Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Branford Water Storage Tank Replacement Project

Closed
North Branford Water Storage Tank Replacement ProjectState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The North Branford Water Storage Tank Replacement Project is an open solicitation for bids managed by the South Central Connecticut Regional Water Authority under the state of Connecticut. The bidding process follows a one-step unsealing procedure and is available for participation starting June 17, 2026, with a submission deadline of July 22, 2026, at 2:00 PM Eastern Time. The project is classified under NAICS code 237990, indicating it pertains to other heavy and civil engineering construction, and is categorized as a state, local, or educational (SLED) agency procurement. There is no set-aside designation specified, and no pre-bid meeting has been scheduled. All bids must be submitted in U.S. dollars, and interested parties must register through the designated portal to access full bid details, submit responses, or review questions and answers. The place of performance is in Connecticut, though the specific city is not listed, and official communications and documents are accessible via the provided online link.

General Info

North Branford water tank replacement bid opens June 17, 2026, closes July 22, 2026, via online portal in Connecticut.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Central Connecticut Regional Water Authority
ContactsNo contacts available
OfficeCT, USA
Office AddressCT, USA
ContactsNo contact information available

Full Description

Show more
Return to Bid List Bid NUMBER North Branford Water Storage Tank Replacement Project TITLE North Branford Water Storage Tank Replacement Project PROCESS One Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 22 days: 1 hours: 9 minutes: 37 seconds DESCRIPTION BIDDERS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER North Branford Water Storage Tank Replacement Project TITLE North Branford Water Storage Tank Replacement Project AVAILABLE DATE 6/17/2026 8:00 AM DUE DATE 7/22/2026 2:00 PM CONTACT INFORMATION BID TYPE Default Bid Type DESCRIPTION PRE-BID MEETING INFORMATION PRE-BID MEETING? PRE-BID MEETING DATE AND TIME PRE-BID MEETING LOCATION

More opportunities from South Central Connecticut Regional Water Authority

Same awarding agency

NAICS: 237110
SLED
Route 80 Control Valve Improvements – Phase 2
Solicitation # Route 80 Control Valve Improvements – Phase 2
The Route 80 Control Valve Improvements Phase 2 project involves the construction of a below-grade valve vault and associated infrastructure, including piping, a new access driveway, drainage and stormwater management systems, fencing, site lighting, and electrical and communications work. The scope of work further includes the installation of approximately 1,100 feet of 36-inch ductile iron pipe transmission main, 960 feet of 12-inch ductile iron pipe distribution main on Barnes Avenue, and a 36-inch tapping sleeve and valve on Quinnipiac Avenue. The project also covers temporary water mains and services, replacement water services, restoration, and the relocation of existing storm drainage and sanitary sewer service laterals. Eligible bidders must hold a current State of Connecticut Department of Administrative Services Prequalification Certificate in either Water Treatment Plants or Sewer and Water Lines. The contract is subject to Davis-Bacon and state prevailing wage requirements, as well as specific Minority and Women’s Business Enterprise subcontracting goals of 3.0 and 5.0 percent, respectively. A mandatory pre-bid meeting is scheduled for October 6, 2026, at 10:00 a.m. at 125 Barnes Avenue, New Haven, CT, requiring a written request for attendance by October 5, 2026. Bids are due by October 28, 2026, at 2:00 p.m.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in about 15 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS