The Government intends to make multiple awards of this tower multiple-award construction contracts for one base year with four one-year option periods. Consistent with FAR 15.305(a) (2) past performance will be an important part of the evaluation. Offerors shall be provided the opportunity to identify past or current contracts for efforts similar to the Government requirements. Offerors should provide the submission of information as required by Section L.11 -Electronic Proposal Submission in DoD SAFE. Please carefully review all attachments. Request for Clarification can be submitted to Contracting Officer, Travis Cohen, at (510) 637-5589, email: Travis.Cohen@uscg.mil and Contract Specialist, Denver Johnson, at (510) 637-5588, email: Denver.L.Johnson@uscg.mil. Request for Clarification should be submitted using form provided, Appendix J.4 Contractor's pre-proposal inquiry form. Submitted Proposals must include the following information- One (1) completed copy of the SF 1442 (RFP Section A) and signed copies of all amendments. RFP-Section B, Schedule of Prices (see submission instruction in Section L PART I - PRICE PROPOSAL) RFP- Section K, Reps and Certs (note highlighted sections) RFP- Section L PART I - PRICE PROPOSAL; PART II - TECHNICAL/ RELEVANT EXPERIENCE/ PAST PERFORMANCE/ SEED PROJECT TECHNICAL APPROACH; PART III ADDITIONAL REQUIRMENTS. SPECIAL PROPOSAL SUBMISSION INSTRUCTIONS DUE TO COVID-19 Due to continued public health concerns and delivery delays arising in response to COVID-19, USCG CEU Oakland will NOT accept Proposals by mail, hand-carry, or commercial courier (that is, no physical Proposals will be accepted in response to this solicitation). All Proposals must be submitted by electronic commerce only (that is, by submission through DoD SAFE). Proposal Submission Due to the current COVID-19 pandemic, all proposals shall be submitted electronically through the DoD SAFE website (https://safe.apps.mil/). Offerors are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If an offeror attempts to transmit a large number of files, recommend that combining or ZIP files before uploading to the DoD SAFE website. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission. It is Offerors responsibility to check with DoD SAFE to ensure successful submission. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided. Accordingly, CEU Oakland will NOT accept proposals by mail, hand-carry, or commercial courier (that is, no physical proposals will be accepted in response to this solicitation). All proposals must be submitted by electronic commerce only (that is, by submission through DoD SAFE, as discussed below, only). The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided below. Electronic Proposal Submission in DoD SAFE In accordance with (IAW) FAR 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF PROPOSALS, all proposals must be received at the initial point of entry to the Government infrastructure not later than 17:00 p.m. Pacific Daylight Time (PDT) on June 20, 2022. Proposals will be submitted through DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). DoD SAFE is the Government infrastructure utilized to secure proposal proposals and IAW FAR 14.202-8, citing FAR 4.5. All proposals must be uploaded into DoD SAFE infrastructure not earlier than June 15, 2022 and not later than (NLT) June 20, 2022, at 17:00 p.m. Pacific Daylight Time (PDT). To submit an Electronic Proposal Package through the DoD SAFE website, Offerors shall follow the following steps: Step 1: Send an Email no less than 24-hours prior to the closing date and time stated for receipt of Proposals to Denver Johnson at Denver.l.Johnson@uscg.mil requesting a secure link to upload your Proposal Package to the DoD SAFE website (https://safe.apps.mil/). Step 2: Prospective Offerors who timely submit a request will receive an automated email containing a link that will take the Offerors to the DoD SAFE website where the file can be uploaded. Step 3: Prospective Offerors shall follow the instructions on the linked webpage to upload the Proposal Package file. There is an optional note section that will be included in the email to the recipient selected. The recipient will receive an automated email containing any note entered and instructions for downloading the file. The electronic proposal submittal contents shall conform to the details of the solicitation and subsequent amendments. Receipt of Submissions For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded in the DoD SAFE website. For proposals larger than the 2GB capacity of the DoD SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the DoD SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The electronic proposal submittal contents shall conform to the details of the solicitation and subsequent amendments. ADD THE FOLLOWING TO DESCRIPTION CONTRACT AWARDS: 70Z08823OAKL0001 - Long Wave, 1111 N Lee Ave, Oklahoma City, OK 73103 Z0Z08823OAKL0002 - SiteMaster Inc, 6914 S Yorktown Ave #210, Tulsa, OK 74136 70Z08823OAKL0003 - Northern Pride Communications Inc., 20 Center Park Rd, Topsham, ME 04086 70Z08823OAKL0004 - Semper Tek Inc, 848 Nandino Blvd., suite 0, Lexington KY 40511 70Z08823OAKL0005 - Pyros Communications, 9365 industrial TRCE, Alpharetta GA, 30004

More opportunities from Department Of Homeland Security → Ceu OAKLAND(00088)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS