New Vertical Turbine Pump & Motor Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for the City of Tustin municipal water well projects involves the supply of new vertical turbine line-shaft deep well pumps, including attached motors, baseplates, couplings, and guards. The provider is responsible for manufacturing and testing all units to ensure that components exposed to potable water are NSF/ANSI 61 listed and meet NSF/ANSI 372 lead-content requirements. The scope of work concludes with the delivery of the completed pump and motor assemblies directly to the project site. This procurement is managed by the Public Works agency in California under NAICS code 333911, with a response deadline set for September 15, 2026.

General Info

Supply and deliver NSF-compliant vertical turbine pumps for City of Tustin water projects.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of CIP No. 60177.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies new vertical turbine line-shaft deep well pumps, attached motors, baseplates, couplings, and guards for prime contractors on City of Tustin municipal water well projects. Manufactures and tests units ensuring components exposed to potable water are NSF/ANSI 61 listed and comply with NSF/ANSI 372 lead-content requirements. Delivers new pump and motor assemblies to site.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong To Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a 12-foot main multi-modal path, a 6-foot secondary walking trail, a playground with PIP rubber surfacing, fitness pods, and extensive landscaping including trees, shrubs, and turf sod. The scope also encompasses site excavation, electrical work for pedestrian and street lighting, plumbing, and street improvements. The engineer's estimate for the project is $11,100,000, with a performance period of 190 contract days from the date of the Notice to Proceed. Eligible bidders must hold a valid Class A contractor's license and be registered with the California Department of Industrial Relations. The contract will be awarded to the lowest responsive and responsible bidder. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 pm, with a required hard copy of the bid bond delivered to the City Clerk. Liquidated damages for delays are set at $8,800 per calendar day. Contract administration includes monthly progress payments at 95% of the work value, with the final 5% released within 60 days of the Notice of Completion, provided as-built conditions are submitted. Contractors must adhere to strict quality and safety standards, including Cal-OSHA requirements, 2008 ADA Standards for Accessibility, and the project's Water Quality Management Plan. Additionally, the contractor must provide payment, faithful performance, and guaranty bonds, and ensure all work near utility lines is performed by Qualified Persons as defined by the California Administrative Code.
Highway, Street, and Bridge Construction

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
La Palma Alleys Sewer Improvement Project
Solicitation # RCP2023-21228
The La Palma Alleys Sewer Improvement Project, solicitation RCP2023-21228, is a public works initiative by the City of Anaheim to address capacity and operational deficiencies within its sanitary sewer system. The primary objective is to replace outdated 6-inch diameter pipes with the current 8-inch minimum standard to mitigate root intrusion and offset joints. Additionally, the project focuses on resolving specific operational failures, including the removal of a siphon at the intersection of La Palma and Harbor and the correction of a previously unknown sag between manholes SW070319 and SW071102. The scope also includes the design of neighborhood greening and stormwater capture systems using modified tree wells and catch basins, with all work adhering to the Central Anaheim Master Plan of Sanitary Sewers and City Design Standards. The City utilizes a qualifications-based selection process to award the contract, ranking consultants based on their expertise and the qualifications of key personnel. Selected firms must provide a Preliminary Design Report and CAD drawings, while adhering to strict administrative requirements, including bi-weekly status reports and monthly invoicing tied to a Work Breakdown Structure. Compliance mandates include the use of California prevailing wage rates, Buy America requirements, and the submission of various certifications regarding non-collusion, non-lobbying, and equal employment opportunity. Final acceptance of the work is contingent upon the submission of CCTV inspection videos for all pipes exceeding four inches in diameter and the successful restoration of ADA ramps. Proposals must be submitted electronically via OpenGov by December 3, 2026.
Engineering Services

POSTED

about 24 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS