Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

NKAK 08-1035 Repair Sanitary Sewer System (WW-07)

Active
FA4460-11-R-0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

642 Thomas Avenue, LITTLE ROCK AFB, AR, 72099, USA

Set-Aside

SBA

Documents

24

AR100212 Arkansas Heavy Construction Wage Determination

PDF, High priority: read this first3 pages · wage-determination
High

Attachment 2 - AF-EMIS Contractor Worksheet and Guide

PDF, High priority: read this first3 pages · sow
High

Civil/Structural Engineering Design Criteria and Expectations

PDF, High priority: read this first5 pages · specifications
High

FA4460-11-R-0037 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

FA4460-11-R-0037 Amendment 0002

PDF, High priority: read this first3 pages · amendment
High

FA4460-11-R-0037 Financial Institution Reference Sheet

PDF, High priority: read this first1 page · solicitation-attachment
High

FA4460-11-R-0037 Repair Sanitary Sewer RFP/IFB

PDF, High priority: read this first47 pages · ifb
High

FA4460-11-R-0037 RFI Responses / Q&A

PDF, High priority: read this first7 pages · q-and-a
High

LRAFB Mechanical Design Criteria and Expectations

PDF, High priority: read this first13 pages · specifications
High

NKAK 08-1035 Repair Sanitary Sewer SOW

PDF, High priority: read this first76 pages · sow
High

NKAK 08-1035 Repair Sanitary Sewer (WW-07) Existing

PDF, High priority: read this firstspecifications
High

UFGS MasterFormat 2004 Conversion Matrix, April 1, 2006

PDF, High priority: read this first31 pages · specifications
High

Attachment 3 - Environmental MOA Addendum, Little Rock AFB

PDF, Low priority3 pages · moa
Low

Attachment 6 Past and Present Performance Questionnaire

PDF, Low priority4 pages · past-performance
Low

FA4460-11-R-0037 Contractor C&D Debris Report

PDF, Low priority1 page · other
Low

FA4460-11-R-0037 Subcontractor Consent Form

PDF, Low priority1 page · other
Low

UFGS MasterFormat 2004 Conversion Matrix

PDF, Low priority31 pages · specifications
Low

Attachment+14+SH1-details+ADDEND+-.pdf

PDF

Attachment+15+SH2-DETAILS+ADDEND+-.pdf

PDF

Attachment+16+001-Layout1.pdf

PDF

Attachment+18+003_proposed.pdf

PDF

Attachment+19+004_details.pdf

PDF

Attachment+20+005_LIFT+STATION+-.pdf

PDF

Attachment+9+Drawings+NKAK+08-1035.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseSolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4460 19 Cons Pka
Contacts2 people available
OfficeLITTLE ROCK AFB, AR, 72099-4971, USA
Office AddressLITTLE ROCK AFB, AR, 72099-4971, USA
Contacts
Brandon D DavisContract Specialist
Barry G. JundtContracting Officer

Full Description

Show more
NOTICE TO OFFEROR; FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS PROJECT. NO AWARD WILL BE MADE UNDER THIS REQUEST FOR PROPOSAL (RFP) UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS RFP EITHER BEFORE OR AFTER THE RFP CLOSING DATE. The 19th Airlift Wing, Little Rock AFB, AR 72099 intends to Issue a Request for Proposal (RFP) to award a single firm fixed price contract for the design and construction of Repairing the Sanitary Sewer System at Little Rock AFB, Arkansas. The project shall encompass but not be limited to providing all design, plant, equipment, labor, and materials for all aspects of the replacement of sanitary sewer mains and service connections as well as manholes shown in project location maps. Sewer service shall be maintained to all existing buildings at all times during the project. The Contractor is responsible for fully meeting all requirements for the Design Build Statement of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled: A. NKAK 08-1035, Design Build, Repair Sanitary Sewer System (WW-07). The Contractor is responsible for any surveys, excavations, soil borings, soil analyses, chemical tests, laboratory tests, pressure tests, electrical tests, corrosion and cathodic protection tests, asbestos and lead-based paint surveys, and any other tests required for a complete design and construction of this project. The Contractor is responsible for locating all utilities in the area of construction, and for accommodating or modifying them, as required for the construction of this project. The Contractor is also responsible for demolition/disposal of existing water/sewer facilities as required to complete Contract work. Construction project magnitude is between $1,000,000 and $5,000,000. The period of performance is: I. Design, 150 days after issuance of Notice to Proceed 1 II. Construction, 200 days after issuance of Notice to Proceed 2 This procurement is being issued as a 100% Small Business set-aside. All responsible sources may submit a proposal. The office proposes to post RFP # FA4460-11-R-0037 to the FedBizOpps website (http://fbo.gov) on or about 29 July 2011. Once the solicitation is issued, it is incumbent upon the interested parties to review this site frequently for any updates/amendments to any and all documents. Past Performance information will be required to be submitted by the date specified in the solicitation. Pre-proposal conference/site visit information will be provided in the solicitation package. Contract award will be determined using the Source Selection procedures in FAR Part 15. All Contractors shall be ORCA registered (http://orca.bpn.gov). All contractors are reminded, in accordance with DFARS 252.204-7004, Required Central Contracting Registration, that lack of registration in the CCR database BY AWARD DATE will make a contractor ineligible for award. Please acknowledge all requirements in proposals. All interested parties are encouraged to attend the pre-proposal conference/site visit. NO PARTIAL QUOTES WILL BE CONSIDERED. NO PARTIAL AWARDS WILL BE MADE. No response to this notice is necessary. This notice does not obligate the Government to award a contract nor does it obligate the Government to pay for any proposal preparation costs. Any questions, requests for information (RFI's) etc. relating to the upcoming solicitation must be submitted in writing via email to the individuals designated in the solicitation. Telephone requests for packages, questions, RFI's etc. WILL NOT be accepted.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of pumps, a generator, odor control equipment, mechanical and electrical systems, and the demolition of existing pumps and piping. The project also encompasses site improvements such as stormwater facilities, fencing, and various paving and restoration activities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with specific requirements for the submission of a Good Faith Efforts Form and Table A to meet MBE/WBE participation goals of 10.9 percent for the EPA and 10 percent for the State of North Carolina. Performance and payment bonds, as well as proof of insurance, are required. The project is managed by Willis Engineers, and the contractor will be subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner. All work must adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of Defense → FA4460 19 Cons Pka

Same awarding agency

NAICS: 238290
New
Federal
Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services
Solicitation # FA446027Q0005
Solicitation FA446027Q0005 is a non-personal services contract for the comprehensive management, maintenance, repair, and inspection of real property vertical transportation equipment (VTE) at Little Rock Air Force Base, Arkansas. The scope of work covers freight and passenger elevators, escalators, and potentially wheelchair lifts, dock levelers, and dumbwaiters. The contractor is required to maintain a VTE availability rate of 95 percent and adhere to strict response times, including in-person arrival for emergency calls within two hours and commencement of routine work within 24 hours. All services must comply with ASME A17.1, ANSI/ASME A17.2, and other applicable safety and fire protection standards. A written Maintenance Control Program must be delivered within 30 calendar days of the award. This is a total small business set-aside under NAICS code 238290. The government will award the contract to the responsible offeror based on a lowest-price technically acceptable sequence, where the lowest-priced offer is selected if they possess an acceptable past performance rating, defined as at least two years of similar experience within the last four years. Proposals are due by November 18, 2026, and must be submitted via email to the designated points of contact. Payment and invoicing will be processed through Wide Area WorkFlow (WAWF) by the 10th of each month. Access to the base requires a valid REAL ID, and a single site visit is scheduled for October 26, 2026, requiring an RSVP by October 22, 2026.
Other Building Equipment Contractors

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS