Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Side Regulating Reservoir Solar Project

Closed
RFP #2024-034State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

21 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract pertains to the North Side Regulating Reservoir Solar Project, located in Stanislaus County, California, near the Oakdale City limits. The project involves installing a 500 KW photovoltaic solar system designed to reduce the energy consumption of the District by leveraging PG&E’s Renewable Energy Self-Generation Bill Credit Transfer program, which benefits local government entities. The solar system will be interconnected with PG&E’s distribution network at the Cottle 1702 circuit, serving approximately fifty PG&E service meters across the District. The project aims to utilize PG&E’s infrastructure and support the District’s sustainability goals by generating renewable energy on-site. The solicitation, identified as RFP #2024-034, was posted on November 25, 2024, with a response deadline of January 13, 2025. The contract size is estimated to be between one and three million dollars, reflecting the scope and scale of the solar installation. The project is managed by the Oakdale Irrigation District, a California-based agency, and is categorized under NAICS code 221114, which pertains to solar electric power generation. Interested parties can find additional details and submit responses through the provided public purchase link.

General Info

Agency

California → Oakdale Irrigation District

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Oakdale Irrigation District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Oakdale Irrigation District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Project is located in Stanislaus County, California, north of the Oakdale City limits southeast of the intersection of Twenty-Six Mile Road and Frankenheimer Road, as shown in Figure 1 – Vicinity Map and Figure 2 – Site Map. The proposed project includes the installation of a photovoltaic solar system to offset a portion of the District’s energy usage across approximately fifty (50) PG&E service meters located throughout the District. The project will utilize the Pacific Gas & Electric (PG&E) Renewable Energy Self-Generation Bill Credit Transfer (RES-BCT) program available to local government agencies such as the District. The District has requested a Generating Facility (GF) interconnection to the PG&E distribution system in 2023 for a 500 KW photovoltaic GF (Solar System) to be located at the Project Site. The Solar System will be connected to PG&E’s Cottle 1702 3-phase, 3-wire distribution circuit. More details are included in Project Description Section 00-1 of the Bid documents attached.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS