Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

NSA NH-95 COMMAND CENTER SECURED BOUNDRY UPGRADE

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Mid-AtlanticView Agency

NAICS

N/A

Place of Performance

ML: NORFOLK, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Demolition Acoustic panels on all boundary walls and acoustic foam on ceiling. Gypsum boards on boundary walls (down to metal studs and insulation installed on concrete) Emergency exit doors. Install Additional boundary wall with double doors (entrance and exit) to include security hardware. 3 Layers gypsum board on boundary walls. RF shielding in between gypsum boards 1 and 2 and installed along entire parameter boundary as per ICD-705. Acoustic panels on boundary walls and acoustic foam on ceiling. Protective barrier between RF shielding and true floor. Emergency exit doors and security hardware and gasketing. 2 deadbolts on roll-up door (2126-2130) Modify Controls for frosted windows from 2220 and 2221 to baloneys of 2125 and 2126 respectively. Permanent frosting on windows from 2224 into 2126 installed within 2126. SOW and Cost Estimate and design start in FY24 with Execution in FY24 funded by FF FY26 Design and FY27 Execution