Y--MRG LSARI PROJECT DESIGN-BUILD CONTRACT

Closed
140R4026R0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Middle Rio Grande Lower San Acacia Reach Improvements Project is a design-build initiative led by the Department of the Interior’s Upper Colorado Regional Office to enhance water conveyance to Elephant Butte Reservoir, improve sediment management, stabilize the river channel, expand floodplain inundation, and restore critical habitat for endangered species. The project is structured in three distinct phases: design, construction, and post-construction services. Phase One involves comprehensive engineering, topographic and geotechnical data collection, environmental and cultural compliance, permitting, and development of the construction price and schedule. Phase Two entails the physical construction of approximately 15 miles of new river channel alignment, including major earthwork, excavation, channel shaping, installation of riprap and a flow control structure, construction of temporary and permanent access roads, and management of water diversion during construction. Phase Three includes acceptance testing, training for Bureau of Reclamation staff, completion of as-built documentation, and 36-month revegetation monitoring. The project must maintain uninterrupted water flow through the Rio Grande and Low Flow Conveyance Channel throughout all phases. All work must adhere to strict environmental, cultural, and safety regulations, including compliance with NEPA, NHPA, ESA, OSHA standards, ADA/ABA accessibility guidelines, and Section 508 for digital accessibility. Contractors must coordinate with multiple federal and state agencies for permits including Section 404, 401, and 408 reviews, and submit a site-specific safety program aligned with Reclamation Safety and Health Standards. The procurement is currently underway as a Sources Sought Notice with a submission deadline of July 2, 2026, and is being managed through SAM.gov under solicitation number 140R4026R0019. Offerors must be registered in SAM.gov and provide their Unique Entity Identifier, business classification, and bonding capabilities. Proposal submission must include an experience statement detailing past performance as a prime contractor on similar projects, with descriptions of three to five relevant projects including size, scope, contract value, and percentage of work performed, but no pricing is required at this stage. Pricing will be requested in a subsequent RFP phase. The contract will be awarded based on best value, combining technical merit and price, with technical acceptability being a mandatory gate—failure to meet submission requirements will result in disqualification. Key contractual terms include clauses on default, inspection of construction, site investigations, suspension of work, and hazardous material identification with Alternate 1. Contract administration

General Info

Middle Rio Grande project seeks design-build contractors; informational only, response due June 25, 2026.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

UT

Set-Aside

NONE

Documents

5

SOO LSARI Design-Build Statement of Objectives 6-10-2026

DOCX, High priority: read this firststatement-of-objectives
High

140R4026R0019 - Amended Sources Sought Notice for LSARI Design-Build Project

DOCX, Low prioritysources-sought
Low

140R4026R0019 - Sources Sought Notice for LSARI Design-Build Project

DOCX, Low prioritysources-sought
Low

140R4026R0019 - Sources Sought Notice for LSARI Design-Build Project

DOCX, Low prioritysources-sought
Low

140R4026R0019 - Sources Sought Notice for LSARI Design-Build Project

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 25, 2026 to Jul 2, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA
Office AddressSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
Second Amendment to Sources Sought Notice for the Middle Rio Grande Lower San Acacia Reach Improvements Project Design-Build Contract. Please see attached corrected amended Sources Sought Notice for more information.

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
Solicitation 140R4026R0025 is a total small business set-aside for the East Canal Efficiency Improvements project on the Uncompahgre Project in Delta County, Colorado. Managed by the Department of the Interior's Bureau of Reclamation, Upper Colorado Regional Office, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically the installation of approximately 170 feet of parallel 54-inch HDPE pipe for a double barrel siphon, as well as 48-inch and 42-inch polypropylene profile wall piping. Additional requirements include the construction of concrete hydraulic structures, metalwork for diversion pipeline inlets, flow measuring equipment installation, earthwork, and clearing and grubbing. Work is subject to seasonal restrictions tied to irrigation shutdown and startup dates to avoid interference with agricultural operations. The period of performance is scheduled from January 25, 2027, to November 1, 2028, with performance required to begin within 21 days of award. Proposals are due by November 20, 2026, and will be evaluated based on a best value cost/technical tradeoff process considering technical approach, construction schedule, project team composition, past performance, and price. Awardees must provide performance and payment bonds within 10 calendar days of award and maintain liability insurance for work on government installations. Invoicing must be processed through the Invoice Processing Platform (IPP). The project is governed by FAR 52.246-12 for inspection of construction, with final acceptance occurring only at the jobsite after successful installation and testing.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Department of the Interior, Bureau of Reclamation, is seeking a firm-fixed-price contract for professional technical services to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The scope of work includes resolving information security and privacy weaknesses identified in the Plan of Action and Milestones, updating system documentation, and restoring communication links with the Navajo Tribal Utility Authority Escrito Mesa data concentrator. There is also an optional requirement for the programming and integration of the new DZ Booster Pump Station. The project requires the contractor to provide project management, a Quality Control Plan, and a Communication Plan while ensuring that critical water treatment processes remain uninterrupted. This is a sole source procurement under FAR 6.103-1 and FAR 12.201-1, with Jacobs Engineering identified as the uniquely qualified firm due to their prior design, construction, and operational knowledge of the facility. The base period of performance is from November 30, 2026, to May 30, 2028, with the optional booster plant integration scheduled from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer considering price and technical capability, though technical and past performance factors are weighted as significantly less important than cost.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

9 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--Turnout Buildings
Solicitation # 140R4026B0002
Solicitation 140R4026B0002 is a sealed bid Invitation for Bid issued by the Bureau of Reclamation for the construction of potable water delivery turnout buildings and associated improvements as part of the Navajo-Gallup Water Supply Project in northwest New Mexico. The project, estimated between $18 million and $23 million, involves work at seven sites, including Sanostee, Newcomb, and Naschitti. The scope of work encompasses the installation of precast concrete buildings and foundations, buried piping, valves, fiberoptic infrastructure, and controls integration with existing SCADA systems. Additional site improvements include gravel surfacing, steel fencing, and access roads for specific locations. The period of performance is scheduled from December 16, 2026, to April 16, 2029. The contract is a small business set-aside under NAICS code 237110. Award will be granted to the responsible, compliant offeror with the lowest total bid price, calculated across seven price schedules excluding certain taxes. Key contractual requirements include strict adherence to Davis-Bacon Act wage determinations for San Juan and McKinley Counties, compliance with the Americans with Disabilities Act, and the submission of a Small Business Subcontracting Plan. The contractor is responsible for quality control and geotechnical investigations, while the government maintains quality assurance. Failure to complete the work within the specified timeframe will result in liquidated damages of $4,536.00 per calendar day. Bids are due by November 10, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 13 days
View Details
NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS