Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Offsite Infrastructure Improvements

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Offsite Infrastructure Improvements involves performing street and utility upgrades for prime contractors on projects within the City of Menifee, California. The scope of work includes road widening, general street improvements, and the extension of utility lines from the main grid to specific sites using standard road paving materials and utility conduits. The project requires formal approvals from both the City of Menifee and the County of Riverside to ensure compliance with local standards. The ultimate objective of the contract is the delivery of upgraded public streets and fully functional utility connections within the 92585 zip code area.

General Info

Subcontract for street and utility infrastructure improvements in Menifee, California.

Place of Performance

Menifee, CA, 92585

Set-Aside

NONE

Documents

This scope was carved out of PLN 22-0179.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Murrieta Road Warehouse Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Murrieta Road Warehouse Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Menifee
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Menifee
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs offsite street and utility upgrades for prime contractors on City of Menifee projects. Executes road widening, street improvements, and extension of utility lines from the main grid to the site using road paving materials and utility conduits. Requires City of Menifee and County of Riverside approvals. Delivers upgraded public streets and utility connections.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project managed by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29 from Coyote Creek Bridge to Diener Drive/Road 543 and Route 53 at Route 29, involving cold planing of AC pavement and the installation of Rubberized Hot Mix Asphalt Gap Graded overlay and Hot Mix Asphalt Type A surfacing. The project has an estimated cost of 14,400,000 USD, with bidding requirements specifying a bidder's security of at least 10 percent and a performance timeline between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, including strict Buy America/Build America requirements and environmental mandates. Contractors must ensure equipment is pressure washed to prevent invasive species and provide environmental product declarations for concrete and asphalt. Key personnel requirements include a safety representative with specific certifications from the Board of Certified Safety Professionals or the National Association of Safety Professionals, as well as valid first aid and CPR certifications. Job site activities must commence within 55 days of contract approval, and all work must adhere to local codes, MASH Test Level 3 safety standards, and RWQCB water quality objectives.
California Department of Transportation

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Ventura County On Route 1 From 0.2 Mile North Of Point Mugu To 0.1 Mile South Of Calleguas Creek Road And On Route 34 From 0.1 Mile East Of East Pleasant Valley Road To 0.8 Mile East Of Upland Road
Solicitation # 07-379604
The State of California Department of Transportation has issued solicitation 07-379604 for construction projects in Ventura County on Route 1 and Route 34. With an estimated value of 4,590,000 USD, the scope of work focuses on the installation of stormwater treatment Best Management Practices and Maintenance Vehicle Pullouts. Key deliverables include earthwork, aggregate bases, hot mix asphalt, and extensive hydroseeding. The project requires specialized management of aerially deposited lead contaminated material and the implementation of temporary traffic control systems, including radar speed feedback signs and crash cushions. Contractors must hold a Class A license or a combination of specific Class C licenses and submit bids on a unit price basis via Bid Express by December 10, 2026. Performance requires a Critical Path Method progress schedule and the designation of a certified on-site safety representative. Strict financial terms mandate that subcontractors be paid within 7 days and material suppliers within 30 days of progress payments. The contract also enforces Buy America standards, prevailing wage requirements, and specific DVBE utilization reports. Job site activities must commence within 55 days of Attorney General approval, provided that the baseline schedule and safety plans are accepted.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

POSTED

about 4 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
International
Transportation and Economic Corridors - Invitation to Bid - TND0026396 - Bridge Rehabilitation and Other Work
Solicitation # TND0026396
Alberta Transportation and Economic Corridors is soliciting bids for project TND0026396, focusing on the rehabilitation of a bridge carrying Highway 88 over the Wabasca River in the Peace Region. The scope of work includes bridge structure demolition and disposal, traffic accommodation, and the installation of various materials such as asphalt concrete pavement, heavy rock riprap, waterproofing, and concrete sealer. The contractor is responsible for supplying all materials and must adhere to the 2020 Standard Specifications for Bridge Construction and specific material standards for steel and bolts. The project must be completed by October 30, 2027. Tenders must be submitted in an unprotected PDF format via email to [email hidden] by December 16, 2026, at 2:01:00 p.m. Each submission must include a digital bid bond equal to 10 percent of the tender amount and evidence of a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or Certificate of Recognition Equivalency Letter (COREL); notably, SECOR is not acceptable. The contract will be awarded to the lowest priced compliant bidder, provided they demonstrate sufficient experience, qualifications, and financial capability. Payment is processed within 28 days of receiving a proper invoice for work performed during the monthly cycle from the 26th to the 25th.
Transportation and Economic Corridors

POSTED

about 4 hours ago

DEADLINE

in 30 days
View Details

More opportunities from California → City of Menifee

Same awarding agency

NAICS: 237130
SLED
Seaflower Energy Storage System Project
Solicitation # PLN 25-0027
The Seaflower Energy Storage System Project, identified by solicitation number PLN 25-0027, involves the construction and operation of a 100 MW / 400 MWh utility scale battery energy storage system in Menifee, California. The facility will utilize lithium iron phosphate or similar battery modules arranged on racks within individual containers, including 102 SolBank 3.0 enclosures. The system is designed to interconnect with the Southern California Edison Valley Substation and will feature automated monitoring and remote management systems, eliminating the need for permanent onsite staff. Site infrastructure will include power conversion equipment, a security fence or wall, and a permanent parking area for periodic maintenance and inspection visits. The project has undergone extensive environmental and technical evaluations, including a Mitigated Negative Declaration, geotechnical investigations, and a Hazard Mitigation Analysis to ensure compliance with the 2022 California Fire Code. Assessments have covered air quality, greenhouse gas emissions, noise levels, and biological resources across the approximately 4 acre site. Cultural resource surveys indicate a low to moderate potential for archaeological deposits, necessitating monitoring during ground disturbance. Traffic analysis suggests minimal impact, with an estimated 9 daily trips. The City of Menifee Planning Commission scheduled a public hearing for October 28, 2026, following a public review period that concluded on October 21, 2026.
Power and Communication Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Heritage Valley Business Center
Solicitation # PLN24-0195
The Heritage Valley Business Center project, identified as Plot Plan No. PLN24-0195, involves the development of a 41.16-acre site in the City of Menifee, California. The project consists of the construction of a concrete tilt-up building totaling 829,755 square feet, which includes 819,755 square feet of warehouse space and 10,000 square feet of office space. Site improvements include 503 automobile parking spaces, 258 truck trailer parking spaces, 111 dock high doors, and associated infrastructure such as sewer, storm drains, utilities, and roadway improvements. The project site encompasses ten parcels and is located east of Interstate 215 and Trumble Road, south of Ethanac Road, and north of McLaughlin Road. The development requires several entitlements, including a General Plan Amendment, Specific Plan Amendment, Change of Zone, and a Plot Plan. The project has undergone an environmental review process in compliance with the California Environmental Quality Act, resulting in a Final Environmental Impact Report and a Notice of Determination filed in June 2026. Key regulatory requirements include adherence to ADA Standards, South Coast AQMD permits for equipment, and potential National Pollutant Discharge Elimination System permits. Additionally, the project must comply with the Homeland/Romoland - Line A Area Drainage Plan and ensure the prohibition of truck traffic on Trumble Road to maintain safety. All district facilities must be constructed to specific standards and are subject to district plan check and inspection for final acceptance.
Land Subdivision

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Menifee Valley Specific Plan
Solicitation # PLN 26-0006
The City of Menifee, California, is advancing the Menifee Valley Specific Plan through the approval of Tentative Tract Map No. PLN 25-0161, which proposes subdividing approximately 13.26 gross acres into 60 single-family residential lots, with an additional 1.22 acres designated as common area landscape and trails, designated as lots 61 through 71. The project is located west of Briggs Road, north of Matthews Road, east of Menifee Road, and south of McLaughlin Road within Riverside County, and is being processed under the California Environmental Quality Act (CEQA), with compliance documented through the Menifee Valley Specific Plan Environmental Impact Report (SCH #2022030233), a Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Plan. The applicant is Minor Ranch LLC, with Shaun Bowen designated as the developer contact, while the City of Menifee’s Community Development Department, led by Principal Planner Ryan Fowler and Associate Planner Desiree McGriff, serves as the lead agency responsible for environmental review, approval, and oversight. The project does not involve federal procurement processes, as no Federal Acquisition Regulation (FAR) clauses, federal contract types, or procurement evaluation factors are applicable; instead, it operates under local land-use authority. Payments for environmental filing fees are handled locally at 29844 Haun Road, Menifee, CA 92586, with accepted methods including cash, check, credit, or other forms, and a $50 county documentary handling fee applies. There is no specified contract value, delivery schedule, or federal funding mechanism, as the effort centers on land subdivision approval and environmental mitigation compliance rather than the acquisition of goods or services under federal contract guidelines. Inspection and acceptance are governed by the City’s planning and environmental standards, with no technical construction codes or federal packaging, labeling, or accounting requirements referenced.
Land Subdivision

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Trumble and Watson Warehouse - Plot Plan No. PLN22-0190
Solicitation # PLN22-0190
Plot Plan No. PLN22-0190 involves the development of the Trumble and Watson Warehouse on a 17.19-acre site located near the southeast corner of Watson Road and Trumble Road in Menifee, California. The project consists of a 328,227 square foot speculative warehouse building, which includes 15,000 square feet of office space and 33 dock-high doors. Site improvements include 422 total parking spaces, comprising 126 trailer spaces and 296 automobile spaces, with access provided by two driveways off Trumble Road. Additional scope includes 96,975 square feet of landscaping, on-site walls, fencing, infrastructure, and the construction of frontage and associated roadway improvements. The project was approved by the City of Menifee on July 15, 2026, following a Mitigated Negative Declaration under the California Environmental Quality Act. Comprehensive technical assessments have been completed, including a geotechnical report for seismic and foundation design, a preliminary hydrology study, and a water quality management plan. Environmental compliance is managed through a Mitigation Monitoring and Reporting Program focusing on biological resources, dust control, and nesting bird surveys. Traffic analysis indicates the project is within a low VMT area, though the California Public Utilities Commission has recommended safety evaluations for the Watson Road at-grade highway-rail crossing. Construction must adhere to strict geotechnical inspection standards, requiring written acceptance from consultants for all fill materials.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS