Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

Closed
W912QR26QA067Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract is for the construction of a flush restroom facility at the Tailwater Recreation Area of Nolin River Lake in Kentucky, under solicitation number W912QR26QA067, issued by the U.S. Army Corps of Engineers Louisville District. The scope encompasses all labor, materials, tools, equipment, planning, supervision, communication, and inspection necessary to complete the facility in compliance with federal, state, and local regulations, including adherence to prevailing wage rates and applicable standards such as OSHA, ASTM, ANSI, and USACE EM 385-1-1. The work must be completed within 180 calendar days after notice to proceed, with performance beginning no later than 14 days after award, and includes a one-year warranty on construction. The project is definitively scoped within the specified plans and specifications, including referenced drawings AB01, MB01, PB01, EN01, and EN02, and requires full government inspection and acceptance at the destination site. The procurement is a total small business set-aside under NAICS code 236220 with a size standard of $45 million, and is structured as a Firm-Fixed Price contract under the Lowest Price Technically Acceptable methodology, though this is not explicitly stated. The solicitation has been amended to eliminate bid guarantees and associated clauses, requiring instead only a payment bond or irrevocable letter of credit in lieu of both performance and payment bonds. Offerors must hold a valid UEI and CAGE code and provide representations regarding small business status, employment eligibility via E-Verify, and compliance with I-9 requirements. Additional requirements include mandatory DoD and Army security training, NCIC-III and TSDB vetting for unescorted access, submission of background investigation packets, annual background checks for long-term contracts, and strict adherence to OPSEC and security protocols. Proposals must be submitted by 10:00 AM EDT on August 11, 2026, via the PIEE Solicitation Module in a searchable PDF format with appropriate naming conventions, and include compliance with all clauses related to safety, hazardous materials, subcontractor management, and government oversight, with no option for negotiation on the performance period or delivery schedule.

General Info

U.S. Army awards small business contract to build flush restroom at Nolin River Lake, with Buy American and security compliance required.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

U.S. Army Corps of EngineersNolin River Lake2150 Nolin Dam RoadMammoth Cave, KY 42259, Mammoth Cave, KY, 42259, USA

Set-Aside

SBA

Documents

12

Amendment 0001 to Solicitation W912QR26QA067 for Nolin River Lake Tailwater Restroom Construction

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912QR26QA067 for Nolin River Lake Tailwater Restroom Construction

PDF, High priority: read this firstamendment
High

Appendix B NRL Tailwater Restroom Construction and Fixture Notes

PDF, High priority: read this firstsow
High

Clauses for Construction Contract Work

PDF, High priority: read this firstclauses
High

PIEE Electronic Proposal Submission Directions

PDF, High priority: read this firstspecial-notice
High

RFQ Special Instructions for Flush Restroom Construction at Nolin River Lake

PDF, High priority: read this firstspecial-notice
High

RFQ Tailwater Restroom Construction Nolin River Lake

PDF, High priority: read this firstrfq
High

Solicitation W912QR26QA067 for Nolin River Lake Tailwater Restroom Construction

PDF, High priority: read this firstifb
High

Solicitation W912QR26QA067 ProjNet Bidder Inquiry Instructions

PDF, High priority: read this firstspecial-notice
High

Wage Determination KY20260099 for Kentucky Building Construction

PDF, High priority: read this firstwage-determination
High

Appendix A Plan Sheets for NRL Tailwater Restroom

PDF, Low priorityother
Low

Representations and Certifications Document

PDF, Low priority1 page · representations-and-certifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline time changed from 3:00 PM UTC to 2:00 PM UTC on Aug 11, 2026. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA
Contacts

Full Description

Show more

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION


PROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKY


THE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR?S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE.


36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00.


THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00.


IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.



***Amendment 0001****


Updated RFO clause 52.228-13 Alternate Payment Protections, section (a) is updated to allow the contractor to submit a Payment Bond or Irrevocable Letter of Credit as a form of payment protection. Offeror due date is updated on PIEE and SAM.gov to 10:00 AM EDT to match box 13(a) and the Special Instructions page of the solicitation. The offeror due date and time remains 10:00 AM EDT on 11 August 2026. Box 13(b) is updated to make an offer guarantee is not required. RFO clauses involving Bid Guarantees are deleted from the solicitation: 52.228-1 Bid Guarantee and 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee).


***Amendment 0001***



***Amendment 0002***


Two (2) questions were received by a potential offeror after a site visit. The amendment provides the questions and answers.


***Amendment 0002***

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS