Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Alabama was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NMLF Landfill Gas Expansion PH V

Closed
PW-26-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
RFT Canyon Avenue (DR 15.1) Bank Stabilization Project
Solicitation # 10044924
The Canyon Avenue Bank Stabilization Project, managed by the Toronto and Region Conservation Authority, involves critical bank and channel restoration works at 35 Canyon Avenue, Toronto. The primary scope of work includes the construction of an armourstone retaining wall to replace failed gabion baskets, channel widening and realignment, and the placement of bedding material. Additional deliverables encompass erosion and sediment control measures, asphalt paving of damaged roads and trails, and extensive landscape restoration involving topsoil, coir mats, and the planting of hundreds of trees and shrubs. The project is supported by technical assessments, including a detailed design brief, an arborist report covering 797 surveyed trees, a soil characterization report for approximately 2600 cubic meters of excess soil, and a Stage 2 archaeological assessment which found no cultural resources in the area. This solicitation is a stipulated price contract based on the CCDC 2 2020 form and is exclusively open to bidders prequalified under Category A1 of RFPQ No. 10043326. The contract will be awarded to the lowest compliant bidder, with a response deadline of October 20, 2026. Key contractual requirements include the submission of a CCDC 220 Bid Bond, a Statement of Insurability, and a Consent of Surety form, with the successful contractor required to provide performance and labour and material payment bonds each equal to 50 percent of the contract price. The project is estimated at approximately 1.9 million dollars, with a maximum category value of 3 million dollars. Contractors must adhere to stringent standards, including O.Reg. 213/9 for traffic protection and Toronto Urban Forestry permits for tree protection.
Toronto and Region Conservation Authority

POSTED

about 20 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
IFB #2627-006 - Summerville High School Tennis Courts at Alston Middle School
Solicitation # 2627-006
Dorchester School District Two has issued Invitation for Bid IFB 2627-006 for the construction of six new tennis courts for Summerville High School, to be located on the Alston Middle School campus at 500 Bryan Street, Summerville, South Carolina. The project requires the contractor to provide all labor, materials, equipment, and warranties necessary for completion, including specific technical requirements for structural slabs and sports lighting poles. Bids must be submitted in a sealed package to Ashley Cash by October 27, 2026, at 2:00 PM. The award will be granted to a single, lowest responsible and responsive bidder. The pricing structure consists of a lump sum base bid that must include three specific allowances: 20,000 dollars for AHJ contingency, 30,000 dollars for unsuitable soils, and 10,000 dollars for landscaping. Bidders must provide a bid bond or certified check for at least five percent of the base bid and a performance bond guaranteeing workmanship for 24 months. Because the work occurs on an active school site, contractors must adhere to strict student safety and security policies. Performance is subject to liquidated damages of 200 dollars per day for delays in substantial completion and 100 dollars per day for delays in final completion. Compliance with the Davis Bacon Act, Buy America Act, and ADA-ABA accessibility guidelines is required.
Dorchester School District Two

POSTED

about 20 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract entails the construction of seven new vertical landfill gas collection wells along with the associated header and lateral piping. The project must adhere to the 2022 Edition of the Alabama Department of Transportation Standard Specifications for Construction, unless otherwise approved by the City Engineer. The work is required to be completed within 60 calendar days from the start date, ensuring a timely execution. The City of Montgomery maintains the discretion to award additional alternates in any sequence they see fit. This solicitation, identified as "NMLF Landfill Gas Expansion PH V" and numbered PW-26-26, is managed by the City of Montgomery's Public Works department. The solicitation was posted on May 8, 2026, with a response deadline set for June 10, 2026. The primary contact for the project is Lacey Belk, City Operations Program Manager, with Ken Barwick, Buyer II (Part-Time), serving as a secondary contact. The project is located in Alabama, with operations centered in Montgomery. All inquiries and submissions are to be coordinated through the designated city contacts.

General Info

Construct seven landfill gas wells with piping in Montgomery, Alabama, under ADOT specs within 60 days.

Agency

Alabama → Public WorksView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

AL, USA

Set-Aside

NONE

Documents

(2)

NMLF_LFG_PHV_PLANS_20260507.pdf

PDF

NMLF_LFG_PHV_ProjectManual_Signed.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama → Public Works
Contacts2 people available
OfficeMontgomery, AL, 36104, USA
Organization / Agency
Alabama → Public Works
View Agency Profile
Office AddressMontgomery, AL, 36104, USA
Contacts
Lacey BelkCity Operations Program Manager
Ken BarwickBuyer II (Part-Time)

Interested Companies (9)

Show more
Duncan Renovations
MONTGOMERY, AL
Skinny
Secane, PA
Visionaires
Jackson, MS

See All 9 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project involves the construction of 7 new vertical landfill gas collection wells and associated header and lateral piping. The entire project shall be completed in 60 days. All material and construction requirements shall be in accordance with the 2022 Edition of the Alabama Department of Transportation Standard Specifications for Construction unless otherwise approved and accepted by the City Engineer. This project is to be completed within 60 calendar days of start of work. The City of Montgomery reserves the right to award additive alternates in any order they determine.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS