Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on July 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Boulevard Park Phase 1 - 5th Avenue South Sewer Extension Project, Valley View Sewer District, Tukwila, WA #12540

Closed
12540State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The project involves the installation of approximately 1,434 linear feet of 8-inch sewer mainline pipe along with about 400 linear feet of 6-inch side sewer stub pipe and 48 linear feet of 8-inch side sewer stub pipe, connecting to the mainline via sixteen 8-inch by 6-inch tees or wyes and five 8-inch by 8-inch tees or wyes. Each stub extension will run from the mainline to the right of way or property line and will be supported by five fiberglass Predl manhole bases. The scope includes sawcutting and removing existing asphalt pavement and restoring it after construction. All work will be conducted using open-cut methods, requiring the contractor to support and shore any existing utilities encountered during excavation to ensure their integrity during installation. The project is located in the North Boulevard Park Phase 1 area near 5th Avenue South in Tukwila, Washington, with the place of performance listed as Seattle in the 98168 zip code. A mandatory pre-bid meeting is scheduled for July 9 at 10:00 am at the Valley View Sewer District office in Tukwila. The solicitation, numbered 12540, was posted on July 22, 2026, with a response deadline of July 29, 2026, at 5:00 pm. The contracting agency is the Valley View Sewer District, a local entity in Washington. The project is under the jurisdiction of this district with no specified set-aside classification and no NAICS code provided. All bids must be submitted in accordance with the instructions and deadlines outlined in the solicitation, and performance is expected to adhere strictly to the specified materials, methods, and locations detailed in the contract terms.

General Info

Install 1,434 ft of 8-inch sewer main, 448 ft of stubs, 21 tees, 5 manholes, restore pavement, open-cut in Tukwila.

Agency

Washington → Valley View Sewer DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Seattle, WA, 98168, USA

Set-Aside

NONE

Documents

(415)

Specs - Page 102.jpg

JPG

Specs - Page 183.jpg

JPG

Addendum #1 Plans - Page 7.jpg

JPG

Addendum #1 - Page 10.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 140.jpg

JPG

Specs - Page 218.jpg

JPG

Specs - Page 248.jpg

JPG

Specs - Page 208.jpg

JPG

Specs - Page 199.jpg

JPG

Specs - Page 295.jpg

JPG

Addendum #3 Plans - Page 11.jpg

JPG

Specs - Page 178.jpg

JPG

Specs - Page 91.jpg

JPG

Addendum #3 Plans - Page 3.jpg

JPG

Specs - Page 185.jpg

JPG

Addendum #3 - Page 1.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 272.jpg

JPG

Plans - Page 11.jpg

JPG

Specs - Page 310.jpg

JPG

Specs - Page 215.jpg

JPG

Specs - Page 35.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 217.jpg

JPG

Specs - Page 240.jpg

JPG

Addendum #3 - Page 6.jpg

JPG

Specs - Page 166.jpg

JPG

Specs - Page 209.jpg

JPG

Specs - Page 266.jpg

JPG

Specs - Page 252.jpg

JPG

Addendum #3 Plans - Page 8.jpg

JPG

Addendum #1 - Page 8.jpg

JPG

Plans - Page 2.jpg

JPG

Specs - Page 172.jpg

JPG

Specs - Page 63.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 99.jpg

JPG

Specs - Page 36.jpg

JPG

Plans - Page 4.jpg

JPG

Specs - Page 97.jpg

JPG

Specs - Page 160.jpg

JPG

Specs - Page 322.jpg

JPG

Specs - Page 331.jpg

JPG

Specs - Page 327.jpg

JPG

Specs - Page 221.jpg

JPG

Specs - Page 339.jpg

JPG

Specs - Page 32.jpg

JPG

Addendum #3 - Page 5.jpg

JPG

Specs - Page 340.jpg

JPG

Specs - Page 170.jpg

JPG

Specs - Page 66.jpg

JPG

Addendum #2 - Page 1.jpg

JPG

Specs - Page 269.jpg

JPG

Specs - Page 191.jpg

JPG

Specs - Page 204.jpg

JPG

Addendum #1 Plans - Page 4.jpg

JPG

Specs - Page 55.jpg

JPG

Specs - Page 203.jpg

JPG

Specs - Page 306.jpg

JPG

Addendum #1 Plans - Page 12.jpg

JPG

Specs - Page 285.jpg

JPG

Specs - Page 260.jpg

JPG

Specs - Page 19.jpg

JPG

Addendum #3 Plans - Page 13.jpg

JPG

Specs - Page 142.jpg

JPG

Specs - Page 289.jpg

JPG

Specs - Page 174.jpg

JPG

Specs - Page 287.jpg

JPG

Specs - Page 216.jpg

JPG

Plans - Page 5.jpg

JPG

Specs - Page 181.jpg

JPG

Specs - Page 4.jpg

JPG

Specs - Page 268.jpg

JPG

Addendum #1 Plans - Page 13.jpg

JPG

Addendum #3 - Page 3.jpg

JPG

Specs - Page 220.jpg

JPG

Specs - Page 284.jpg

JPG

Specs - Page 17.jpg

JPG

Specs - Page 298.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 29.jpg

JPG

Specs - Page 28.jpg

JPG

Addendum #1 Plans - Page 14.jpg

JPG

Specs - Page 177.jpg

JPG

Specs - Page 325.jpg

JPG

Specs - Page 297.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 51.jpg

JPG

Addendum #3 Plans - Page 5.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 342.jpg

JPG

Specs - Page 305.jpg

JPG

Specs - Page 308.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 159.jpg

JPG

Addendum #1 Plans - Page 1.jpg

JPG

Specs - Page 161.jpg

JPG

Specs - Page 68.jpg

JPG

Specs - Page 257.jpg

JPG

Specs - Page 316.jpg

JPG

Addendum #1 - Page 9.jpg

JPG

Addendum #1 Plans - Page 3.jpg

JPG

Plans - Page 14.jpg

JPG

Specs - Page 23.jpg

JPG

Specs - Page 75.jpg

JPG

Addendum #3 - Page 2.jpg

JPG

Specs - Page 114.jpg

JPG

Addendum #3 Plans - Page 1.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 253.jpg

JPG

Specs - Page 7.jpg

JPG

Specs - Page 76.jpg

JPG

Specs - Page 319.jpg

JPG

Specs - Page 60.jpg

JPG

Addendum #1 Plans - Page 2.jpg

JPG

Specs - Page 152.jpg

JPG

Specs - Page 291.jpg

JPG

Specs - Page 307.jpg

JPG

Specs - Page 154.jpg

JPG

Addendum #3 Plans - Page 7.jpg

JPG

Specs - Page 38.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Specs - Page 241.jpg

JPG

Plans - Page 10.jpg

JPG

Addendum #3 Plans - Page 16.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 16.jpg

JPG

Specs - Page 233.jpg

JPG

Specs - Page 323.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 33.jpg

JPG

Specs - Page 153.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 302.jpg

JPG

Specs - Page 311.jpg

JPG

Specs - Page 72.jpg

JPG

Addendum #3 Plans - Page 2.jpg

JPG

Addendum #1 - Page 6.jpg

JPG

Specs - Page 321.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 328.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 171.jpg

JPG

Specs - Page 90.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 148.jpg

JPG

Specs - Page 202.jpg

JPG

Specs - Page 195.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 324.jpg

JPG

Specs - Page 237.jpg

JPG

Specs - Page 345.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 207.jpg

JPG

Plans - Page 13.jpg

JPG

Addendum #3 Plans - Page 15.jpg

JPG

Specs - Page 213.jpg

JPG

Specs - Page 162.jpg

JPG

Specs - Page 30.jpg

JPG

Plans - Page 8.jpg

JPG

Specs - Page 39.jpg

JPG

Specs - Page 206.jpg

JPG

Specs - Page 132.jpg

JPG

Addendum #1 Plans - Page 15.jpg

JPG

Specs - Page 89.jpg

JPG

Specs - Page 187.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 312.jpg

JPG

Specs - Page 156.jpg

JPG

Specs - Page 262.jpg

JPG

Specs - Page 197.jpg

JPG

Specs - Page 254.jpg

JPG

Specs - Page 144.jpg

JPG

Addendum #3 - Page 4.jpg

JPG

Plans - Page 15.jpg

JPG

Specs - Page 44.jpg

JPG

Specs - Page 205.jpg

JPG

Specs - Page 288.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 249.jpg

JPG

Specs - Page 333.jpg

JPG

Specs - Page 271.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 267.jpg

JPG

Addendum #1 Plans - Page 17.jpg

JPG

Addendum #3 Plans - Page 4.jpg

JPG

Specs - Page 42.jpg

JPG

Addendum #3 Plans - Page 14.jpg

JPG

Specs - Page 336.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 278.jpg

JPG

Specs - Page 341.jpg

JPG

Specs - Page 164.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 67.jpg

JPG

Plans - Page 6.jpg

JPG

Specs - Page 189.jpg

JPG

Addendum #1 Plans - Page 6.jpg

JPG

Specs - Page 228.jpg

JPG

Specs - Page 231.jpg

JPG

Specs - Page 293.jpg

JPG

Specs - Page 247.jpg

JPG

Specs - Page 212.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 317.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 238.jpg

JPG

Specs - Page 263.jpg

JPG

Specs - Page 258.jpg

JPG

Specs - Page 229.jpg

JPG

Specs - Page 180.jpg

JPG

Specs - Page 320.jpg

JPG

Specs - Page 338.jpg

JPG

Specs - Page 245.jpg

JPG

Specs - Page 74.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 192.jpg

JPG

Specs - Page 211.jpg

JPG

Addendum #1 - Page 11.jpg

JPG

Specs - Page 232.jpg

JPG

Specs - Page 243.jpg

JPG

Specs - Page 259.jpg

JPG

Specs - Page 14.jpg

JPG

Specs - Page 5.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 146.jpg

JPG

Specs - Page 59.jpg

JPG

Specs - Page 329.jpg

JPG

Specs - Page 227.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 182.jpg

JPG

Specs - Page 188.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 169.jpg

JPG

Specs - Page 343.jpg

JPG

Specs - Page 315.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 303.jpg

JPG

Specs - Page 318.jpg

JPG

Specs - Page 58.jpg

JPG

Addendum #3 Plans - Page 18.jpg

JPG

Specs - Page 219.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 300.jpg

JPG

Specs - Page 292.jpg

JPG

Addendum #1 Plans - Page 10.jpg

JPG

Specs - Page 64.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 15.jpg

JPG

Specs - Page 256.jpg

JPG

Specs - Page 71.jpg

JPG

Specs - Page 246.jpg

JPG

Addendum #3 Plans - Page 9.jpg

JPG

Addendum #3 - Page 7.jpg

JPG

Specs - Page 270.jpg

JPG

Specs - Page 50.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 334.jpg

JPG

Specs - Page 1.jpg

JPG

Specs - Page 25.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 296.jpg

JPG

Specs - Page 157.jpg

JPG

Specs - Page 22.jpg

JPG

Specs - Page 236.jpg

JPG

Specs - Page 286.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 332.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 190.jpg

JPG

Specs - Page 299.jpg

JPG

Specs - Page 135.jpg

JPG

Specs - Page 290.jpg

JPG

Addendum #1 Plans - Page 16.jpg

JPG

Specs - Page 176.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 37.jpg

JPG

Addendum #3 Plans - Page 12.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 173.jpg

JPG

Specs - Page 128.jpg

JPG

Plans - Page 16.jpg

JPG

Specs - Page 313.jpg

JPG

Specs - Page 41.jpg

JPG

Specs - Page 275.jpg

JPG

Specs - Page 337.jpg

JPG

Specs - Page 273.jpg

JPG

Specs - Page 149.jpg

JPG

Specs - Page 335.jpg

JPG

Specs - Page 52.jpg

JPG

Specs - Page 57.jpg

JPG

Specs - Page 82.jpg

JPG

Specs - Page 56.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 150.jpg

JPG

Specs - Page 304.jpg

JPG

Addendum #3 Plans - Page 17.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 251.jpg

JPG

Specs - Page 274.jpg

JPG

Plans - Page 1.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 250.jpg

JPG

Specs - Page 223.jpg

JPG

Specs - Page 214.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 234.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 88.jpg

JPG

Specs - Page 92.jpg

JPG

Addendum #1 Plans - Page 8.jpg

JPG

Specs - Page 201.jpg

JPG

Specs - Page 281.jpg

JPG

Specs - Page 24.jpg

JPG

Specs - Page 282.jpg

JPG

Specs - Page 86.jpg

JPG

Addendum #1 - Page 7.jpg

JPG

Specs - Page 198.jpg

JPG

Specs - Page 276.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 165.jpg

JPG

Specs - Page 244.jpg

JPG

Specs - Page 222.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 163.jpg

JPG

Specs - Page 239.jpg

JPG

Addendum #1 Plans - Page 9.jpg

JPG

Addendum #3 Plans - Page 10.jpg

JPG

Specs - Page 96.jpg

JPG

Specs - Page 34.jpg

JPG

Specs - Page 69.jpg

JPG

Plans - Page 12.jpg

JPG

Specs - Page 261.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 309.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 101.jpg

JPG

Addendum #1 Plans - Page 11.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 168.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 264.jpg

JPG

Specs - Page 301.jpg

JPG

Specs - Page 242.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 283.jpg

JPG

Specs - Page 235.jpg

JPG

Specs - Page 294.jpg

JPG

Specs - Page 179.jpg

JPG

Specs - Page 265.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Specs - Page 210.jpg

JPG

Specs - Page 87.jpg

JPG

Plans - Page 3.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 139.jpg

JPG

Specs - Page 167.jpg

JPG

Specs - Page 175.jpg

JPG

Specs - Page 230.jpg

JPG

Specs - Page 138.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 280.jpg

JPG

Specs - Page 141.jpg

JPG

Plans - Page 7.jpg

JPG

Specs - Page 326.jpg

JPG

Specs - Page 194.jpg

JPG

Specs - Page 226.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 200.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 79.jpg

JPG

Specs - Page 193.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 225.jpg

JPG

Specs - Page 314.jpg

JPG

Specs - Page 147.jpg

JPG

Specs - Page 54.jpg

JPG

Specs - Page 98.jpg

JPG

Specs - Page 184.jpg

JPG

Specs - Page 186.jpg

JPG

Addendum #3 Plans - Page 6.jpg

JPG

Specs - Page 277.jpg

JPG

Specs - Page 255.jpg

JPG

Specs - Page 134.jpg

JPG

Specs - Page 196.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 279.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 158.jpg

JPG

Addendum #1 Plans - Page 5.jpg

JPG

Specs - Page 330.jpg

JPG

Specs - Page 224.jpg

JPG

Specs - Page 78.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 344.jpg

JPG

Specs - Page 70.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Valley View Sewer District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → Valley View Sewer District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Interested Companies (19)

Show more
WSB Excavation & Utilities
WA, WA
Northwest Barricade
Everett, WA
Kar-Vel Construction
Renton, WA

See All 19 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This includes about 1,434 LF of 8-inch sewer mainline pipe, about 400 LF of 6-inch side sewer stub pipe, about 48 LF of 8-inch side sewer stub pipe, sixteen (16) each 8-inch x 6-inch tee and/or wye and five (5) 8-inch x 8-inch tee and/or wye connections for the 6-inch or 8-inch side sewer stub pipe which will extend from the 8-inch mainline pipe to right of way/property line, five (5) each manholes (MH) with the fiberglass (Predl) MH base at each, sawcut and removal of existing asphalt pavement and restoration. The contractor shall support and shore all existing utilities as needed when installing the new sewer pipe below the existing utility. All of this work will be typical open cut type of construction.
Pre-Bid Meeting: 7/9 @ 10:00 am at the Valley View Sewer District office

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS