Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

New Water Lines at River Forks Park & Campground

Closed
PE-77129-NONST-2027-000000070State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

22 minutes ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

22 minutes ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

22 minutes ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Hall County Government is soliciting bids for the replacement of deteriorated water supply lines at River Forks Park and Campground in Gainesville, Georgia. This turnkey project involves the installation of approximately 14,000 linear feet of water lines, specifically 9,476 feet of 4-inch PVC water main, 1,952 feet of 1-1/2-inch PVC service line, and 2,394 feet of 3/4-inch PVC service line. Additional requirements include the installation of 67 yard hydrants, 17 tie-ins to existing services, one RPZ backflow preventer assembly, and approximately 13,822 feet of tracer tape and wire. All work must adhere to the River Forks Plan Set, the City of Gainesville Water Resources Department Standards and Specifications of June 2025, and Georgia State Soil and Water Conservation Committee guidelines for erosion and sedimentation control. The contract will be awarded to the highest-scoring bidder based on a 60/40 split between technical qualifications and cost. Technical evaluations account for 600 points, while the cost proposal accounts for 400 points. Bidders must submit four hard copies and a USB flash drive by the September 10, 2026, deadline, including a 5 percent bid bond and a letter of bondability. The awarded contractor must provide performance and payment bonds equal to 100 percent of the contract value. The project is scheduled to commence no earlier than November 1, 2026, with substantial completion required by March 31, 2027. Payment terms are net 30 days in arrears following inspection and acceptance by the County's Project Manager.

General Info

Replace 14,000 linear feet of water lines at River Forks Park with new infrastructure and tracer tape by September 10, 2026.

Documents

2

RFQ/P 47-012 New Water Lines at River Forks Park & Campground

PDF, High priority: read this firstrfq
High

River Forks Park Water Line Installation Plan Set

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Hall County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The existing water supply lines at River Forks Park & Campground, managed by Hall County and owned by the United States Army Corps of Engineers, have deteriorated beyond their useful lives and are in need of replacement. There will be approximately 14,000 linear feet of water lines to be replaced, which will include various valves, shutoffs, and other plumbing equipment. The awarded contractor shall also install tracer tape and wire.

More opportunities from Georgia → Hall County Board of Commissioners

Same awarding agency

NAICS: 238160
New
SLED
RFQ/P#: 47-019 - Hall County Jail Complete Roof Replacement
Solicitation # 47-019
Hall County, Georgia, is soliciting proposals under RFQ/P 47-019 for a complete roof replacement at the Hall County Jail located at 1700 Barber Rd, Gainesville, GA. The project involves the installation of a 60 mill white TPO roofing system, including the management of 6.5 to 10 inches of insulation, using materials of equal quality to the Johns Manfield brand. The selected contractor must provide a 20-year manufacturer warranty and a 5-year workmanship warranty. Work is intended to begin in the winter to align with air conditioning shutdowns, with a performance schedule spanning Monday through Saturday from daylight to dark. Final acceptance requires an inspection by both the County project manager and a manufacturer representative. The contract will be awarded to the most responsible and responsive bidder based on a weighted scoring system: 80% for technical qualifications and 20% for the cost proposal. Bidders must submit four hard copies and a USB flash drive containing their proposal, including a separate sealed envelope for the cost proposal. Required documentation includes a letter of bondability, a W-9, E-Verify and Ethics affidavits, and a debarment certification. The successful contractor must provide a performance bond equal to 100% of the contract value and maintain comprehensive insurance naming Hall County Georgia as an additional insured. Payment terms are net 30 days in arrears, with invoices submitted electronically to the accounts payable department.
Roofing Contractors

POSTED

7 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS