Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 18, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nuclear Pipewelders for Portsmouth Naval Shipyard

Closed
N39040-16-R-0172Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 13 hours ago

DEADLINE

in 24 days
NAICS: 336611
New
Federal
USCGC CROCODILE DD2 FY27 #1 MDE W5
Solicitation # 70Z08027PBPLCROCODILE
The Department of Homeland Security, through the U.S. Coast Guard Surface Forces Logistics Center, has issued a Sources Sought Notice under solicitation number 70Z08027PBPLCROCODILE to conduct market research for drydock and dockside repairs to the USCGC CROCODILE (WPB-87369). This notice is intended to identify capable sources, determine the availability of suitable commercial items, and understand current commercial practices to inform future competition and set-aside decisions. The anticipated scope of work includes 34 specific items, such as Main Diesel Engine W-5 maintenance, propulsion shaft and rudder assembly renewal, 100 percent underwater body and hull plating preservation, tank cleaning, and the provision of drydocking and sea trial support. The anticipated period of performance is 63 calendar days, scheduled from April 20, 2027, to June 22, 2027. All work is to be performed at the contractor's facility with no geographical restrictions. Interested firms under NAICS code 336611, which has a size standard of 1,300 employees, must submit capability statements, business size certifications, and past performance information by October 21, 2026. This notice does not constitute a formal solicitation or an obligation for the government to take further action, and potential offerors are advised to monitor Sam.gov for any future solicitations.
CG-SEA-C21

POSTED

about 16 hours ago

DEADLINE

in about 11 hours

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Portsmouth Naval Shipyard, KITTERY, ME, 03908, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Portsmouth Naval Shipyard Gf
Contacts2 people available
OfficePORTSMOUTH, NH, 03801-5000, USA
Office AddressPORTSMOUTH, NH, 03801-5000, USA
Contacts
Patricia M. PerkinsContract Specialist

Full Description

Show more
The Naval Sea Systems Command (NAVSEA) intends to issue a delivery order under Basic Ordering Agreement N00024-14-G-4300 and/or N00024-14-G-4301 for nuclear Pipe Welders to support Portsmouth Naval Shipyard. These pipe welders are available only from the two nuclear-qualified shipyards, Electric Boat Corporation and Huntington Ingalls Industries - Newport News Shipbuilding. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with one or a limited number of sources under the authority of FAR 6.302-1. Interested persons may identify their interest and capability to respond to this requirement. This notice of intent is not a request for competitive proposals. The notice is for informational purposes only to determine availability of pipe welders to support Portsmouth Naval Shipyard requirements during the period from 06 September through 16 December 2016. Solicitation documents are not available at this time. A determination of the Government not to compete this proposed contract action based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. A detailed description of the requirements follows: Requirement for Pipe Welders 1. General: Portsmouth Naval Shipyard requires Pipe Welders to accomplish nuclear related work at Portsmouth Naval Shipyard 1.1. The offering shall be as a "non-personal services contract" as defined in FAR 37.101. Therefore, it is understood and agreed that the Contractor and/or the Contractor's employees: (1) shall perform the services specified herein as independent Contractors, not as employees of the Government; (2) shall be responsible for their own management and administration of the work required and are fully responsibility for complying with any and all technical, schedule, or financial requirements of constraints attendant to the performance of this contract; (3) shall be wholly responsible for the quality and timeliness of the services provided ; but (4) shall, pursuant to the government's right and obligation to inspect, accept or reject the work, comply with such general direction of the Contracting Officer or the duly authorized representative of the Contracting Officer as is necessary to ensure accomplishment of the contract objectives. 2. Level of Effort by Functional Requirements: PNS requires Pipe Welders from 1 August 2016 through 16 December 2016 as shown in the table below. Task performance will be accomplished in accordance with Paragraph 3, Descriptions and Specifications. Title # Shift Est. Start Est. Complete Total # Work Days Straight Time Hours Over time Hours Period of Performance Pipe Welders 6 AM 6 Sep 2016 16 Dec 2016 70 3,360 960 Pipe Welder Sup 1 AM 6 Sep 2016 16 Dec 2016 70 560 160 Straight Time Hours = 3,920 Base Overtime Hours = 1,120 All Hours = 5,040 "Total # Work Days" is number of days Monday through Friday, not including Federal Holidays 3. Scope of Specific Tasking: The contractor's Pipe Welders and Supervisor will be working onboard nuclear powered submarines at Portsmouth Naval Shipyard. Work tasks will include Pipe Welding duties, in particular Socket welds. 4. Period of Performance. 6 September through 16 December 2016. 5. Descriptions and Specifications: 5.1. All contractor personnel must have at least 2 years of experience in pipe welding in ship building/ship repair. 5.2. All contractor welders must Qualified per Technical Publication S9074-AQ-GIB-010/248, hereafter referred to as ref (a), with the following essential elements: 5.2.1. Welder Qualification records verifying tests performed in two (4F and 5F) positions. No dual process qualifications will be accepted. The welder qualification test records shall include at least the following information: 5.2.1.1. Welder Identification (Full Name with badge number or last 5 of SSN) 5.2.1.2. Date of test 5.2.1.3. Qualification test number, as applicable, with nominal pipe thickness or pipe schedule number used 5.2.1.4. Qualification test process (GTAW) 5.2.1.5. Qualification test position (4F and 5F) 5.2.1.6. Qualification test base material type 5.2.1.7. Qualification test filler material type and size 5.2.1.8. Qualification test results, including VT, PT and metallography 5.2.1.9. Record of omission of space restriction when not used in pipe tests (i.e.-if no restriction used it shall be documented) Note: restricted tests are required for this contract. 5.2.1.10. Certifying signature (fabricator, test administrator or quality assurance officer attesting to test conditions and results)5.2.2. The welder qualification test shall be performed as follows: 5.2.2.1. The qualification testing shall have been performed per ref (a), para. 5.3.5.1(d) utilizing a P-13 or P-14 joint design from MIL-STD 22 5.2.2.2. The filler material to be used during testing should be MIL-3XX series, 70S-X series, RN-67 and either RN-60 or RN-82 for the GTAW process. Qualifications to be granted based on filler materials used and current needs. 5.2.2.3. The Qualification Tests shall be non-destructively evaluated IAW with the requirements contained in S9074-A-GIB-018/248 {performed IAW T9074-AS-GIB-010/271, (Mil-Std 271) and evaluated to class 1 requirements of MIL-STD 2035}. Qualification tests shall be destructively evaluated IAW with ref.(a) and AWS B4.0 with acceptance standards derived from ref.(a) Qualification tests shall be evaluated visually (VT); by dye penetrant (PT) and metallographically (DT). 5.2.3. The qualifications shall have been maintained by actual use of the welding process quarterly (evidence of maintenance for process use shall be maintained for the current and preceding quarter) 5.2.4. The welder shall have Jaeger J-1 or equivalent Annual Vision certification (glasses or no glasses) for near vision acuity 5.2.5. The welders will have to undergo training to self-identify and correct poor workmanship for both structural and piping applications. This training is a 20 hour course for each application that includes a written and practical examination. A grade of 80% or better is required on each to be considered passing. If a contractor fails to achieve a grade of 80% or better, he will be rejected as not qualified to fulfill the requirements of this contract. 5.2.5.1. As an alternative, if a vendor has a training program in place that aligns with the requirements of ref(a); this training is documented on individual contractor records and code 900T and/or the welding shop management believes the knowledge base is adequate, then a briefing only may be given for each application covering any differences between the vendor training program/documents and the Portsmouth Naval Shipyard program/documents. 5.2.6. Vendor shall provide to Portsmouth Naval Shipyard welder qualification department (C138) at least 1 week prior to scheduled welder arrival either of the following: 5.2.6.1. individual welder qualification records; vision records; workmanship training records; process maintenance/update records, etc. for each welder 5.2.6.2. a memo/letter signed by the head of welding engineering or equivalent authorized representative stating that all personnel were qualified per ref.(a); all personnel satisfactorily passed applicable workmanship course(s) required by ref.(a); and that process maintenances/updates were performed per ref.(a) and are current through a specified date. An attachment/enclosure to this memo/letter shall show all applicable welders with their identification numbers; their need for glasses or not with expiration dates; qualifications they've taken showing processes, base materials, filler materials, test numbers, and positions qualified to; and any other applicable expiration dates for items such as workmanship or maintenances that are not shown on the memo/letter cover page. 5.2.7. Contractor personnel shall be radiologically qualified to at least an Radiation worker standard ("R" qualified) 5.3. All Contractor personnel shall be citizens of the United States of America and possess a final adjudicated, confidential clearance (PNS Red-Badge) prior to commencing work. Completion of DD 254 will be required. 5.4. The Contractor is responsible for providing proof of qualification (classroom theory and practical knowledge) required by this work statement. Qualifications must be current through the performance period and verifiable by PNS. The Contractor will be required to verify via a signature on a training roster to certify that each personnel assigned to perform the contracted scope of work meets the minimum trade skill requirements. 5.5. In addition to the NAVSEA 389-0288 training requirements, the Contractor shall provide verification that personnel have been trained (by the contractor) in asbestos and industrial hazards awareness, Occupational Safety & Health (OSH), sexual harassment, proper use of personal protective equipment (e.g., hearing conservation and eye safety), and hazardous communications (e.g., MSDS sheets). 5.6. Contractor Orientation Briefings: Before accomplishing any work on board Navy ships at PNS. PNS will provide the following training, some of which includes testing. 5.6.1. Level 1 Weld Wire Issue 5.6.2. PNS 6010 training 5.6.3. Safety and Environmental 5.6.4. Hot Work/Firewatch (Gap Training) 5.6.5. WP 278/1688 5.6.6. Local PNS RADCON Requirements (Gap Training) 6. Workforce Management Requirements: 6.1. The contractor shall accomplish Pipe Welding tasks using PNS technical work documents, and comply with all PNS safety rules and regulations. 6.2. PNS shall determine the priority of all work. 6.3. The Contractor's supervisor shall provide oversight and direct supervision of the Contractor's workforce accomplishing the work tasks. 6.4. Work assignments to the Contractor shall be designated via PNS POCs to designated Contractor supervision for dissemination to the Contractor's workforce. 6.5. Hours of Work: The Contractor shall observe the same holidays as the Government. It is anticipated the normal task hours assigned will be worked during a five-day work week (Monday - Friday) on a eight (8) hour per shift (i.e. 0700-1530). Some work evolutions will require week day extended shifts. Some Saturday and Sunday overtime work will be required. 6.6. The Contractor will not be required to perform work that violates any current negotiated agreements between the Contractor and their respective labor union(s). Concerns with the tasks, shifts or hours-of-work specified in this notice, or any other terms, shall be brought to the attention of the Contracting Officer within the contractor's response to this requirement. 6.7. Conflict resolution, disciplinary and/or administrative actions affecting the Contractor's employees shall be the responsibility of the Contractor's management. In the event of a workmanship or execution problem, the contractor shall participate in the management problem analysis process that seeks to determine the cause of that workmanship or execution problem. 6.8. PNS agrees to provide workspaces for Contractor employees assigned to PNS. 6.9. The Contractor shall be responsible to manage lodging and travel for their personnel (as applicable). 6.10. The Contractor shall be required to submit a summary timesheet listing all employees and hours worked for the period on a weekly basis to the COR POC TBD (207-438-xxxx). 6.11. All quality assurance services and engineering support required in the assigned tasking will be provided by PNS. 7. Special Requirements: The contractor is responsible for: 7.1. Contractor workforce safety and compliances with all PNS safety rules and regulations. 7.2. PPE: The Contractor shall supply all PPE in accordance with Occupational Safety and Health Administration (OSHA) Standards. The PPE shall include but is not limited to: Steel-toed shoes, safety glasses, hard hats, earplugs and muffs, and flashlights. 7.3. In the event of injuries sustained in the performance of duty, the contractor employees may receive medical aid from shipyard first responders but shall, if necessary, receive secondary aid and/or evaluation from private providers in the community. 7.4. Injury reporting: Contractor management shall inform the PNS Contracting Officer Representative (COR) of any injuries to contractor personnel as soon as contractor supervision or management becomes aware of the occurrence. In addition, a written report will be submitted to the PNS Contracting Officer Representative within 24 hours of occurrence. The report shall contain the name of each injured person, date and time of incident, extent of each personal injury or property damage, contractor/sub-contractor name, type of incident, location of event (ship name and hull number, space, compartment), and a brief description of the event. The contractor shall cooperate with any safety investigations. 7.5. The Contractor shall be responsible to comply with all environmental, hazardous waste, and safety requirements and to report any issues to PNS Technical POC: Dan Ringlein (207-438-5089). 8. Security and Access Requirements: 8.1. At a minimum, all personnel shall be United States citizens and shall possess a Department of Defense final-adjudicated Personal Security Clearance at the confidential level or higher, in accordance with Attachment B (DD Form 254) for performance on this contract. Failure of ability to obtain a PNS red badge will be cause to dismiss personnel from fulfilling this contract. 8.2. Contractors must have Rapid Gate credentials for access to Portsmouth Naval Shipyard. Contractors and any subcontractors must submit contract DD-254 to Portsmouth Naval Shipyard Security Department Code 1700 for access requirement verification prior to arrival. 8.3. Contractors/subcontractors shall submit Visit Requests via the Joint Personnel Adjudication System (JPAS) to SMO 39040 for visitor clearance verification. Visit requests submitted by other means will not be accepted without Facility Security Officer signed verification as to the level of security clearance granted to each employee on the visit request. Additionally, the contractor must provide a copy of Visit Request to Dan Ringlein - Code 105 (Fax 207-438-1735) at least 2 weeks prior to personnel traveling for inclusion into other PNS IT systems. 8.4. Immediately notify the Security Officer, and the Contracting Officer of any access problems. Failure to do so shall result in a delay at the Contractor's expense. 8.5. Lack of proper I.D. badge shall result in denial of access to the Naval Installation, and/or the ship, resulting in a delay at the Contractor's expense. 8.6. Contractor employees are authorized to retain temporary badges until the badge expiration date, or termination of employment. Holders are required to return the badge to the respective Naval Installation Pass & ID Office. 8.7. Badges must be displayed on the outermost garment above the waist at all times. The only exception will be if the Contractor employee is engaged in work that could cause a safety hazard if the badge were worn while performing the work. 8.8. Lost or misplaced badges must be reported immediately to the PNS Technical POC Dan Ringlein (207-438-5089). 9. Technical Work Instructions: 9.1. NAVSEA 389-0288 (Radiological Controls). 9.2. All work shall be accomplished in accordance with Federal, State, and Local Environmental, Safety laws and regulations. 9.3. Technical Work Documents issued by PNS. 9.4. Disclosure and access to the Naval Nuclear Propulsion Information (NNPI) shall be governed by the requirements of NAVSEAINST C5511.32B. 9.5. 29 CFR 1915 (Shipyard Industry). 9.6. 29 CFR 1910.1200 Hazardous Material/Hazardous Communication standard. 9.7. Material Safety Data Sheet (MSDS) 9.8. OSHA Directive Standard 2 (Identification of General Industry Safety and Health Standard Applicable to Shipyard Work). 9.9. Contractor employees shall be responsible to sign applicable documents (shift reports, verification signatures, etc.) to verify task completion in accordance with (IAW) requirements.

More opportunities from Department Of Defense → Portsmouth Naval Shipyard Gf

Same awarding agency

NAICS: 532490
New
Federal
Rental- 800 LPAC System- Naval Base Point Loma, San Diego, CA (PLOMA) Amendment 0001
Solicitation # N3904027Q0010
Portsmouth Naval Shipyard is soliciting quotes for the rental of one electric, oil-free 800 CFM Low Pressure Air Compressor (LPAC) system to be located at Naval Base Point Loma in San Diego, California. The required equipment package must include a 200 HP compressor, a 1000-gallon air receiving tank, a desiccant air dryer, and associated manifolds and hoses. The system must maintain a minimum working pressure of 150 PSI and comply with CGA G-7-1-2018, ISO 8573-12:2000, OSHA 29 CFR 1910.169, and NEMA 3 standards. The contractor is responsible for making final electrical connections to government-provided power sources and must be prepared to route up to 1500 feet of emergency-stop cabling. The period of performance consists of a five-week base period from November 2, 2026, to December 6, 2026, with a two-week optional extension from December 7, 2026, to December 20, 2026. This is a Total Small Business Set-Aside under NAICS 532490, with award based on the Lowest Price Technically Acceptable (LPTA) criteria, though the government may prioritize the soonest mobilization. Key deliverables include equipment technical manuals, a personnel roster, a maintenance support plan affixed to the machine in a waterproof case, and maintenance service reports. Proposals must be submitted via email by October 21, 2026, at 12:30 PM EST, and vendors must be registered in the System for Award Management (SAM).
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

1 day ago

DEADLINE

in about 12 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS