Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run

Active
12FPC326B0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves streambank stabilization work on Dixon and McGraw's Run in Ohio County, West Virginia, under the USDA Natural Resources Conservation Service (NRCS) Emergency Watershed Protection (EWP) program. Key activities include clearing designated areas by removing trees, logs, stumps, shrubs, brush, and rubbish, shaping the channel, and implementing erosion control measures to reduce sediment and pollutant runoff during construction. The work further involves preparing the site by furnishing and placing seeds, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments to stabilize the area, along with anchoring mulch as specified. Mobilization and demobilization of equipment and personnel, traffic control to ensure public road safety, managing surface and groundwater via temporary containment and pumping systems, excavation, and construction of earth embankments and backfills are also essential components. A site visit is scheduled for May 28, 2026, at 10:00 am at the Valley Grove Community Center in Valley Grove, WV, to provide interested contractors an on-site overview. This contract is a total small business set-aside, with a response deadline of June 18, 2026, and falls under the NAICS code 237990 for heavy and civil engineering construction. The Department of Agriculture's FPAC Business Center Acquisition Division in Washington, DC, manages the solicitation, and Mark Domingo serves as the primary point of contact. Full specifications and detailed work requirements are contained in an attached document referenced in the contract posting.

General Info

Streambank stabilization in Ohio County, WV; erosion control, site prep, excavation; small business set-aside.

Agency

Department Of Agriculture → Fpac Bus Cntr-Acq Division

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

WV, USA

Set-Aside

SBA

Documents

(6)

Attendance Sheet for Ohio County EWP 5090-001 & 003 Streambank Stabilization

PDFother

Dixon and McGraw Run Construction and Material Specifications June 2024

PDFspecifications

Solicitation 12FPC326B0011 Site Showing Q&A

PDFq-and-a

Solicitation 12FPC326B0011 Ohio County EWP Streambank Stabilization

PDFifb

Attachment 2 Drawings Dixon and McGraw Run

PDFdrawings

Wage Determination WV20260073 for Ohio County Heavy Construction

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseCombined Synopsis
Posted

Combined Synopsis

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Fpac Bus Cntr-Acq Division
Contacts1 person available
OfficeWASHINGTON, DC, 20250, USA
Organization / Agency
Department Of Agriculture → Fpac Bus Cntr-Acq Division
Office AddressWASHINGTON, DC, 20250, USA
Contacts

Full Description

Show more

Please see Attachment 1 Specifications documents for full details of services requried.


USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run



A site visit will be held on date May 28th, 2026 at 10:00am ET on that day.


Attendees will meet at: Valley Grove Community Center


8566 National Road


Valley Grove, WV  26060



The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.


Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.


Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.


The work consists of the mobilization and demobilization of the contractor’s forces and equipment necessary for performing the work required under the contract.


Establishing traffic control and maintaining safe, convenient use of public roads and right of way.


Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.


Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.


Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications.


*See Specifications document attached to posting for full details of required work.

Similar Contracts