Notice of Award - Bonneville Powerhouse 1 Main Unit Breaker (MUB) Switchgear

Awarded
W9127N26CA022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract awards the procurement of ten custom-manufactured 15kV Main Unit Breaker Switchgear Assemblies for replacement at Bonneville Powerhouse 1 on the Columbia River, where the existing 80-year-old oil circuit breakers have become obsolete and non-maintainable. The new switchgear assemblies are designed to fit precisely within the existing spatial constraints at Elevation 65 and are based directly on the prototype developed and fully tested under a prior contract with Eaton Corporation, which serves as the Designer of Record. This procurement is strictly supply-only, meaning the contractor is responsible only for manufacturing, testing, and delivering the assemblies; all on-site removal of old equipment and installation of new units will be handled separately by Government personnel under different efforts. The deliverables include ten fully configured switchgear assemblies, detailed shop drawings complying with specified CDRL exhibits, and comprehensive factory inspection and test reports. The award, issued under solicitation W9127N26CA022 by the U.S. Army Corps of Engineers in Portland, Oregon, supports critical infrastructure modernization at the federally operated Bonneville Lock and Dam to ensure continued reliability of renewable energy production and regional grid stability.

General Info

Supply ten custom 15kV switchgear assemblies for Bonneville Powerhouse 1 replacement, no installation or labor included.

Agency

Department Of Defense → W071 Endist PortlandView Agency

Contract Value

$9,164,085.28

NAICS

335313 - Switchgear and Switchboard Apparatus ManufacturingView NAICS

Place of Performance

Cascade Locks, OR, 97014, USA

Set-Aside

NONE

Awardee

EATON CORPORATIONView Profile

Award Issued Date

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Organization / Agency
Department Of Defense → W071 Endist Portland
View Agency Profile
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts
Joseph B. Jarvis
Cory Pfenning

Full Description

Show more

1.0 Background


The Bonneville Lock and Dam is a federally operated hydroelectric facility located on the Columbia River, constructed in the 1930s. The facility plays a critical role in providing renewable energy, supporting regional navigation, and contributing to flood risk management throughout the Pacific Northwest.


This requirement supports the replacement of ten (10) existing Main Unit oil circuit breakers at Powerhouse 1, which are over 80 years old. The existing switchgear is obsolete, no longer maintainable, and presents a significant risk of operational failure.


Eaton Corporation serves as the Designer of Record (DOR) for this requirement under prior Contract No. W9127N-15-C-0002. Under that effort, Eaton designed, fabricated, and tested a prototype switchgear assembly, including full-scale design testing. This procurement leverages the previously developed and Government-accepted design and associated test data.


2.0 Objective


The objective of this contract is to procure, on a supply-only basis, new custom-manufactured switchgear assemblies to replace the existing obsolete equipment.


3.0 Scope of Work


The scope of this contract is limited to the manufacture, testing, and delivery of ten (10) new custom 15kV Main Unit Breaker Switchgear Assemblies. These assemblies, including draw-out circuit breakers and disconnect switches, shall be designed and manufactured to fit within the existing spatial constraints at Bonneville Powerhouse 1 (Elevation 65).


This is a supply-only contract. The scope does not include on-site labor, removal of existing equipment, or installation of the new assemblies. All installation and associated construction activities will be performed by Government personnel under separate efforts.


4.0 Tasks and Deliverables


CLIN 0001 – Main Unit Switchgear Assemblies
Provide ten (10) complete Main Unit Switchgear Assemblies identical to the prototype developed and tested under Contract No. W9127N-15-C-0002.


CLIN 0002 – Drawings
Develop and deliver shop drawings, including outline and assembly drawings, in accordance with CDRL Exhibits A through D.


CLIN 0003 – Reports
Develop and deliver factory inspection and test reports in accordance with CDRL Exhibit E.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 333914
New
Federal
LOP Fire Protection and Unwatering Pump System
Solicitation # W9127N26QA155
Solicitation W9127N26QA155 is a total small business set-aside for the procurement of a fire protection and unwatering pump system for the Lookout Point Powerhouse in Lane County, Oregon. Issued by the Department of Defense W071 Endist Portland, this firm-fixed-price requirement is necessitated by a deep reservoir drawdown that would otherwise disable critical service water and fire protection systems. The scope of work includes the delivery of a 650 GPM vertical pump/motor assembly, a 0.25 HP jockey pump system, a fire pump controller panel, overload protection, and various piping and fitting components. All equipment must meet AWWA E103 and HI 9.1-9.5 standards, with a delivery deadline of March 1, 2027, shipped FOB destination to Lowell, Oregon. The government will award a single purchase order based on an evaluation of technical compliance, past performance, and price, utilizing the HUBZone price evaluation preference. Offerors must be registered in the System for Award Management under NAICS code 333914 and submit a complete quote package via email to the designated point of contact. The solicitation underwent two amendments, with the final response deadline extended to September 11, 2026. Key contractual requirements include compliance with MIL-STD-129 for marking, DFARS cybersecurity and telecommunications regulations, and specific pump acceptance criteria according to HI ANSI/HI 14.6 grade 2B.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 334513
New
Federal
Lookout Point DGA supply and incidental install
Solicitation # W9127N26QA160
Solicitation W9127N26QA160 is a total small business set-aside for the purchase and installation of three online Dissolved Gas Analysis (DGA) monitoring systems for the main unit generator step-up transformers at the Lookout Point Powerplant in Jacksonville, Oregon. The contract is a firm-fixed-price award under NAICS code 334513, with the government evaluating quotes based on technical compliance, past performance, and price. The scope of work includes the delivery of the DGA monitors, incidental installation, necessary installation supplies, and eight hours of onsite training conducted by a manufacturer-approved instructor. The systems must be capable of measuring total dissolved combustible gas, total hydrocarbon, oil temperature, moisture-in-oil, ambient temperature, and nine specific gases, while supporting Modbus RTU and DNP3 protocols with RS-232, RS-485, and Ethernet interfaces. Key deliverables include a PC-based software package for remote data analysis and operation and maintenance manuals in both hardcopy and PDF formats. The contractor must provide an onsite field engineer or technician to lead installation, functional testing, and system verification, which must be coordinated with the Contracting Officer at least 14 days in advance. All items and services must be delivered FOB destination by March 1, 2027, with shipments restricted to normal business hours from Monday through Thursday. Additionally, the contractor must comply with specific security requirements, including OPSEC Level I and CUI training for personnel, and adhere to DFARS regulations regarding cybersecurity and the prohibition of covered defense telecommunications equipment.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

2 days ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 333415
New
Federal
Lookout Point Powerhouse Drawdown Transformer Cooling Water Supply
Solicitation # W9127N26QA125
Solicitation W9127N26QA125 is a total small business set-aside for the procurement of a new, FOB destination refrigerated closed-loop water chilling system for the Lookout Point Powerhouse in Lowell, Oregon. The system is required to maintain critical transformer cooling and fire protection during a scheduled reservoir drawdown from October to February that disables the facility's service water. The technical requirements specify a 20-ton (75 kW) system capable of circulating water at 120 gpm and maintaining a maximum cooled water temperature of 80 degrees Fahrenheit in ambient temperatures ranging from -20 to 120 degrees Fahrenheit. Key components include a 3 hp circulating pump, a maintenance tank of at least 100 to 200 gallons depending on configuration, and IP65 rated controls and sensors. The entire system must fit within a 20 by 14 foot horizontal area and include anchor points for concrete seismic anchorage. The contract is managed by the Department of Defense, specifically the Army Corps of Engineers Portland District. All equipment must be standard commercial cataloged products, and the successful contractor is required to provide one hardcopy and one electronic operation and maintenance manual. Delivery is required on or before March 1, 2027, with shipments restricted to Monday through Thursday between 7 am and 3 pm Pacific Time. Evaluation for award is based on technical compliance and past performance. The procurement incorporates various FAR and DFARS clauses, including requirements for System for Award Management registration, Buy American certifications, and specific military standards for marking and labeling such as MIL-STD-130 and MIL-STD-129. Invoicing and reporting must be conducted through the Wide Area WorkFlow system.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
Solicitation W9127N26BA024 is a total small business set-aside for the replacement of the Navigation Lock 1 Bridge at the Bonneville Lock and Dam in Cascade Locks, Oregon. The project involves replacing the existing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, and a sidewalk. The scope includes partial demolition of the existing bridge, construction of approach roadways, and the installation of a concrete stub abutment anchored into rock and a concrete abutment supported by drilled shafts. Due to the requirement that vehicular access remain open throughout construction, the project will likely be executed in phases. Additional technical requirements include lead and asbestos removal, working within environmental and seasonal restrictions, and performing barge crane lifting near high-voltage power lines. The procurement is managed by the USACE Portland District, with a project magnitude estimated between 10 million and 25 million dollars. Following several amendments, the solicitation closing date was extended to October 8, 2026. Bids must be submitted electronically in PDF format to the designated points of contact, as hard copies will not be accepted. Site visit attendees must be U.S. citizens and possess a Real ID for access. The contract includes specific regulatory requirements, such as the use of a professional archaeological monitor during ground disturbance and strict adherence to employment eligibility verification via Form I-9. Foreign contracting parties are subject to a 2 percent Federal excise tax withholding unless specific IRS documentation is provided.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS