Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Oak Street Elementary School Renovation Project

Forecast
2025275632State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Inglewood Unified School District

Place of Performance

W. Elm Avenue, S. Oak Street, W. Spruce Avenue, Inglewood, CA, 90301

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Inglewood Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Inglewood Unified School District
Office AddressN/A
Contacts
Raphael GuzmanIUSD Assistant Superintendent, Business Services / Chief Business Official

Full Description

Show more
The Oak Street Elementary School Renovation Project is proposed at the 193,926-square-foot campus of Oak Street Elementary School located at 633 South Oak Street (APN 4022-002-900) in Inglewood, Los Angeles County, California (Project Site). The Project Site is located within the western portion of the City and is bounded by Elm Avenue to the north; Oak Street to the east; Interstate-405 (I-405, San Diego Freeway) to the west; and Spruce Avenue (a cul-de-sac) to the south. The Project would remove five existing portable structures comprising 10 classrooms within the central portion of the school campus and replace them with three permanent one-story buildings comprising 10 classrooms. The new buildings would be 2,880 square feet, 4,320 square feet, and 5,720 square feet in size, each with a height of 11 feet, 5 inches. The Project is intended to modernize the campus to better accommodate current educational functions and would not increase student capacity or staffing needs. In addition, the Project would remove the existing athletic field within the western portion of the school campus to accommodate new outdoor play equipment and play areas, a 480-square-foot bathroom building, 43 new trees, and 5,820 square feet of landscaping. A new 21,600-square-foot athletic turf field with four pole-mounted lights would be constructed within the central portion of the campus where the existing portable classrooms would be removed. Of the three proposed classroom buildings, two would be located within the western portion of the campus and one would be located southeast of the new athletic field. The existing surface parking lot and structures within the eastern portion of the campus, including Buildings A, B, C, and a shade structure, would remain in place. Regular vehicle access would remain unchanged along Elm Avenue and Spruce Avenue, while two new access points for fire emergency vehicles would be provided within the western end of the campus along Elm Avenue and Spruce Avenue.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and ballasts. The project also requires repainting interior surfaces, installing new signage, and correcting plumbing deficiencies. This procurement is a Total Small Business Set-Aside under NAICS code 236220. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three equally weighted factors: Past Performance, Corporate Relevant Experience, and Price. The contractor must provide payment and performance bonds totaling 100% of the contract price and adhere to strict security and background check requirements, including FBI fingerprinting and DHS non-disclosure agreements. All work must comply with ADA/ABA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
Solicitation N4425527RB007 is an 8(a) Multiple Award Construction Contract (MACC) task order for a design-build project to repair fire sprinkler deficiencies at Building 290 and the adjoining Building 719 loading dock platform at Naval Base Kitsap, PSNS, in Bremerton, Washington. The contractor is responsible for final design documentation per FC 1-300-09N, labor, supervision, and all materials necessary to resolve critical hazards. Key deficiencies include a Risk Assessment Code Level 4 (RAC-4) deficiency regarding missing sprinklers at the loading dock, unmonitored and unlocked sprinkler control valves in basement elevator pits, and missing backflow preventers on wet pipe sprinkler system risers. Because Building 290 is on the historical register, any exterior modifications require approval from the State Historic Preservation Office (SHPO). The period of performance is 440 days from the award of the task order. Proposals are due by December 2, 2026, at 2:00 PM PST via the PIEE portal and will be evaluated based on price and MACC past performance. Required submissions include a cover letter, a completed schedule of prices, and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. The project mandates strict adherence to safety and technical standards, including EM 385-1-1, the International Plumbing Code, and UFC 3-420-01. Additionally, the contractor must provide a Quality Control Manager, a Site Safety and Health Officer, and comply with FAR 52.219-14 limitation of subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to be valued between $10 million and $25 million and is structured in two phases to ensure the facility remains operational and mission-capable throughout the process. Key scopes of work include the demolition and replacement of deteriorated components, the construction of a 400-square-foot addition for forklift battery charging, and the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. All design documents for both phases must be completed and approved during Phase 1. The contract requires strict adherence to Unified Facilities Criteria (UFC) and cybersecurity standards, including CMMC Level 1 and DFARS safeguarding requirements. Performance is measured by a multi-stage inspection process involving preliminary and final inspections, with specific testing for sound attenuation and electronic security systems. The base bid (CLIN 0001) must be completed within 360 calendar days of award, while the option (CLIN 0002) has a completion window of 1,082 calendar days. Award is based on price and MACC past performance. Proposals are due by December 7, 2026, via the PIEE portal.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of Building 1963 LBJ at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks, missing shingles, and storm damage. The contract is a single lump sum award, with the selection based on best value rather than the lowest price. Evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is scheduled for December 3, 2026, and proposals are due by December 14, 2026. The successful contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and start work within 14 days. Requirements include a one-year workmanship guarantee, a two-year manufacturer's product warranty, and compliance with EPA, OSHA, and Indiana state and local building codes. Bidders must provide a valid Indiana Contractor's License, a W9, a completed vendor questionnaire, and proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 SF multi-story steel frame laboratory and office facility, as well as an optional 17,978 SF laboratory facility. Construction features shallow foundations, structural steel framing, masonry and metal panel exterior walls, and standing seam roofs. The project also encompasses comprehensive site improvements, including a stormwater retention system, utilities, telecommunications, landscaping, and parking. Additionally, the demolition of Building 1272T, a 548 m2 engineering facility, is required. The contract is a small business set-aside, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran Owned Small Business, and Service-Disabled Veteran-Owned Small Business. Work is based on Davis Bacon Wage Rates and is exempt from sales tax. Bidding is open for various trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, and plumbing. Interested parties should contact Rahul Maheshwari at J&J Contractors, Inc. to receive bid invitations and documents via BuildingConnected.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This solicitation is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with all local, state, and federal building codes, while reusing existing closure systems and push bars. The contractor must provide a sequenced construction schedule, a dated punch list for substantial completion, and all necessary training and maintenance manuals. Work must be performed in accordance with EPA and OSHA regulations, and the contractor must adhere to Davis-Bacon Act wage rate decisions. The contract is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Proposals must be submitted as a single lump sum on official company letterhead by December 11, 2026, and must include a valid Indiana Contractor's License, a W9, and proof of insurance. A mandatory bid conference is scheduled for December 1, 2026, and a site visit is required. Payment terms are Net 30, and the project includes a one-year guarantee of workmanship.
Atterbury Job Corps – Adams & Associates

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
SLED
Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project
Solicitation # 4722
The County of Sacramento, through its Department of Airports, is soliciting Statements of Qualifications from qualified Construction Manager At Risk (CMAR) firms for the Airfield Maintenance (AFMX) Facility project at Sacramento International Airport. The project involves the construction of a new pre-engineered steel structure of approximately 20,000 square feet, with an additional 3,000 square foot accessory structure, designed to centralize maintenance equipment, vehicles, materials, and administrative functions. The estimated construction budget ranges from 17.5 million to 18.5 million dollars, with a base evaluation figure of 18 million dollars for the direct cost of work and general conditions. Eligible firms must hold a current Class B or higher California Contractors License, be registered with the California Department of Industrial Relations for public works, and possess experience with Guaranteed Maximum Price (GMP) contracts and government agencies. The selection process includes a pass/fail initial screening, an evaluation of qualifications, and interviews for the top three ranked respondents. The final award is based on interview performance and other solicitation criteria. The project is divided into a preconstruction phase and a construction phase, with final completion dates to be established during the first phase. The CMAR is responsible for all management, labor, materials, and supervision, ensuring compliance with OSHA, ADA, and FAA Advisory Circular 150/5370-26. Required submissions must be filed electronically via OpenGov by December 1, 2026, at 2:00 PM PST. Selected firms must provide performance and payment bonds and adhere to California Labor Code prevailing wage requirements.
Airports

POSTED

about 14 hours ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
SLED
General Construction Services For Campus Enclosure - Phase Two
Solicitation # PE-55046-NONST-2027-000000030
The Muscogee County School District is soliciting proposals for General Construction Services for Campus Enclosure - Phase Two in Georgia. The project involves providing metal and masonry fencing to secure the perimeters of multiple campuses, including Brewer, Clubview Elementary, Dimon Elementary, Kendrick High, Midland Middle, Reese Road Elementary, Richards Middle, Waddell Elementary, and Veterans Memorial Middle. The scope of work encompasses all typical construction trades, including mechanical, electrical, plumbing, demolition, painting, and finishes, while ensuring ADA and local ordinance compliance. The project is divided into pre-construction services, such as cost estimating and constructability analysis, and construction services. The contract will be executed using the AIA A133-2019 Standard Form of Agreement, with the successful proposer serving as the Construction Manager at Risk (CM). Payment is structured based on the cost of work plus a fee, with a guaranteed maximum price (GMP). Substantial completion is required no later than July 24, 2027. Proposers must provide proof of 100% performance and payment bonds and maintain comprehensive insurance, including a $5 million excess liability umbrella and builder's risk coverage for 100% of the GMP. Award decisions will be based on the best interest of the School District, evaluating the stability of the proposer, past performance, and the quality of the proposed management plan. Compliance with the Georgia Security and Immigration Compliance Act of 2006 is mandatory.
Muscogee County School District

POSTED

about 15 hours ago

DEADLINE

in about 2 months
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS