Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Commerce was posted on August 25, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NOTICE OF INTENT TO SOLE SOURCE Microgrid Controller

Awarded
SB1341-17-RQ-1050Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Contract Value

$27,500

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

MD

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts1 person available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA

Full Description

Show more
SUBJECT: NOTICE OF INTENT TO SOLE SOURCE: Microgrid Controller DESCRIPTION: The United States Department of Commerce (DOC), National Institute of Standards and Technology (NIST), Acquisition Management Division (AMD) intends to negotiate a firm fixed price purchase order, on a sole source basis, with Eaton Corporation for the purchase of one (1) microgrid controller system shall include a system controller, two local controllers and an optional server with data historian and visualization to the mission for laboratory testing of the NIST microgrid power conditioning systems, interconnection equipment, other system-dedicated controllers, and Distribution Management System (DMS) controllers of the Physical Measurements Laboratory. The statutory authority for this sole source acquisition is FAR 13.106-1(b) by the authority of FAR Part 13 Simplified Acquisition Procedures. NIST currently has a need for one microgrid controller system shall include a system controller, two local controllers and an optional server with data historian and visualization for a modular and scalable control architecture, that is configurable to a variety of microgrid applications ranging for a small microgrid including only a solar inverter, battery energy storage and controllable load, to large feeder scale microgrids and microgrids that interoperate with Advanced Distribution Management System (OMS) control. This is needed for the purpose of NIST building a Smart Grid testbed that includes the ability to test microgrid power conditioning systems (PCS), interconnection equipment, and controllers. The microgrid test laboratory will use multiple power supplies to emulate AC and DC grid and load conditions and will also export power and information exchange to adjacent laboratories testing other interconnected Smart Grid devices and systems. To ensure these ranges can be completed a microgrid controller that is small enough to provide scalability to include large distribution feeders and inclusion, DMS are needed so the NIST small power supply of solar and battery operation can be used. The required items can only be offered by Eaton Corporation 7451 Coca Cola Drive, Suite C, Hanover, MD 21076-1490 via the Eaton Power Xpert Energy Optimizer Controller par number CAT# E-PXEO-MESG-0517A. Only Eaton Corporation can provide a controller that has small scale micro grid controllers provided scalability to include large distribution feeders and inclusion DMS. Market research indicated none of the large-scale microgrid controllers could be scaled down to be used in a simple microgrid that is currently in NIST's laboratory which uses just solar and battery power. In addition, no companies that deal with small microgrid systems, have been found to have capabilities of scaling up to large microgrid with DMS control. In addition to the scalability issue, the controller offered by Eaton is also the only product that is compatible with the other Eaton equipment in the Smart Grid lab. This equipment includes DMS switch gear and sensors, that if used with other company's equipment will not function properly. There is no other company that can provide the scalability needed to meet the Government's minimum specifications. Research has found that only one (1) company, Eaton, can meet the requirements as they are the only company capable of a controller with the required scalability. The North American Industry Classification System (NAICS) code for this acquisition is 335999, and the size standard is 500 employees. No solicitation package will be issued. This notice of intent is not a request for competitive quotations; however, all responsible sources interested may identify their interest and capability to respond to this requirement. The Government will consider responses received by 1:00 p.m. Eastern on September 8, 2017. Inquiries will only be accepted via email to contact@example.gov . No telephone requests will be honored. A determination by the Government not to compete the proposed acquisition based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement in the future.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 484230
New
Federal
Combined Synopsis/Solicitation for Spent Fuel Cell Shipment(s)
Solicitation # 1333ND27QNB610AMD
The National Institute of Standards and Technology Center for Neutron Research seeks a qualified contractor to provide packaging and shipping services for spent fuel elements from its facility in Gaithersburg, Maryland, to the Department of Energy Savannah River Site in South Carolina. This firm-fixed-price requirement consists of one base shipment of up to 84 fuel sections to be completed by December 31, 2028, and an optional second shipment of up to 84 fuel sections to be completed by December 31, 2030. The contractor is responsible for providing all project management, labor, and specialized equipment, including shipping casks, transfer casks, baskets, and necessary rigging and lifting machinery. All operations must strictly adhere to Nuclear Regulatory Commission, Department of Transportation, and OSHA regulations, with packaging activities monitored by NIST Health Physics representatives to ensure radiation exposure is kept as low as reasonably achievable. Award will be made to the lowest priced, technically acceptable quoter based on a technical evaluation of the proposed approach and price reasonableness. Quotations must be submitted in two volumes, covering technical capability and pricing, by November 23, 2026. The contract incorporates various federal acquisition regulations, including specific security prohibitions and requirements for custom-built lift safety factors.
Specialized Freight (except Used Goods) Trucking, Long-Distance

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236210
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

11 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS