New Terminal One (NT1) Solar Photovoltaic System

Closed
413946FCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

22 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The San Diego County Regional Airport Authority is seeking proposals from qualified contractors to develop a comprehensive solar photovoltaic (PV) system at San Diego International Airport under a power purchase agreement (PPA). The project involves two adjacent roof-mounted solar systems on the New Terminal One (NT1), each designed to generate at least 1.7 MW DC of electricity, totaling a minimum of 3.4 MW DC. The first system, located on the eastern half of NT1 (Phase 1A), and the second on the western half (Phase 1B), will be designed, fabricated, delivered, installed, operated, and maintained by the selected Respondent. The Authority intends to enter into a 20-year agreement to purchase the power produced, with the contractor responsible for all aspects of system deployment and ongoing operation. The solicitation was posted on July 11, 2025, with a response deadline of September 5, 2025. The project size is estimated to be between five and fifteen million dollars, and it falls under the NAICS code 221114, which pertains to solar electric power generation. The contract aims to support the Authority’s sustainability goals by leveraging renewable energy, reducing operational costs, and promoting environmental responsibility. Interested parties can contact Missy McGrath via email for further information and access additional project details through the provided online portal.

Documents

8

104311 Power Purchase Agreement (PPA) with San Diego County Regional Airport Authority

PDF, High priority: read this firstcontract-document
High

RFP - New Terminal One Solar Photovoltaic System

PDF, High priority: read this firstrfp
High

Preliminary Solar Study for San Diego International Airport NT1

PDF, Low prioritystudy
Low

20250707141746340 Delivery Points.pdf

PDF

20250707141755501 NT1 PV Pathways.pdf

PDF

20250707141953240 NT1 Roof Photos (Phase 1A).pdf

PDF

20250707142031115 SDIA Design & Construction Standards.pdf

PDF

20250710080005093 Preliminary Site Plans.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County Regional Airport Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Missy Mcgrath

Full Description

Show more
The San Diego County Regional Airport Authority (Authority) seeks proposals from a qualified contractor/vendor (“Respondent”) to design, fabricate, deliver, install, operate, and maintain a roof-mounted utility-interactive solar photovoltaic (PV) system) at the San Diego International Airport (“Airport”) under a power purchase agreement (PPA). The project involves two separate but adjacent solar PV electric systems at San Diego International Airport. The first system, located on the eastern half of the New Terminal One (“NT1”) roof, also known as Phase 1A, is expected to generate at least 1.7 MW DC of electricity. The second system, situated on the western half of the NT1 roof, referred to as Phase 1B, is also anticipated to produce a minimum of 1.7 MW DC. The Authority anticipates entering into a Power Purchase Agreement which covers the design, fabrication, delivery, installation, operation, and maintenance of the PV system and the sale of power to the Authority from the successful Respondent with an anticipated term of twenty (20) years.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS