Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on October 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NM FS 220(1), Romero Creek Bridge

Awarded
6982AF25B000012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; pipeline and utility work involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signals and lighting. Additional requirements encompass environmental compliance through Storm Water Pollution Prevention (SWPPP), trucking, hauling, and the supply of materials such as ready mix and precast concrete. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a final bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
The Chickasaw County Board of Supervisors will receive sealed bids in the office of the County Purchase Clerk, 146 County Road 412, Houston, Mississippi 38851, until 10:00 A.M., 30, October, 2026, and thereafter publicly opened for the furnishing, haulin
Solicitation # 3170036833
The Chickasaw County Board of Supervisors is soliciting sealed bids for the furnishing, hauling, placing, and compacting of bituminous hot mix, as-needed base repairs, and the removal and replacement of roadway cross-drains within Chickasaw County, Mississippi. Under solicitation number 3170036833, the scope of work includes hot mix asphalt overlays and leveling using MDOT approved mixes, as well as minor and major base repairs and the installation of HP pipes ranging from 12 to 48 inches. Bids must be submitted by 10:00 A.M. on October 30, 2026, either electronically via Agencybidbank.com or delivered to the County Purchase Clerk in Houston, Mississippi. Physical submissions must be sealed and labeled with the specific bid title and the contractor's Certificate of Responsibility number. The contract will operate on a quantity unit pricing basis, with work assigned through individual work orders that must be completed within 45 calendar days of issuance. Accepted bid prices will remain valid for a 12-month period from November 2, 2026, to November 2, 2027. Contractors are required to coordinate with Mississippi 811 for utility location prior to any excavation and must adhere to the latest Mississippi State Highway Department Special Provisions for asphalt fuel adjustments. The Board of Supervisors reserves the right to reject any bids or waive formalities to serve the county's best interests. Primary administrative contact for this solicitation is Purchase Clerk Courtney Gann.
MPTAP

POSTED

about 2 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Romero Creek Bridge project is a federally funded construction initiative located within the Gila National Forest in western-central New Mexico, primarily managed by the Department of Transportation’s Central Federal Lands Division. This project is designated as a Total Small Business Set-Aside, emphasizing participation from small businesses. The scope involves replacing a deteriorated single-span bridge over Romero Creek on Forest Route 220, with the existing structure measuring approximately 30.4 feet in length and 16 feet in width. The new bridge will be a prefabricated steel structure, complemented by roadway improvements such as paving the approaches for 100 feet on each side to prevent debris and sediment from entering the stream, and installing guardrails and guardrail terminals for safety. The terrain is rolling and mountainous, with elevations reaching up to 8,300 feet, and the work is scheduled to commence in fall 2025, with an estimated completion by fall 2026, avoiding winter months due to weather constraints. The project includes significant work items such as the removal of the existing bridge, embankment construction, installation of roadway aggregate and asphalt pavement, and the installation of structural concrete and guardrails. Estimated costs range from $700,000 to $2 million. The project’s timeline anticipates advertisement in summer 2025, with construction beginning in the fall, and it will utilize approximately 50 cubic yards of structural concrete, 250 tons of roadway aggregate, and 14 feet by 48 feet of prefabricated steel bridge. The project’s importance is underscored by its proximity to a main haul route for future timber extraction and restoration activities, making timely completion critical for ongoing forest management and conservation efforts.

General Info

Replace deteriorated Romero Creek Bridge in New Mexico with new structure; includes rails, paving, $700K-$2M budget.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Luna, NM, 87824, USA

Set-Aside

SBA

Documents

14

6982AF25B000012 - NM FS 220(1), Romero Creek Bridge

PDF, High priority: read this firstrfp
High

6982AF25B000012 - Romero Creek Bridge

PDF, High priority: read this firstifb
High

Amendment A001 to Solicitation 6982AF25B000012

PDF, High priority: read this firstamendment
High

NM FS 220(1) Romero Creek Bridge Bid Tabulation

PDF, High priority: read this firstaward
High

NM FS 220(1) Romero Creek Bridge Borrow Pit Locations

PDF, High priority: read this firstspecifications
High

NM FS 220(1) Romero Creek Bridge - Final Hydraulics Report

PDF, High priority: read this firstspecifications
High

NM FS 220(1) Romero Creek Bridge Plans

PDF, High priority: read this firstspecifications
High

Project 1-10211: Romero Creek Bridge General Plan and Details

PDF, High priority: read this firstspecifications
High

Romero Creek Bridge Final Geotechnical Report

PDF, High priority: read this firstspecifications
High

Romero Creek Bridge Final Geotechnical Report (March 2023)

PDF, High priority: read this firstspecifications
High

NM FS 220(1) Romero Creek Bridge Bid Opening Summary

PDF, Low prioritybid-opening-summary
Low

NM FS 220(1) Romero Creek Bridge - Q&A (09.08.25)

PDF, Low priorityq-and-a
Low

Romero Creek Bridge Inspection Report (Structure 030603000001032)

PDF, Low priorityspecifications
Low

11.12.4+Design+Physical+Data+and+Reports.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Laura Vallejos
Leslie Karsten

Full Description

Show more

PROJECT NUMBER:  NM FS 220(1)


PROJECT NAME:  Romero Creek Bridge


PROJECT DESCRIPTION:   This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft.


The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2” to 10”).  The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition.  Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream.  NFSR 220 will be a main haul route for an upcoming restoration project within the next few years.  There is potential for thousands of loads of timber to come out on NFSR 220.


SCOPE OF THE WORK:   This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico.  The existing single-span bridge’s overall length is 30.4-ft and width (out-out) measures 16.0-ft.  The existing roadway width is 14.0-ft.


Due to weather, no onsite work is to occur from early March to early May.


ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
AZ BL COLO 7528(1) Burro Creek Road
Solicitation # 6982AF27B000002
The U.S. Department of Transportation, Federal Highway Administration, Central Federal Lands Highway Division, is soliciting bids for the resurfacing, restoration, and rehabilitation of approximately 1.3 miles of Burro Creek Road in Mohave County, Arizona. This project aims to improve access to the Burro Creek Campground, enhance safety, and reduce erosion and maintenance costs. The scope of work includes full depth reclamation and asphalt concrete pavement, the installation of 18-inch and 24-inch pipe culverts, ditch reconditioning, slope stabilization, and the repair of bridge approaches at the eastern abutment. The project is divided into a base Schedule A for primary roadway rehabilitation and an Option X for bridge sedimentation repairs, undercutting resolution, and boulder placement. This is a total small business set-aside under NAICS code 237310, with an estimated cost range between 2,000,000 and 5,000,000 dollars. The anticipated schedule includes an award in January 2027, with construction running through October 2027. Key requirements include the provision of a qualified archaeologist for Tribal Cultural Sensitivity Training and adherence to the Davis-Bacon Act and the Buy American Act. Bids must be submitted by November 17, 2026, and must include original bid bonds, a completed Standard Form 1442, and a bid schedule. Performance and payment bonds are required upon award, and the contractor must begin work within 10 calendar days of the notice to proceed.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS