Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 25, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PBA Substation Repair

Closed
W519TC23B2001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments
Solicitation # REQ00003176
The City of Garland is soliciting bids for a term agreement under solicitation REQ00003176 to provide fiber optic maintenance, repair, and modernization services for its IT, Transportation, and Water Departments. The contract consists of an initial twelve-month term with four optional twelve-month renewal periods. The City intends to award the contract to the two highest-ranked respondents, designating one as the primary contractor and the other as the secondary contractor to ensure redundancy and emergency response capacity. Award decisions are based on best value, evaluated through overall qualifications, client references, and relevant project examples. The scope of work requires the contractor to provide all labor, materials, and equipment for installation, troubleshooting, and emergency repairs of critical infrastructure, including public safety and SCADA systems. Critical priority outages require a two-hour response time. Deliverables include schematic diagrams, OTDR test files, and as-built drawings, with a minimum two-year workmanship warranty required for all services. Bidders must submit comprehensive bids on all items to be considered responsive, adhering to Texas Government Code Chapter 2258 for prevailing wage rates. Materials are to be billed at actual cost plus a markup not exceeding 10 percent. All submissions must be made electronically via the IonWave portal by November 5, 2026.
City Of Garland

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
SLED
North State And Hwy 101 Utility Infrastructure Boring Project
Solicitation # 26-02
The City of Ukiah, Department of Electric Utility, is soliciting bids for the North State and Hwy 101 Utility Infrastructure Boring Project (Solicitation #26-02). This project involves the installation of utility infrastructure through horizontal directional drilling (HDD) and trenching at North State Street and Highway 101 in Ukiah, California. The scope of work includes 1,375 linear feet of HDD and 142 linear feet of trenching, backfilling, and compaction. Key deliverables include the installation of various HDPE and PVC conduits ranging from 1.25 to 6 inches and the installation of six fiber service vaults. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Eligible bidders must possess a valid State of California Class A Contractor's License and be registered with the Department of Industrial Relations. Submission requirements include a detailed proposal with unit pricing, a Fair Employment Practices Certification, a notarized Non-Collusion Affidavit, and a statement of experience. Bids must be accompanied by a 10 percent bid security. Upon award, the contractor is required to provide a performance bond for 100 percent of the total contract price, as well as a payment bond and appropriate insurance certificates. The City will provide engineering personnel for inspections, and the contractor is responsible for ensuring all materials are stored to preserve quality and fitness for the work. The response deadline for this solicitation is December 1, 2026.
City of Ukiah

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Broadband Implementation Project - FFA
Solicitation # 2001063
The Broadband Implementation Project - FFA, solicitation number 2001063, is a comprehensive infrastructure initiative for the City of San Luis Obispo, California. The project involves the installation of aerial and underground fiber optics, including directional boring for conduit, deep bore casing, and the installation of 288 CT fiber cable. The scope of work encompasses the placement of various sized vaults, copper clad ground rods, pole risers, down guys, anchors, and new wooden poles, as well as cut and kick operations for existing poles. Additional requirements include potholing, tree trimming, public notification, and strict compliance with CPUC grant reporting and archaeological monitoring. The project is structured with a base bid and five additive alternates covering specific street segments, with award decisions based on a total project bid hierarchy capped at 2,400,000 dollars. Contractors must adhere to stringent technical and regulatory standards, including CPUC General Order 95, Caltrans 2024 specifications, and the City of San Luis Obispo 2025 Engineering Standards. Key requirements include the submission of OTDR bi-directional testing results prior to acceptance and the employment of directional drilling personnel with at least two years of experience. Bidders must provide a bid guaranty of 10 percent of the bid amount and, upon award, provide performance and payment bonds equal to 100 percent of the contract price. Compliance with California Labor Code is mandatory, requiring registration with the Department of Industrial Relations and adherence to prevailing wage laws. Sealed bids are due by 11:00 a.m. on November 19, 2026, to the Public Works Administration Office in San Luis Obispo.
City of San Luis Obispo

POSTED

about 16 hours ago

DEADLINE

in 30 days
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The scope of work includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire line, and the use of both contractor-furnished materials and owner-furnished self-supporting steel poles. The project has an engineer's estimate of $1,900,000 and requires adherence to the National Electrical Safety Code and various ASTM standards for ductile iron poles and fiberglass crossarms. Bidders must provide evidence of financial and performance experience and are required to submit a bid bond of at least 10% of the total bid amount. The successful contractor must post a combined performance and payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications is mandatory. Bids must be submitted via Bid Express, email, or sealed hard copy by October 29, 2026. All equipment must be delivered FOB Destination to the City of Piqua, and any bids specifying FOB Factory will be rejected.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and bus support structures. The contractor is responsible for comprehensive site work, including minor clearing, excavation, structural fill, grounding for all equipment, and the installation of above-ground conduits. The project also requires assistance with the start-up and commissioning of all mechanical, electrical, and electronic systems. Bidders must adhere to strict compliance standards, including State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications. A bid bond of no less than 10 percent is required, and the successful contractor must provide performance and payment bonds equal to the full contract price. Award selection will be based on a comparison of relative merits and the lowest and best bid. Technical execution must follow NESC, NEC, IEEE, and ANSI standards, with specific quality controls for concrete foundations and equipment shipment integrity. Performance penalties of $500 per calendar day apply for deliveries exceeding the designated completion date.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days

General Info

Contract Value

$650,636.34

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

IL

Set-Aside

NONE

Award Issued Date

Documents

11

A03.++CDRL+001+-+Contractor+Manpower+Reporting.pdf

PDF

A03.++CDRL+002+-+AT+Level+1+Training+Certificates.pdf

PDF

A03.++CDRL+003+-+iWatch+Training+Certificates.pdf

PDF

A03.++CDRL+004+-+Names+and+Personnel+Data.pdf

PDF

A03.++CDRL+005+-+Contractor+Manpower+Reporting.pdf

PDF

A03.++CDRL+006+-+Submittals.pdf

PDF

Attachment+001+-+Statement+of+Work.docx

DOCX

Attachment+002+-+Davis+Bacon+Wage+Rate+Determination.pdf

PDF

B08.+W519TC-23-B-2001+0001.pdf

PDF

B08.+W519TC-23-B-2001+0002.pdf

PDF

B08.+W519TC-23-B-2001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
Contacts2 people available
OfficeROCK ISLAND, IL, 61299-0000, USA
Office AddressROCK ISLAND, IL, 61299-0000, USA

Full Description

Show more
NARRATIVE AMENDMENT 0002 1. The purpose of Amendment 0002 of solicitation W519TC23B2001 is to answer questions from the site visit. The questions and answers are as follows; Q1. Do we need to include in our price, engineering for the most reliable point for the 3 new Voltage Regulators in Substation B? During the walk thru it was mentioned the best place might have been out on a circuit rather than inside the substation, this would require a professional load study. A1. Cost needs to be included in the bid. This would include - engineering for the most reliable point for the 3 new Voltage Regulators in Substation B. Q2. Does the replacement of the first pole on the load side of Entergy's Primary Meter Pole in substation B need to be included in our quote? The pole appeared to be in poor condition during our walk through and replacing it was mentioned, but this is not in the original quote. A2. The first pole on the load side on Entergy's primary meter pole needs to be replaced. Q3. The existing 3 Phase Voltage Regulator in Substation B is a 1500 KVA, the SOW says use three 333 kva regulators, that will not have as much ampacity as the 1500 kva, just making sure this is acceptable. A3. The contractor will utilize an engineering firm to determine the correct sizing and best location for voltage regulators to meet PBA's usage and needs. PBA will review engineering firm recommendations to determine if they are acceptable for PBA's usage and needs. Q4. Please provide a satellite image of the Substations B and C that will be repaired. A4. The satellite images will be provided to those who request the images 2. All other terms and conditions of this solicitation remain in effect NARRATIVE AMENDMENT 0001 1. The purpose of Amendment P0001 of Solicitation W519TC-23-B-2001 is to change the timeline to be as follows: Solicitation issued: 22 December 2022 Deadline for Registering for Site Visit - 12 January 2023 @ 1:00 PM CT Site Visit - 18 January 2023 @ 9:00 AM CT Questions from Site Visit due by - 20 January 2023 @ 4:00 PM CT Technical Proposals (Step-One) Closes - 3 February 2023 @ 1:00 PM CT Price Bid (Step-Two) Closes - 24 February 2023 @ 1:00 PM CT Bid Opening via Microsoft Teams Teleconference - 28 February 2023 9:00 AM CT 2. All other terms and conditions of this solicitation remain unchanged. NARRATIVE 1. The U.S. Army Contracting Command - Rock Island (ACC-RI) issues Invitation for Bid (IFB) W519TC-23-B- 2001 for the repair of two substations (Substation - B and Substation - C) located at Pine Bluff Arsenal in Pine Bluff, Arkansas. All work shall be completed in accordance with Attachment 0001 - Scope of Work (SOW). 2. This IFB is issued as a Women-Owned Small Business (WOSB) Eligible Under WOSB Program Set Aside. It is anticipated that a single Firm Fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder whose bid represents the lowest priced, technically acceptable bid. This IFB is issued using the Two-Step Sealed Bidding Method. See Section 00 21 13 - Instructions to Bidders within this solicitation for the Technical Requirements and Evaluation Criteria for Step-One. 3. A pre-construction site visit is scheduled for 9:00 AM CT on 04 January 2023. All interested contractors are encouraged to attend the site visit. See SITE VISIT INFORMATION for more information. USG will not answer any questions at the site visit. Contractor questions regarding solicitation and work solicited in the SOW are due to the POCs listed below no later than COB 06 January 2023 in order to assure that all Contractor questions can be answered and posted for all Contractors knowledge prior to the closing of Step-One, Technical Proposal. 4. Technical proposals (Step-One) shall not include prices or pricing information. Technical proposals are due by 1:00 PM CT on 20 January 2023, and shall be emailed to the following POCs: Jadwiga Baranowski at jadwiga.b.baranowski.civ@army.mil John Fotos at john.g.fotos.civ@army.mil 5. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder's own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal's acceptability solely on the basis of the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder; however, the Government may request additional information from bidders that it considers reasonably susceptible of being made acceptable, and may discuss bids with the prospective bidders. 6. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. 7. Bidders are cautioned to ensure their Step-Two bids are fully complete, including all fill-ins. Any bidder submitting a bid agrees by submission that their bid and the prices contained therein will be valid for 60 days after receipt of bids. 8. Bids from eligible bidders are due 2:00 PM CT on 10 February 2023 (Step-Two). Contractor bid submission shall be emailed to: Jadwiga Baranowski at jadwiga.b.baranowski.civ@army.mil John Fotos at john.g.fotos.civ@army.mil The Bid Opening will take place at 9:00 AM CT on 14 February 2023. See Bid Opening for more details. 9. The prevailing Davis-Bacon Act for wage determination will be incorporated into the resultant contract and will be in effect for the entire performance period of the resultant contract. The most recent wage determination can be found online at https://www.wdol.gov/dba.aspx or see Attachment 0002 - Davis Bacon Wage Determination. If the wage determination is revised during the period of performance, it shall be provided to the contractor through modification to the resultant contract. 10. Timeline: Solicitation issued: 22 December 2022 Deadline for Registering for Site Visit - 29 December 2022 @ 1:00 PM CT Site Visit - 04 January 2023 @ 9:00 AM CT Questions from Site Visit due by - 06 January 2023 @ 4:00 PM CT Technical Proposals (Step-One) Closes - 20 January 2023 @ 1:00 PM CT Price Bid (Step-Two) Closes - 10 February 2023 @ 1:00 PM CT Bid Opening via Microsoft Teams Teleconference-14 February 2023 9:00 AM CT 11. This executive summary is provided as an administrative convenience and is not intended to alter the terms and conditions of the IFB in any way. Any inconsistencies between this executive summary and other IFB provisions shall be resolved in favor of the other IFB provisions. 12. The POCs for this IFB are Jadwiga Baranowski, Contract Specialist at jadwiga.b.baranowski.civ@army.mil and John Fotos, Contracting Officer at john.g.fotos.civ@army.mil

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 541380
New
Federal
Granite Surface Plate Calibration and lapping - updated Docs
Solicitation # W519TC27QA007
Solicitation W519TC27QA007, issued by the Army Contracting Command - Rock Island, seeks an ISO 17025 accredited vendor to provide annual inspection, calibration, and lapping/repair of granite surface plates at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. This Firm Fixed Price contract consists of a base year running from February 2, 2027, to February 1, 2028, with four subsequent one-year option periods. All work must adhere to ASME B89.3.7 for flatness and ANSI Z-540-1 standards traceable to NIST. Key deliverables include the application of calibration stickers to each plate and the submission of a Service Acceptance Report within three business days of completion. To be considered, vendors must submit their proposals by November 9, 2026, including proposed fixed prices for all periods, documentation of technical capability, and a signed concurrence of the Scope of Work. Personnel requiring installation access must complete AT Level I awareness training and comply with strict security mandates, including CAC requirements and iWATCH briefings. Award evaluation is based on price and technical capability. Contract administration will be managed through the Wide Area WorkFlow system for invoicing, and performance will be monitored via a 100 percent inspection surveillance method as outlined in the Quality Assurance Surveillance Plan.
Testing Laboratories and Services

POSTED

about 10 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541612
New
Federal
DRAFT RFPs – Human Resource Solutions, GEN VI IDIQ Contracts
Solicitation # W519TC-26-R-AHRS
The Army Contracting Command - Rock Island is seeking industry feedback on draft Requests for Proposals for the Sixth Generation (GEN VI) Human Resource Solutions multiple-award IDIQ contract suites. This procurement is divided into two primary components: Personnel Lifecycle Support (PLS) and Recruiting Management Administrative Support (RMAS). The PLS suite has a total estimated cumulative ceiling value of approximately 6.09 billion dollars, while the RMAS suite is estimated at approximately 1.52 billion dollars. Both contracts are structured as 10-year IDIQs, consisting of a five-year base period and a five-year option period. This is a 100 percent small business set-aside, with a minimum of 10 awards reserved specifically for small business offerors. The scope of work involves providing enterprise-level human resource knowledge-based services, training, manpower forecasting, and administrative support for the Department of Defense and other federal agencies. Evaluation for the base IDIQ awards will be based on acceptability factors, specifically Technical capability and Past Performance, with Corporate Experience being the most significant technical subfactor. Price will not be evaluated for the initial IDIQ award but will be used for subsequent task order awards. Proposals must be submitted electronically via the PIEE suite, and awardees will be required to maintain specific security clearances and adhere to strict quality control and reporting standards.
Human Resources Consulting Services

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS