INDUSTRY DAY_NOAA/USCG Recapitalization Project (Design-Build)

Closed
1305M226NOAAUSCG Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 19 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The National Oceanic and Atmospheric Administration, in coordination with the United States Coast Guard, is preparing for a major Design-Build infrastructure project to recapitalize the waterfront facilities at USCG Station Juneau, Alaska, to support the homeporting of USCGC STORIS and other visiting cutter classes. The project, with an estimated contract value between $125 million and $200 million, is scheduled for award in the fourth quarter of fiscal year 2026 and aims to deliver a resilient, mission-ready waterfront capable of sustaining critical Coast Guard operations in the harsh Arctic and Alaskan environment. The scope includes complete demolition of aging wharf structures and construction of a new fixed wharf for one cutter berth and a floating pier system for two additional berths, complemented by comprehensive fendering, mooring systems, shore power infrastructure, potable water, sewer, fire protection, communications, and backup power systems. Civil and site improvements are required, with optional work involving renovations of three existing buildings totaling approximately 23,500 square feet, construction of a covered floating small boat facility, and dredging activities. The project site presents extreme challenges, including tidal variations exceeding 25 feet, wind events up to 100 MPH, high seismic activity, prolonged cold temperatures, saltwater corrosion, and the necessity to maintain uninterrupted 24/7 operational continuity of an active Coast Guard installation throughout all phases of construction. Temporary utilities, access routes, mooring systems, and security measures must be established to support ongoing missions without disruption. The contract will be awarded under a Firm Fixed Price Design-Build delivery method, transferring full design and construction risk to the contractor, and requires adherence to rigorous design milestones including Concept, 35%, 65%, 95%, and Issued for Construction packages, each with defined deliverables such as engineering calculations, basis of design documents, construction schedules, and quality control certifications. Contractors are expected to provide an on-site job office trailer with office and conference space, fully furnished and serviced. Electrical systems must support a net increase of 6,400 amps and integrate with the USCG Distributed Automation System, while all marine components must be designed for a 50-year service life under severe environmental conditions. Construction must comply with cold-region and seismic design standards and navigate complex environmental permitting and seasonal work windows. A site walk during the Industry Day on June 3, 2026, is mandated for interested bidders to assess existing conditions and logistical

General Info

NOAA and USCG Industry Day for USCGC STORIS Juneau waterfront upgrade, $125-200M, FY2026 award.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Juneau, AK, 99802, USA

Set-Aside

NONE

Documents

2

STORIS Industry Day Sign-In Sheet

PDF, Low priorityindustry-day
Low

USCG Station Juneau Homeport Project Industry Day Presentation

PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

Notice type changed from Sources Sought to Special Notice. Response deadline changed from Jan 16, 2026 to May 27, 2026. The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts2 people available
OfficeNORFOLK, VA, 23510, USA
Organization / AgencyDepartment Of Commerce Noaa
Office AddressNORFOLK, VA, 23510, USA
Contacts

Full Description

Show more

Purpose: The National Oceanic and Atmospheric Administration (NOAA), in support of the United States Coast Guard (USCG), invites interested industry partners to attend an Industry Day for the USCGC STORIS Homeport Recapitalization Project in Juneau, Alaska. This event is intended to:


  • Provide a high-level overview of the project scope and objectives
  • Highlight key technical challenges and execution considerations
  • Offer industry insight into site conditions and operational constraints
  • Support market awareness in advance of the formal solicitation
  • Provide a site walk for potential design/build contractors

Project Overview: The Government is planning a Design-Build (DB) project to recapitalize and modernize the waterfront infrastructure at USCG Station Juneau to support the homeporting of USCGC STORIS and visiting cutter classes. The project will deliver a resilient, mission-ready waterfront facility capable of supporting Coast Guard operations in the Arctic and Alaska region, including search and rescue, maritime security, environmental response, and national defense missions. The anticipated construction magnitude is approximately $125M–$200M, with contract award currently projected for FY26 (Q4).


Scope Overview (High-Level): The project generally includes the Design-Build recapitalization of the existing waterfront and supporting infrastructure, including:


  • Demolition of aging waterfront wharf and support facilities (not existing shoreside buildings)
  • Construction of a new wharf to support at least (1) cutter berth
  • Construction of a new floating pier system supporting multiple (2) cutter berths
  • Fender systems and mooring infrastructure for USCG and visiting vessels
  • Shore power and electrical system upgrades
  • Potable water, sewer, fire protection, and communications systems
  • Backup power and site-wide utility distribution
  • Civil/site improvements

Optional work may include the following:


  • MWD building renovations
  • Covered floating small boat facility
  • Additional building renovations
  • Dredging

Note: This overview is provided for general awareness only. Detailed requirements will be included in the forthcoming Request for Proposals (RFP).


Key Technical Considerations: This project presents significant technical and logistical challenges, including:


  • Extreme tidal variation (>25 feet)
  • 100 MPH localized Taku wind events
  • High seismic design requirements
  • Cold-region construction and corrosion exposure
  • Heavy cutter berthing and mooring loads
  • The project site is an active, 24/7 operational Coast Guard installation and there will be a requirement to maintain continuous USCG operations during construction
  • Temporary utilities, access, and mooring systems will be required
  • Marine logistics, seasonal work windows, and environmental permitting will be critical
  • Cold-region or Arctic construction

Site Walk: A site walk of USCG Station Juneau waterfront facilities will be conducted as part of Industry Day. The site walk will include the following:


  • Provide firsthand understanding of existing conditions
  • Support industry planning for constructability and execution

RSVP: The Industry Date is set to occur on Wednesday, June 3, 2026. All interested parties shall complete the Google Form as provided in the link below by May 27, 2026. An email with event details will be provided separately. Please direct all questions regarding Industry Day to contact@example.gov and contact@example.gov.


This link works (please copy and past if the link below blocks you or asks for permission):  https://docs.google.com/forms/d/e/1FAIpQLSe2dDAvgZxpy95dG2BkEgwk-uiyceDvxuna-5E2CNc1gnq3cg/viewform 


Disclaimer: This Industry Day is for informational purposes only and does not constitute a solicitation. The Government is not obligated to issue a solicitation or award a contract as a result of this notice.


More opportunities from Department Of Commerce Noaa

Same awarding agency

NAICS: 561210
New
Federal
Fairbanks Command and Data Acquisition Station (FCDAS) for Operations and Maintenance Services
Solicitation # 1332KP26R0041
Solicitation 1332KP26R0041 is a request for proposal for operations and maintenance services at the Fairbanks Command and Data Acquisition Station in Alaska, a National Critical Asset that requires 24x7x365 operational continuity. The scope of work includes satellite operations, facility maintenance, IT, security guard services, and property logistics. This performance-based service contract is set aside 100 percent for small business concerns. The period of performance consists of a base year from June 1, 2027, through May 31, 2028, with four optional extension periods extending through May 31, 2032. The government will utilize a best value tradeoff process to evaluate proposals based on technical approach, past performance, and price, with non-price factors combined being approximately equal in importance to price. Eligible offerors must hold an active facility clearance with the Defense Counterintelligence and Security Agency. The contract incorporates various firm-fixed-price and time-and-materials line items, with a total estimated procurement value of 1,525,000 dollars. Proposals are due by 2:00 PM ET on November 9, 2026, and must comply with specific labor standards, including the Fairbanks Joint Craft Council and Teamsters Local 959 Collective Bargaining Agreements.
Facilities Support Services

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 541511
New
Federal
NOAA NOS OCS Coast Pilot Production System- Maintenance and Support
Solicitation # 26-3539
The National Oceanic and Atmospheric Administration (NOAA) Office of Coast Survey (OCS) is conducting market research via a Sources Sought Notice for the maintenance and support of the Coast Pilot Production System (CPPS). The objective is to modernize the Coast Pilot through improved content quality, expanded data sharing, and enhanced display modalities. The anticipated contract will be a Firm Fixed Price (FFP) award consisting of a one-year base period from May 5, 2027, through May 4, 2028, with four subsequent option years extending through May 4, 2032. Work will primarily be performed at the contractor's site, though it involves coordination with the OCS headquarters in Silver Spring, Maryland. The scope of work includes providing development, fault analysis, testing, debugging, and technical support to ensure system stability and compliance with NOAA IT security directives and International Hydrographic Organization (IHO) standards. Key technical requirements involve maintaining the Adobe InDesign Server, NOAA corporate databases, and desktop operating systems, as well as implementing core updates to Microsoft .Net, Bootstrap, and CK Editor within 12 months of award. The contractor must provide telephone and email support during standard business hours and submit monthly activity reports and invoices by the 15th of each month. Under NAICS code 541511, the government is seeking capability statements from interested firms. Respondents must provide their SAM Unique Entity Identifier, company size status, and a detailed explanation of their ability to provide the required maintenance and development services. Selected personnel will be required to undergo security processing and utilize government-furnished equipment, including VPN accounts and CAC authentication, to maintain the system.
Custom Computer Programming Services

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS