NW 13th Street Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves comprehensive right-of-way improvements along NW 13th Street, including milling, resurfacing, ADA ramp installation, and drainage enhancements. Additionally, it encompasses a joint participation agreement with the Miami-Dade Water and Sewer Department for installing an 8-inch water main, fire hydrants, and water services. Contractors are required to obtain all necessary permits, such as traffic and utility permits from Miami-Dade County and the City of Miami, respectively. Bidders must submit separate bids for roadway and water main work, with funding for the water main portion provided through the JPA, contingent upon inspection approval by MDWASD. If the bid for water main work exceeds 10% of the MDWASD estimate, the department may opt to perform the work in-house. The scope of work is detailed in the construction drawings. Prospective bidders must meet specific minimum qualifications, including holding a current Certified General Contractor license from Florida for at least five years and demonstrating at least five years of experience under the current business name. They must also have served as the prime contractor on at least three similar projects within the past decade, covering drainage, roadway reconstruction, and water/sewer system improvements, with a proven ability to coordinate multiple trades. Additionally, bidders must submit references using the designated form, confirming their role as the general contractor and that they self-performed at least 10% of the physical labor, ensuring compliance and project capability. The solicitation is posted by the City of Miami, with a response deadline of August 5, 2024, and a contract size estimated between $500,000 and $1,500,000.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Project consists of right-of-way improvements including milling and resurfacing, ADA ramps, and drainage. The Project also includes a Joint Participation Agreement (“JPA”) with the Miami-Dade Water and Sewer Department (“MDWASD”) for the installation of an 8-inch water main, fire hydrants, and water services. The Contractor must secure all necessary permits to construct the Project, including but not limited to, a Traffic Loop Permit from Miami-Dade County and a Utility Permit from the City of Miami. Contractors shall provide separate bids for the roadway work and the water main work. Watermain work shall be funded by JPA with MDWASD. If the total watermain work bid items are over ten percent (10%) of the MDWASD estimate, then MDWASD has the option to reject the bid alternate and perform the work with its own forces. Funding for watermain work will be released after satisfactory inspection by MDWASD. Additional information concerning the Scope of Work can be found in the Construction Drawings.
Minimum Requirements: Prospective Bidders shall comply with, and submit proof of, the following requirements by the Bid Due Date: 1) Have a current Certified General Contractor (“CGC”) license from the State of Florida for a minimum of five (5) years AND have a minimum of five (5) years’ experience under its current business name.
2) The General Contractor shall demonstrate experience as the Prime Contractor for at least three (3) projects -one (1) drainage, one (1) roadway reconstruction, and one (1) water/sewer system improvements- of similar size, scope, and complexity to the Project, currently ongoing or completed within the past ten (10) years. The General Contractor must have a proven track record of coordination with and between all applicable trades, including but not limited to structural, mechanical, and electrical, as may be required during the construction of the Project. 3) Reference projects must be submitted utilizing Form ITB-GCR and shall demonstrate that the General Contractor: i) was the General Contractor for the project; and ii) self-performed at least ten percent (10%) of the physical labor construction work for the project. Failure to meet this requirement will result in the bid submittal being deemed non-responsive.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS