Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alabama was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NMLF Landfill Gas Expansion PH V

Closed
PW-26-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
AML 2409 Kickapoo Valley Coal Dam
Solicitation # 26-422DNR-MINES-B-54946
Solicitation 26-422DNR-MINES-B-54946 is an Invitation for Bid issued by the Illinois Department of Natural Resources, Office of Mines and Minerals, for the reclamation of the Kickapoo Valley Coal Company Dam located in Peoria County, Illinois. The scope of work involves clearing and earthwork to reclaim an existing dam and modify the Landfill Entrance Dam. Key deliverables include the construction of a concrete pipe principal spillway, a riprap lined emergency spillway swale, a riprap lined outfall chute, the replacement of the dam crest roadway, the construction of a haul road dam, and the establishment of a wetland with a perimeter walking trail. All work must adhere to strict quality standards, including ASTM C361 and ASTM C969-24, with zero allowable leakage permitted during a 24-hour test period for the box culvert installation. The contract will be awarded to the lowest priced responsive and responsible bidder. Bidders must submit pricing via the Quote Items Tab on BidBuy and provide several required documents, including a Vendor Disclosure, Offer to the State of Illinois, BEP Utilization Plan, a 5% bid bond, and a PLA Contractor and Subcontractor Letter of Assent. A performance bond is required from the awarded vendor prior to contract execution. The project mandates compliance with prevailing wage laws and the Buy America preference for infrastructure materials. There is no specified set-aside status for this solicitation.
MINESMINERALS422 - Office of Mines and Minerals

POSTED

about 5 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract entails the construction of seven new vertical landfill gas collection wells along with the associated header and lateral piping. The project must adhere to the 2022 Edition of the Alabama Department of Transportation Standard Specifications for Construction, unless otherwise approved by the City Engineer. The work is required to be completed within 60 calendar days from the start date, ensuring a timely execution. The City of Montgomery maintains the discretion to award additional alternates in any sequence they see fit. This solicitation, identified as "NMLF Landfill Gas Expansion PH V" and numbered PW-26-26, is managed by the City of Montgomery's Public Works department. The solicitation was posted on May 8, 2026, with a response deadline set for June 10, 2026. The primary contact for the project is Lacey Belk, City Operations Program Manager, with Ken Barwick, Buyer II (Part-Time), serving as a secondary contact. The project is located in Alabama, with operations centered in Montgomery. All inquiries and submissions are to be coordinated through the designated city contacts.

General Info

Construct seven landfill gas wells with piping in Montgomery, Alabama, under ADOT specs within 60 days.

Documents

2
PDF, High priority: read this first16 pages · specifications
High
PDF

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 311 days
  • Sewer Main Open Cut ExcavationOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama → Public Works
Contacts2 people available
OfficeMontgomery, AL, 36104, USA

Interested Companies (9)

CEC ControlsBradenton, FL
Companions For Wellness

See All 9 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project involves the construction of 7 new vertical landfill gas collection wells and associated header and lateral piping. The entire project shall be completed in 60 days. All material and construction requirements shall be in accordance with the 2022 Edition of the Alabama Department of Transportation Standard Specifications for Construction unless otherwise approved and accepted by the City Engineer. This project is to be completed within 60 calendar days of start of work. The City of Montgomery reserves the right to award additive alternates in any order they determine.

More opportunities from Alabama → Public Works

Same awarding agency

NAICS: 562219
SLED
Request for Proposals - Landfill Gas Beneficial Use Project NMLF
Solicitation # PW-5-27
The City of Montgomery is seeking proposals from qualified developers to finance, design, permit, construct, own, operate, maintain, and eventually decommission a landfill gas (LFG) beneficial use project at the North Montgomery Landfill. The objective is to maximize the beneficial use of recoverable LFG while maintaining regulatory compliance, public safety, and landfill operations. The City intends to sell raw LFG to the selected developer, who may propose various commercially demonstrated alternatives such as Renewable Natural Gas (RNG), electricity generation, high-Btu beneficial use, or direct-use projects. The anticipated agreement term is twenty years, and the developer will be responsible for all infrastructure, permitting, and the cost of site restoration upon decommissioning. Proposals are due by November 30, 2026, at 2:00 PM, and may be submitted electronically or in hard copy. Evaluation will be based on a weighted criteria system, considering factors such as direct project revenue, administrative burden, and risk. The selected developer must provide comprehensive insurance coverage, including $5 million for Commercial General Liability and Pollution Legal Liability, and must ensure secure real-time visibility of operating parameters. The project must comply with Alabama Department of Environmental Management (ADEM) requirements and coordinate daily operations with the City and Three Notch Group Inc. There is no set-aside status for this solicitation.
Other Nonhazardous Waste Treatment and Disposal

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS