Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on March 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Service Area (NSA) Chilled Water (CHW) Valve Replacement MVP-5 & MVP-6

Closed
ITB-08359State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the replacement of chilled water valves within MVP-5 and MVP-6, which are part of the future connections to the MK West Loop Chilled Water system from the Central Energy Plant. The scope includes demolishing existing valves and installing new valves, along with insulation and extensions to facilitate future maintenance. The work encompasses the addition or replacement of piping, valves, and related appurtenances, with all new components being coated and insulated per the contract specifications. The contractor is responsible for supplying all supervision, labor, materials, and equipment necessary to replace two 20-inch isolation valves in MVP-5 and two 16-inch isolation valves in MVP-6. Prior to starting work, the contractor must verify measurements within the valve pits, obtain any missing data, and coordinate with CFTOD Utilities Engineering to resolve discrepancies, documenting all findings as part of the as-built records. The project is solicited under the North Service Area (NSA) Chilled Water Valve Replacement for MVP-5 and MVP-6, with a response deadline of April 10, 2024. It is managed by the Central Florida Tourism Oversight District, a Florida-based organization, and falls under NAICS code 238910. The primary point of contact is Andrea Osinski, reachable via email or phone. The work will be performed in Florida, with detailed project information available through the Florida vendor marketplace.

General Info

Documents

1

C006561 North Service Area (NSA) Chilled Water (CHW) Valve Replacement MVP-5 & MVP-6

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCentral Florida Tourism Oversight District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The purpose of this scope of work is to replace chilled water valves located within MVP-5 and MVP-6, which serve as future connections to the chilled water system throughout the MK West Loop Chilled Water (“CHW”) main from the Central Energy Plant (“CEP”). Work includes the demolition of the existing valves and installing the new CHW valves. New valve insulation and extensions will be installed to facilitate future maintenance. The new valves and piping will be coated/insulated in accordance with the Contract Documents. Section of CHW piping, valves, and other appurtenances will also be added and/or replaced as part of this scope. The Contractor shall supply all supervision, labor, materials, and equipment required to replace two (2) existing 20" isolations valves (19S and 20R) within Mechanical Valve Pit MVP #5 and two (2) existing 16" isolations valves (2S and 1R) within Mechanical Valve Pit MVP #6. Prior to the commencement of work, the Contractor shall enter the valve pit, verify all measurements provided, obtain any and all measurements that were not provided, and compare all information obtained with the design documents. The Contractor shall work with Central Florida Tourism Oversight District (“CFTOD”) Utilities Engineering to resolve any differences, whether material or not, throughout the entire project. All information gathered shall be included as part of the Contractor's supplied as-builts.

More opportunities from Central Florida Tourism Oversight District

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS