NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road

Active
12FPC326B0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves a streambank stabilization project in Ohio County, West Virginia, specifically targeting areas around Sharon Hollow and Ohley Hollow Road for the USDA Natural Resources Conservation Service. The scope includes clearing vegetation such as trees, stumps, and brush, shaping the stream channel, and implementing erosion control measures to reduce sediment and pollutants in water and air during construction. The work also requires preparing the site for treatment by applying seed, mulch, fertilizer, and other soil amendments, with proper anchoring to ensure environmental protection. The contractor is responsible for mobilizing and demobilizing equipment and personnel, establishing traffic control, and maintaining safe access on public roads. Essential water management activities include the construction and maintenance of temporary water containment and diversion structures, the operation of pumps and other equipment, and the removal of these temporary installations after use. Additionally, excavation and disposal of materials, along with constructing earth embankments and backfills as per specifications, are required. The contract is a total small business set-aside under NAICS code 237990, with a response deadline of June 17, 2026. The work is managed by the Department of Agriculture's FPAC Business Center Acquisition Division in Washington, D.C., with Mark Domingo as the primary contact.

General Info

Streambank stabilization in Ohio County WV includes vegetation removal, erosion control, seeding, and water management.

Agency

Department Of Agriculture → Fpac Bus Cntr-Acq Division

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

WV, USA

Set-Aside

SBA

Documents

(14)

Wage Determination WV20260069 for Kanawha County Heavy Construction

PDFwage-determination

IFB 12FPC326B0010 Kanawha County EWP Streambank Stabilization

PDFifb

Sharon Hollow Rd Streambank Stabilization Construction Notes and Quantities

PDFsow

WV EWP 2025 Kanawha County Streambank Stabilization Construction Specifications

PDFconstruction-specifications

Wage Determination WV20260073 for Ohio County Heavy Construction

PDFwage-determination

Solicitation 12FPC326B0010 Q&A for Sharon Hollow Road and Ohley Hollow Road EWP

PDFq-and-a

Sharon Hollow Rd Streambank Stabilization Construction Notes and Quantities

PDFsow

WV EWP 2025 Kanawha County Streambank Stabilization Construction Specifications

PDFconstruction-specifications

IFB 12FPC326B0010 Kanawha County EWP Streambank Stabilization

PDFifb

Ohley Hollow Road Streambank Stabilization Drawings

PDFdrawings

Ohley Hollow Road Streambank Stabilization Drawings

PDFdrawings

IFB 12FPC326B0010 Kanawha County EWP Streambank Stabilization

PDFifb

Solicitation 12FPC326B0010 Ohio County EWP Streambank Stabilization IFB

PDFifb

Solicitation 12FPC326B0010 Kanawha County WV 2026 Site Visit Sign-in Sheet

PDFsign-in-sheet

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseCombined Synopsis
Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Posted

Combined Synopsis

Amendment 0

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Fpac Bus Cntr-Acq Division
Contacts1 person available
OfficeWASHINGTON, DC, 20250, USA
Organization / Agency
Department Of Agriculture → Fpac Bus Cntr-Acq Division
Office AddressWASHINGTON, DC, 20250, USA
Contacts

Full Description

Show more

See changes to Ohley Hollow Rd. Drawings and to Specification document - updated 6/15/2026.


Changes to the Ohley Hollow Road Drawings:


  • Note showing the potential that an abandoned septic tank (unknown location) may be encountered and will need to be decommissioned if it is disturbed.
  • Note showing the location of a pet cemetery and to avoid this location.
  • Note showing a temporary fence must be constructed between the corner of the house and the fence along the road.


Changes to the specs:


Seeding Spec:


  • Added a different seed mixture for the Ohley site.
  • Added note showing the maximum rock size shall be ½” in top 1-1/2” where the special seedbed preparation is required.
  • Added note specifying compacted and disturbed areas must be loosened and blended into adjacent area to remove depressions.

Mob Spec:


  • Added procedure for decommissioning an abandoned septic tank if one is disturbed.
  • Added requirement to remove concrete from chain link posts if they are going to be reused.
  • Added requirement that temporary fence must be constructed at the Ohley site


Please see attachments and comibined synopsis solicitaiton for further deatails.


Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV.


The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and
other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and
other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment
necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the
contract in accordance with the specifications. It must include: (1) constructing, installing, building, and
maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing,
installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3)
removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and
specifications.



*See Specifications document attached to posting for full details of required work.