This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on June 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract, issued by the USDA Natural Resources Conservation Service for streambank stabilization at Dixon and McGraw’s Run in Ohio County, West Virginia, is a sealed bid solicitation resulting in a Firm Fixed Price award under a Total Small Business Set-Aside. The work involves comprehensive erosion control and channel stabilization including clearing vegetation and debris, shaping stream channels, installing geotextiles and rock riprap, placing gabions, excavating and placing earthfill and rockfill, seeding, mulching, and applying soil amendments across three designated sites. All work must comply with detailed Construction Specifications, including strict handling and labeling requirements for geotextiles per ASTM D4873, and must be performed in accordance with established specifications numbered 4 through 95, covering everything from water removal and traffic control to quality control and material documentation. The project requires full mobilization and demobilization, temporary water control systems with pumps and channels, and adherence to safety standards under OSHA 29 CFR Parts 1910 and 1926, as well as the U.S. Army Corps of Engineers EM 385-1-1 manual. A written safety program must be submitted and approved prior to work commencement, and all employees must be physically qualified, with hoist and motor vehicle operators subject to additional certification and licensing requirements. Bidders must submit complete pricing for all line items across seeding, mobilization, rock riprap, gabions, and foundation preparation, with failure to bid on any item resulting in disqualification. The Government reserves the right to reject materially unbalanced pricing and will select the awardee based solely on lowest price. The project must be completed within 36 days after Notice to Proceed, with no work permitted on federal holidays except in emergencies. All bids must be emailed to mark.domingo@usda.gov by June 18, 2026, including a fully executed SF-1442, bid bond of 20% of the bid amount, and required certifications. Successful offerors must provide performance and payment bonds on SF-25A and register in SAM with a valid UEI. Invoices must be submitted electronically via the Treasury’s IPP system, accompanied by detailed itemization, subcontractor payment summaries, and certifications, with final payment requiring a release of claims. The Contracting Officer is the sole authority for contract modifications, and the Contracting Officer’s Representative has no authority to obligate funds or make binding decisions. All work is subject to Government
General Info
Agency
Contract Value
$491,331.8NAICS
Place of Performance
WV, USASet-Aside
Awardee
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
Please see Attachment 1 Specifications documents for full details of services requried.
USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run
A site visit will be held on date May 28th, 2026 at 10:00am ET on that day.
Attendees will meet at: Valley Grove Community Center
8566 National Road
Valley Grove, WV 26060
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.
*See Specifications document attached to posting for full details of required work.
More opportunities from Department Of Agriculture → Fpac Bus Cntr-Acq Division
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS