Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NOTICE OF INTENT - Sole Source Johnson Controls Fire Detection and Alarm for the Chilled Water Plant Replacement and Utility Upgrades Project at the VA West Haven Campus

Closed
W912WJ26X1B67Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

West Haven, CT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts2 people available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
Contacts

Full Description

Show more

Under the authority of FAR 6.103-1, the U.S. Army Corps of Engineers intends to require, on a sole source basis, a brand name requirement for the Johnson Controls systems in the Chilled Water Plant Replacement and Utility Upgrades Project at the VA West Haven Campus.


The existing fire detection and alarm system on the VA West Haven campus is a Simplex-Grinnell (now Johnson Controls) system. All buildings on the VA West Haven campus with a building fire detection and alarm system are network-connected and integrated into the campus-wide Simplex-Grinnell (now Johnson Controls) system. The campus-wide system allows VA West Haven police, facilities, and other safety personnel to remotely monitor, manage, access, and control fire alarm devices for each building on campus connected to the campus-wide system. The new fire alarm system for the chilled water plant will be connected to this existing system. This will allow VA West Haven personnel to monitor this new system extension along with the remainder of the existing campus.  


The Simplex Grinnell (now Johnson Controls) fire detection and alarm system is a network of sensors, pull stations and other devices that provides the required infrastructure to provide patient & staff safety, as required by the National Fire Protection Association (NFPA) and the Joint Commission on healthcare safety. The system’s reliability is achieved by the proprietary nature of the network, which is common in the industry. For the system to work at an acceptable level of performance, fast, reliable communication among devices and annunciation of alarms must happen in seconds. When the new chilled water plant is constructed, the Simplex Grinnell system must be expanded to ensure proper coverage into the new space. This procurement will require the installation of the various equipment, including but not limited, to the following: fire alarm control panel(s), pull stations, wall- or ceiling-mounted strobes, wall- or ceiling-mounted speakers, wall- or ceiling-mounted combination speaker/strobes, monitor modules, control modules, duct smoke detectors with duct housing, sampling tube, and remote test stations, smoke detectors, heat detectors, etc. Device quantities may change as design develops. Part numbers are not included as they have yet to be determined and they may change based on delegated design submittals. As stated above, these devices are proprietary in nature and must be programmed and tested by a Simplex Grinnell employee.


If the Johnson Controls Fire Detection and Alarm devices are not sole sourced, then the fire detection and alarm systems for the new chilled water plant will not be connected to the campus-wide fire detection and alarm system, requiring the installation of a separate standalone system and a separate standalone monitoring station at all locations where this system is monitored. Communications interconnection will provide additional complication and require involvement from multiple system manufacturers to accomplish, if it is even possible. This will add additional complication to all future system modifications.


THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE PROPOSALS.  It is a market research tool being used to determine the availability of other qualified sources that can meet the requirements identified above and inherent with the referenced Johnson Controls system. The Government is not obligated to and will not pay for any information received from potential sources as a result of this notice of intent. All responses received within 15 days of the posting of this notice of intent will be considered by the Government. A determination by the Government to require the brand name for the Johnson Controls system for the VA West Haven procurement based on this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purposes of determine whether to allow alternate system manufacturers.


Submit responses within 15 days of the posting of this notice of intent via email to: tyler.s.maryak@usace.army.mil and CC erin.e.bradley@usace.army.mil (list "W912WJ26X1B67 – JCI Fire Alarm" in the subject line of the email).

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a Request for Quotations issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. This firm-fixed-price contract is a total small business set-aside under NAICS code 237310, with an estimated construction magnitude between $25,000 and $100,000. The project requires the contractor to provide all equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The period of performance is 210 calendar days from the notice to proceed, with work hours restricted to Monday through Friday, 7:00 AM to 3:30 PM. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit a comprehensive quote including technical documentation, price, and past performance from the last three years. Key safety and compliance requirements include adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer designation letter within 21 days of the notice to proceed. Fieldwork cannot commence until all submittals are approved. Award will be based on the most advantageous offer considering price, technical capability, and past performance. Payments will be processed electronically through the Wide Area WorkFlow system.
Highway, Street, and Bridge Construction

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Solicitation # W912WJ26RA008
Solicitation W912WJ26RA008 is a firm-fixed-price construction project for the Phase A2 Chilled Water Plant Replacement and Site Utility Upgrades at the VA Medical Center in West Haven, Connecticut. The scope includes the demolition of the existing chilled water plant and the construction of a new multi-story facility featuring chillers, cooling towers, pumps, and a new fuel tank farm. Site utility upgrades involve replacing fire protection and domestic water mains, creating utility main loops for chilled water, steam, condensate, and fire protection, and installing redundant electrical feeders and new water storage tanks. The project must adhere to DVA Physical Security Resiliency Design Requirements and is expected to achieve USGBC LEED Silver certification. Because the work occurs within an active medical campus, strict coordination is required to minimize operational impacts. The estimated contract value ranges from 75 million to 150 million dollars. Award is based on a best-value tradeoff process, with non-price factors—Past Performance, Management Approach, and Small Business Participation—combined being significantly more important than price. A minimum small business participation rate of 10 percent is mandatory for eligibility. Due to campus integration needs, the government has issued several justifications for other than full and open competition to require brand-name products from Johnson Controls, Siemens, and Assa Abloy, as well as specific SCADA programming services from AMAZ Consulting. Proposals must be submitted electronically via the PIEE solicitation module in both native and PDF formats.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bid invitation for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. This 100 percent small business set-aside project, under NAICS 237990, has an estimated value between 1 million and 3 million dollars. The scope of work involves the mechanical removal of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders to achieve a depth of -7 feet Mean Lower Low Water, with an allowable overdepth bringing the maximum depth to -8 feet. All dredged material must be transported and disposed of at the Flake Island Ocean Disposal Site, located approximately 0.9 nautical miles northwest of the project site. Performance is restricted to an environmental window between September 15, 2026, and March 1, 2027, to protect benthic resources and federally managed species. The contractor is required to maintain a production rate of at least 4,000 cubic yards every 30 calendar days, operating 24 hours a day and seven days a week. Award will be based on the lowest price for the total estimated amount of mobilization and dredging line items, with a 10 percent price evaluation preference for HUBZone small business concerns. Key requirements include the provision of performance and payment bonds, the submission of a Contractor Quality Control Plan, and the hosting of a partnering session within 45 days of award. All proposals must be submitted electronically via the Procurement Integrity Enterprise Environment portal.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 238290
New
Federal
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT
Solicitation # W912WJ27QA001
The U.S. Army Corps of Engineers New England District is soliciting quotes for the installation and commissioning of a new power system for the Dike B Operator unit at Mansfield Hollow Dam in Mansfield Center, Connecticut. This fixed-price project, estimated between $25,000 and $100,000, is a total set-aside for small businesses under NAICS code 238290. The scope of work includes site preparation, the construction of a reinforced concrete generator pad, installation of secure perimeter fencing, and the procurement and installation of a standalone propane-powered generator and fuel storage tank. Additionally, the contractor must perform final electrical integration into the existing sluice gate operator unit and control panel, including the installation of a 100 Amp NEMA 3R pedestal-mount panelboard and a 480V to 120/240V step-down transformer. The period of performance is 300 days from the Notice to Proceed, with work restricted to weekdays from 7:00 AM to 3:30 PM. All work must comply with the National Electric Code and the USACE Safety and Health Requirements Manual EM 385-1-1. To be considered responsive, vendors must have an active SAM.gov registration and submit a completed solicitation survey detailing their experience, certifications, and past performance from the last three years. Quotes are due by November 5, 2026, and will be evaluated based on technical capability, price, and past performance. Payment will be processed electronically through the Wide Area WorkFlow system.
Other Building Equipment Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS