Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Old Ocean City Road Corridor Sewer Extension Preliminary Engineering Report

Closed
2026-RFP-127State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
Field coordinator services
Solicitation # RFP 25048
The British Columbia Hydro and Power Authority (BC Hydro) is soliciting proposals under RFP 25048 for Field Coordinator Services to support the installation of new substation and generation equipment, station one-line updates, and substation capital projects within the Lower Mainland and Bridge River region. The selected consultant will provide an expert in electric utility commissioning procedures responsible for verifying that all required tests are performed and signing the Construction Notification of Energization (CNE) to confirm equipment is ready for initial energization. The contract is expected to run from approximately December 2026 to December 2028, with an optional one-year extension for a total duration of three years. Compensation is based on time spent by personnel, and all invoicing must be processed through the Ariba system with a 30-day payment term. Proposals must be submitted by November 16, 2026, via the BC Bid e-service or physical delivery to the Burnaby, BC bid station. Evaluation is based on the highest weighting of criteria, including mandatory compliance with the Freedom of Information and Protection of Privacy Act (FOIPPA). Proponents must provide comprehensive documentation, including health, safety, and cybersecurity questionnaires, as well as relationship disclosure statements. Key requirements include strict adherence to environmental packaging standards, such as the use of PVC-free and recyclable materials, and the assignment of qualified personnel who cannot be changed without prior approval from BC Hydro. The award process allows BC Hydro to reject any proposal that presents a material risk regarding financial resources, safety records, or cybersecurity.
British Columbia Hydro and Power Authority

POSTED

about 14 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
International
Village of Valemount Engineering for Accessiblity Impromvements at Cranberry Marsh
Solicitation # 2480-95-26
The Village of Valemount is seeking proposals under solicitation 2480-95-26 for engineering services to implement accessibility improvements at the Cranberry Marsh Boardwalk in British Columbia. The objective is to develop a shovel-ready planning package that includes a preferred concept plan, concept design drawings, and a Class C cost estimate. Additionally, the selected proponent must provide documentation and recommendations to support future grant applications, specifically for SHORE Stream 2. The total available budget for this project is up to 55,000 dollars, excluding GST, which must cover all professional fees, travel, and disbursements. The project must be completed by April 30, 2027, with a start date to be negotiated. All work must strictly adhere to the DWB Environmental Management Plan, requiring a qualified Environmental Monitor for sensitive phases and ensuring machinery is clean and leak-free to protect the wetland. Technical specifications require compliance with CAN/CSA-56-06 for design, CSA164 for galvanizing, and CSA G40.21M for structural steel. Proponents must submit a fixed-fee budget by phase, a work program, and a letter of introduction. This process is a request for proposals rather than a formal tender, and the Village reserves the right to negotiate a separate contract independently of the RFP process.
Village of Valemount

POSTED

about 15 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract titled "Old Ocean City Road Corridor Sewer Extension Preliminary Engineering Report" issued by the Maryland Public Works agency focuses on addressing septic system failures within a designated study area comprising twelve priority focus areas, eleven of which have documented failing septic systems. Emphasis is placed on existing improved properties rather than growth areas, with sewer extension priorities driven by potential septic system failures. The contract calls for engineering evaluations based on septic system status, parcel development potential according to the County's approved Septic Tier Maps, and includes detailed parcel counts and data for improved properties within each priority area. The contract is a solicitation published on May 13, 2026, with a response deadline of June 25, 2026, under the solicitation number 2026-RFP-127. It incorporates Wicomico County’s standardized terms and conditions—which govern contract amendments, compliance with laws, insurance requirements, indemnification, and other key legal provisions—to ensure regulatory alignment and risk management. The contracting agency is located in Salisbury, Maryland, with primary contacts including the Executive Director of Environmental Health & Services and the Purchasing Agent. The contract mandates adherence to professional standards while addressing wastewater infrastructure improvements critical for environmental health and property upkeep within the affected corridor.

General Info

Engineering report for sewer extension addressing failing septic systems in twelve Maryland priority areas.

Place of Performance

MD, USA

Set-Aside

NONE

Documents

7

2026-RFP-127 Old Ocean City Road Corridor Sewer Extension Preliminary Engineering Report

PDF, High priority: read this firstrfp
High

Old Ocean City Road Corridor Preliminary Engineering Report RFP

PDF, High priority: read this firstrfp
High

Old Ocean City Road Corridor Sewer Extension PER RFP

PDF, High priority: read this firstrfp
High

Wicomico County Old Ocean City Road Corridor Sewer Extension Preliminary Engineering Report Solicitation

PDF, High priority: read this firstrfp
High

Wicomico County Standard Terms and Conditions

PDF, High priority: read this first4 pages · standard-terms-and-conditions
High

Wicomico County Standard Terms and Conditions - Professional Services

PDF, High priority: read this first5 pages · standard-terms-and-conditions
High

Old Ocean City Road Priority Focus Areas

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → Public Works
Contacts2 people available
OfficeSalisbury, MD, 21801, USA
Organization / AgencyMaryland → Public Works
Office AddressSalisbury, MD, 21801, USA
Contacts
Jeanna HenryExecutive Director of Environmental Health & Services
Amy KernodlePurchasing Agent

Interested Companies (19)

AB ConsultantsLanham, MD

See All 19 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
There are twelve (12) priority focus areas in the full study area with known failing septic systems in eleven (11) of the twelve (12) priority focus areas. The full study area and priority focus areas are shown on the provided map. Priority for the service areas should be given to areas with potential for septic system failure. The priority focus areas are existing improved properties, not for growth. Vacant parcels shall be allocated a EDU based on the parcels ability to be developed within the County per the approved Septic Tier Maps. Attached is a table that provides parcel counts and improved parcels within each priority focus areas.

More opportunities from Maryland → Public Works

Same awarding agency

NAICS: 541330
SLED
Fruitland Sewer Extension Preliminary Engineering Report
Solicitation # 2027-RFP-033
Wicomico County is soliciting proposals under solicitation 2027-RFP-033 for professional engineering services to develop a Preliminary Engineering Report (PER) for the Fruitland Sewer Extension Project. The primary objective is to evaluate alternatives for providing public sewer service to seven specific focus areas around Fruitland, prioritizing locations prone to septic system failure. The project assumes connection to the City of Fruitland municipal sewer system and treatment at the City of Fruitland WWTP. While the scope excludes analysis of the treatment plant's capacity, the selected vendor must identify necessary upgrades for existing downstream pumping stations and sanitary sewers. The PER must comply with USDA RUS Bulletin 1780-2 and build upon the Wicomico County Water and Sewer Master Plan from September 2021. The contract will be awarded based on best value for money, with evaluation heavily weighted toward demonstrated experience, technical expertise, and project approach (35%), as well as the capacity to deliver products timely (15%). Required deliverables include a life cycle present worth cost analysis of feasible options, detailed cost estimates, and conceptual schematics. The successful vendor must provide a lump sum fee proposal and execute an Agreement for Engineering Services using EJCDC documents per RUS Bulletin 1780-26. Key administrative requirements include providing a Maryland Certificate of Status, submitting insurance certificates within ten days of award, and executing the contract within fourteen days of receipt. Proposals are due by December 2, 2026, at 2:30 pm via the electronic procurement portal.
Engineering Services

POSTED

11 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS